HomeMy WebLinkAboutGlobe Asphalt Paving Co/Eng/CO #1/39,871.98/Towne Road TrailCITY OF CARMEL
TO: CONTRACT CHANGE ORDER NO.: 1
DATE: 4/6/2017
Globe Asphalt Paving Co., Inc. PROJECT NAME: Towne Road Trail
P.O. Box 19168 CITY REQ. NO.:
Indianapolis, IN 46219 CITY PO NO.: 100180
ATTN: Tim Toby CITY PO DATE: February 16.2017
I. You are directed to make the following changes in this Contract:
I. Where subgrade is not suitable to construct the trail, remove unsuitable material and
install geogrid with No. 53 compacted aggregate.
2. Install a new inlet, install new pipe, and connect the legal drain to the structure due to
burying the existing inlet under the trail as it was not picked up by the survey.
ITEM
4 - Excavation, Common
11 - Compacted Aggregate No. 53 Base
49 - Geogrid for Subgrade Stabilization
50 - Storm Structure Installation at Hamilton County Legal Drain
SCHEDULED ADJUSTMENT
AMOUNT (+) OR(-) DAYS
$7,953.00 + 1 Day
$15,906.00 + 2 Day
$9,750.00 + 1 Day
$6,262.98 + 1 Day
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 503 892.58
Contract Price will be increased/deereased by this Change Order $ 39,871-98
New Contract Price including this Change Order $ 543 764.56
Contract Time Prior to this Change Order 77 Days 6/16/2017 Completion Date
Net increased/deeFeased-resulting from this Change Order 5 Days
Current Contract Time including this Change Order 82 Days 6/25/2017 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Approved:
Recommended: Accepted:
USI Consultants, Inc. .
ENGINEER
8415 East 5611' Street
Address
Indianapolis, IN 4621-6
City/State/Zip
By:
Phone: LigI -37sf
Date: 2 - 2a/ 7
Globe Asphalt Paving Co., Inc.
CONTRACTOR
P.O. Box 19168
Address
Indianapolis, IN 46219
City/State/Zip
B%
Phone:: PI
Date: - 2- Zy 1?
Date: v a1/711
u bt uonsuitanzs, inc.
Lnange . uraer petans
GOf1SU�tc�fltS '!'owne Road 'bail
Description: City of Carmel Project No. 16-8W-1,8, Towne Road Trail and Culvert
Replacement 96th Street to 106th Street
Change Order: 1 Date Created: 03/23/2017
Status:
Types
Pending Approval
Changed' Conditions
Date Approved:
Summary: Geogrid for Soil Stabilization, and Storm Structure Installation
Change Order Description: Several new items are required in order to complete construction of the Towne
Road Trail Project.
UTndercuttiting, eogri , and NQ.Comparted Agtir Urate
In areas where, the subgrade is not suitable to construct the trail, geogrid will be used with
along with No. 53 compacted aggregate after the unsuitable material is removed. This work is
an unforseen site condition. See attached proposal from the contractor
Structure Installation at the Hamilton Count' Legal Drain
A proposal was provided by Globe Asphalt to install a new inlet, install new pipe, and
connect the legal drain tile to the structure. This work is required by the Hamilton
County Surveyors office as the existing inlet will be buried under the trail. This inlet
allows water to flow into the legal drain and reduces flooding to the east. This work is an
unforeseen site condition. The inlet was covered by debris, and was not picked up by the survey.
See attached proposal from the contractor,and detailed drawing from the Surveyor. We
Agree with the contractors price to complete this work.
Awarded Project Amount: $503,892:58
Authorized Project Amount: $503,892.58
Change Order Amount: $39,871.98
Revised Project Amount: $543,764.56
Increases/J)ecreases
Line Nuri er Item ;Unit Unit -Price- Current Ch=ange Revised;.
_.
Quantity Amount Quantity . Amount .Quantity -Amouni
Section: 1 -.Default Section
4 Towne Road Item 4 C.Y. $26.510 792.00 $20,995.92 300.00 $7,953.00 1,092.00 $28,948.92
EXCAVATION, COMMON
Reason: Stabilize Subgrade - Undercutting to remove unsuitable soil
ChannA Ordnr Dnfails: TnwnR Rnnd Trail Pana 1 of 2 03%23/201'
Line Number Item Unit Unit Pnce'. :Current Change Revfised
Quantity Amount Quantity Aniount
` Quantity Ainount
11 Towne Road Item 11 TON $26.510 1,194.00 $31,652.94y 600.60 $15,906.00 1,794.00 $47;55.8.99
COMPACTED AGGREGATE NO. 53 BASE
Reason _Stabilize,.Subgrade�Replace..Unsuitable.Soil with Aggregate _
�(2 Items), Totals $52,648 86 a $23,859'00 $76,507 86
N ew Items
Line:°Number .,Item. y+ ? Umt_ ^ ,Pendin --1uanti UnitPrfce
g ty Dollar Amount
I Section 1= Default ,Section `; y -
0490 Towne Road Item 49 SYS 1;500.00 $6.500 $9,750.00
_._-._ Ge.o.grid.for_S-ubgrade.S.tabilization ----_
Reason: S tabilize Subgrade - Geogrid used for unsuitable soil locations
0500 Towne Roan Item 50 LSUM 1.00 $6,262.980 $6,262.98
Storm Structure Installation at Hamilton County Legal Drain
Reason: Install Structure and Pipe as Requested by Surveyor
r (2 Items) Total +$16,012 98
this Change Urcler Is Approved .Vor Construction.
