Loading...
HomeMy WebLinkAboutGlobe Asphalt Paving Co/Eng/CO #1/39,871.98/Towne Road TrailCITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 1 DATE: 4/6/2017 Globe Asphalt Paving Co., Inc. PROJECT NAME: Towne Road Trail P.O. Box 19168 CITY REQ. NO.: Indianapolis, IN 46219 CITY PO NO.: 100180 ATTN: Tim Toby CITY PO DATE: February 16.2017 I. You are directed to make the following changes in this Contract: I. Where subgrade is not suitable to construct the trail, remove unsuitable material and install geogrid with No. 53 compacted aggregate. 2. Install a new inlet, install new pipe, and connect the legal drain to the structure due to burying the existing inlet under the trail as it was not picked up by the survey. ITEM 4 - Excavation, Common 11 - Compacted Aggregate No. 53 Base 49 - Geogrid for Subgrade Stabilization 50 - Storm Structure Installation at Hamilton County Legal Drain SCHEDULED ADJUSTMENT AMOUNT (+) OR(-) DAYS $7,953.00 + 1 Day $15,906.00 + 2 Day $9,750.00 + 1 Day $6,262.98 + 1 Day II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 503 892.58 Contract Price will be increased/deereased by this Change Order $ 39,871-98 New Contract Price including this Change Order $ 543 764.56 Contract Time Prior to this Change Order 77 Days 6/16/2017 Completion Date Net increased/deeFeased-resulting from this Change Order 5 Days Current Contract Time including this Change Order 82 Days 6/25/2017 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended: Accepted: USI Consultants, Inc. . ENGINEER 8415 East 5611' Street Address Indianapolis, IN 4621-6 City/State/Zip By: Phone: LigI -37sf Date: 2 - 2a/ 7 Globe Asphalt Paving Co., Inc. CONTRACTOR P.O. Box 19168 Address Indianapolis, IN 46219 City/State/Zip B% Phone:: PI Date: - 2- Zy 1? Date: v a1/711 u bt uonsuitanzs, inc. Lnange . uraer petans GOf1SU�tc�fltS '!'owne Road 'bail Description: City of Carmel Project No. 16-8W-1,8, Towne Road Trail and Culvert Replacement 96th Street to 106th Street Change Order: 1 Date Created: 03/23/2017 Status: Types Pending Approval Changed' Conditions Date Approved: Summary: Geogrid for Soil Stabilization, and Storm Structure Installation Change Order Description: Several new items are required in order to complete construction of the Towne Road Trail Project. UTndercuttiting, eogri , and NQ.Comparted Agtir Urate In areas where, the subgrade is not suitable to construct the trail, geogrid will be used with along with No. 53 compacted aggregate after the unsuitable material is removed. This work is an unforseen site condition. See attached proposal from the contractor Structure Installation at the Hamilton Count' Legal Drain A proposal was provided by Globe Asphalt to install a new inlet, install new pipe, and connect the legal drain tile to the structure. This work is required by the Hamilton County Surveyors office as the existing inlet will be buried under the trail. This inlet allows water to flow into the legal drain and reduces flooding to the east. This work is an unforeseen site condition. The inlet was covered by debris, and was not picked up by the survey. See attached proposal from the contractor,and detailed drawing from the Surveyor. We Agree with the contractors price to complete this work. Awarded Project Amount: $503,892:58 Authorized Project Amount: $503,892.58 Change Order Amount: $39,871.98 Revised Project Amount: $543,764.56 Increases/J)ecreases Line Nuri er Item ;Unit Unit -Price- Current Ch=ange Revised;. _. Quantity Amount Quantity . Amount .Quantity -Amouni Section: 1 -.Default Section 4 Towne Road Item 4 C.Y. $26.510 792.00 $20,995.92 300.00 $7,953.00 1,092.00 $28,948.92 EXCAVATION, COMMON Reason: Stabilize Subgrade - Undercutting to remove unsuitable soil ChannA Ordnr Dnfails: TnwnR Rnnd Trail Pana 1 of 2 03%23/201' Line Number Item Unit Unit Pnce'. :Current Change Revfised Quantity Amount Quantity Aniount ` Quantity Ainount 11 Towne Road Item 11 TON $26.510 1,194.00 $31,652.94y 600.60 $15,906.00 1,794.00 $47;55.8.99 COMPACTED AGGREGATE NO. 53 BASE Reason _Stabilize,.Subgrade�Replace..Unsuitable.Soil with Aggregate _ �(2 Items), Totals $52,648 86 a $23,859'00 $76,507 86 N ew Items Line:°Number .,Item. y+ ? Umt_ ^ ,Pendin --1uanti UnitPrfce g ty Dollar Amount I Section 1= Default ,Section `; y - 0490 Towne Road Item 49 SYS 1;500.00 $6.500 $9,750.00 _._-._ Ge.o.grid.for_S-ubgrade.S.tabilization ----_ Reason: S tabilize Subgrade - Geogrid used for unsuitable soil locations 0500 Towne Roan Item 50 LSUM 1.00 $6,262.980 $6,262.98 Storm Structure Installation at Hamilton County Legal Drain Reason: Install Structure and Pipe as Requested by Surveyor r (2 Items) Total +$16,012 98 this Change Urcler Is Approved .Vor Construction. - USI Consultants Inc.. Globe Asphalt City of Carmel S_- 2 --2-0.17 Date. Date Date C;hnnan Order Details: Towne Road Trail Pane 2 of 2 03/2.3/201' �n Globe Asphalt Paving Co., Inc. P.O. Bos 19169 Indianapolis, IN 46219 Plione - (3 17) 568-4344 FAX .— (3 (.7).568-4277 CHANGE ORDER REQUEST NUMBER: ItI DATE: 3/16/17 TO CONTRACTOR/OWNEA: City of Carmel One Civic Square Carmel, I14 46032 Change Order Request As Follows: PROJECT: Towne Road Trail Item 449 Geogrid $ 6.50/SYS G7Ev6410 l 7n, 4i;> smy� 3 on �Y S r Goo i Cost: S TOTAL COST See Above Dne and Payable on Completion of Work Prices as quoted effective for a period of 30 days from (late of proposal. Proposal accepted subject to Delays or r N. on -Performance occasioned by causes beyond our control --= by strikes, shortage of labor, fires, -accidents or acts of Cod. Costs associated withcollection will be paid by purchaser. GLOBE ASPHALT PAVING CQ:, INC. . 11 Accepted: Purchaser ByBy Date Tim Toby, Sales Address Pleose Sign and Relnrn One Copan movinglNFRASTRUCTUREforward >> From: Tim Toby jmailto:Ttoby globeasphalt:coml Sent: Tuesday, March 21, 2017 10:38 AM To; Scott Dick <sdick@usiconsultants.com> Subject: RE: Unmarked inlet - Labor $ 1,878.18 Equipment $ 1,635:90 Materials $ 1,772:60 Other Items 350.00 $ 5,636.68 10% Gross Margin 626.30 $ 6;262.98 -------- 514-9448 c Total of man: 30 hrs. Skid steer, Tack hoe, trucks,.... Stone; concrete, inlet, 12" RCP,fittings.... Survey, staking.... Total. Cost Mark up Sell Price From: Scott Dickfmailto:sdick@usiconsultants.com] Sent: Monday, March 20, 2017 9:21 AM To: Curtis Herald <CHerald@eaglevallevinc.com>; Tim Toby <Ttobv@globeasphalt.com> Cc: Cameron Meredith <cmeredith@usiconsultants.com> Subject: FW: Unmarked inlet Tim and Curtis, Please provide a proposal to complete the work to install a new structure as per the attached drawing from the Hamilton County Surveyors office. We will need a breakdown of the equipment, manhours, and materials for this work. Thanks, Scott Dick I Construction Services Manager USI Consultants, Inc. Office: (317) 544.4996 [ Direct: (317) 522.2492 1 Cell: (317) 441.3751 sdick@usiconsultants.com I .www.usiconsultants.com movinglNFRASTRUCTUREforward From: Greg R. Hoyes [mailto:Gree.Hoves@hamiltoncounty.in.gov-] Sent: Friday, March 17, 2017 2:31 PM To: Greg Wendling <gwendling@usiconsultants.com> Cc: Ogg, Chris <cogg@carmel.in.gov>; Cameron Meredith <cmeredifh@usiconsultants.com>; Scott Dick <sdick@usiconsultants.com>; Kenton C. Ward <Kenton.Ward@hamiltoncounty.in.gov>; Luther M. Cline <Luther.Cline@ hamiltoncounty.in.gov>; Steve A. Baitz <Steve.Baitz@hamiltoncounty.in.gov> Subject: RE: Unmarked inlet Greg Here is what we came up with this morning and Kent just Wed. This is not ideal; but gets the path in. The big issue would be in the tile collapses under the roadway, we would have to dig up the path also to replace from the existing box to across the ROW. Ideally, the transition from RCP to the old tile would be between the path and edge of road, but that P.I 34+51 39 11P1� Dj UVE = - 'A3°20'1 9t1 _ r w°i 2 Rt _ w.j 8.0 Tons Revetment Itiprap & . Sys Geotextiles Req d 4 0 ' -P I X34+9 16 P e RPmnV ��`/ 1 _ y; e: m, 12 .Dual Wall 5 { yJ j HDPE to make r�=2302 17 Lt ►alk Reg'd. connection of old x_ _ New 2' x 2' box: ,,. _ � tile. Concrete collar.' with 342 casting ' 6'B Fen _ O�/ - I at. connection jbint. O _ h `�PL15 .C24 -'r„ ra 1_ 4 20 z ter' 44 ', f0' .:: BYAGE& UM. ESMNT Sign / Sealed concrete W flattop on .2' x 2' R-212 . 211 box. r 1310+ = - - 1311 b0 - ., GAS : GAS St�J Sti+J Sv7c)n " P 7 Lb 77,!Q End Curb / Handrail / Sta 35+75 ..P.. 131200 Sv- Clean otR�prap TI i i