- USI Consultants Inc..
Globe Asphalt
City of Carmel
S_- 2 --2-0.17
Date.
Date
Date
C;hnnan Order Details: Towne Road Trail Pane 2 of 2 03/2.3/201'
�n Globe Asphalt Paving Co., Inc.
P.O. Bos 19169
Indianapolis, IN 46219
Plione - (3 17) 568-4344
FAX .— (3 (.7).568-4277
CHANGE ORDER REQUEST NUMBER: ItI
DATE: 3/16/17
TO CONTRACTOR/OWNEA:
City of Carmel
One Civic Square
Carmel, I14 46032
Change Order Request As Follows:
PROJECT:
Towne Road Trail
Item 449 Geogrid $ 6.50/SYS
G7Ev6410 l 7n, 4i;>
smy� 3 on �Y S r Goo i
Cost: S
TOTAL COST See Above
Dne and Payable on Completion of Work
Prices as quoted effective for a period of 30 days from (late of proposal.
Proposal accepted subject to Delays or r N. on -Performance occasioned by causes beyond our control --= by strikes, shortage of
labor, fires, -accidents or acts of Cod. Costs associated withcollection will be paid by purchaser.
GLOBE ASPHALT PAVING CQ:, INC.
. 11 Accepted:
Purchaser
ByBy
Date
Tim Toby, Sales
Address
Pleose Sign and Relnrn One Copan
movinglNFRASTRUCTUREforward >>
From: Tim Toby jmailto:Ttoby globeasphalt:coml
Sent: Tuesday, March 21, 2017 10:38 AM
To; Scott Dick <sdick@usiconsultants.com>
Subject: RE: Unmarked inlet -
Labor
$ 1,878.18
Equipment
$ 1,635:90
Materials
$ 1,772:60
Other Items
350.00
$ 5,636.68
10% Gross Margin
626.30
$ 6;262.98
--------
514-9448 c
Total of man: 30 hrs.
Skid steer, Tack hoe, trucks,....
Stone; concrete, inlet, 12" RCP,fittings....
Survey, staking....
Total. Cost
Mark up
Sell Price
From: Scott Dickfmailto:sdick@usiconsultants.com]
Sent: Monday, March 20, 2017 9:21 AM
To: Curtis Herald <CHerald@eaglevallevinc.com>; Tim Toby <Ttobv@globeasphalt.com>
Cc: Cameron Meredith <cmeredith@usiconsultants.com>
Subject: FW: Unmarked inlet
Tim and Curtis,
Please provide a proposal to complete the work to install a new structure as per the attached drawing from the
Hamilton County Surveyors office.
We will need a breakdown of the equipment, manhours, and materials for this work.
Thanks,
Scott Dick I Construction Services Manager
USI Consultants, Inc.
Office: (317) 544.4996 [ Direct: (317) 522.2492 1 Cell: (317) 441.3751
sdick@usiconsultants.com I .www.usiconsultants.com
movinglNFRASTRUCTUREforward
From: Greg R. Hoyes [mailto:Gree.Hoves@hamiltoncounty.in.gov-]
Sent: Friday, March 17, 2017 2:31 PM
To: Greg Wendling <gwendling@usiconsultants.com>
Cc: Ogg, Chris <cogg@carmel.in.gov>; Cameron Meredith <cmeredifh@usiconsultants.com>; Scott Dick
<sdick@usiconsultants.com>; Kenton C. Ward <Kenton.Ward@hamiltoncounty.in.gov>; Luther M. Cline
<Luther.Cline@ hamiltoncounty.in.gov>; Steve A. Baitz <Steve.Baitz@hamiltoncounty.in.gov>
Subject: RE: Unmarked inlet
Greg
Here is what we came up with this morning and Kent just Wed. This is not ideal; but gets the path in. The big issue
would be in the tile collapses under the roadway, we would have to dig up the path also to replace from the existing box
to across the ROW. Ideally, the transition from RCP to the old tile would be between the path and edge of road, but that
P.I 34+51 39 11P1�
Dj UVE = -
'A3°20'1 9t1 _ r
w°i
2 Rt _
w.j 8.0 Tons Revetment Itiprap & .
Sys Geotextiles Req d
4 0 '
-P I X34+9 16 P e
RPmnV ��`/
1 _
y;
e:
m, 12 .Dual Wall
5 {
yJ j HDPE to make r�=2302 17 Lt
►alk Reg'd.
connection of old x_ _ New 2' x 2' box:
,,. _ �
tile. Concrete collar.' with 342 casting
' 6'B Fen _ O�/ -
I at. connection jbint. O _ h `�PL15
.C24 -'r„ ra
1_ 4
20
z
ter' 44 ', f0' .:: BYAGE& UM. ESMNT
Sign /
Sealed concrete
W
flattop on .2' x 2' R-212 . 211
box.
r
1310+ = - - 1311 b0
- .,
GAS : GAS St�J Sti+J Sv7c)n "
P 7
Lb
77,!Q End Curb / Handrail /
Sta 35+75 ..P..
131200
Sv-
Clean otR�prap
TI
i
i