Loading...
311485 05/23/17 >; CITY OF CARMEL, INDIANA VENDOR: 365826 ONE CIVIC SQUARE AUTOMATEDLOGIC CHECK AMOUNT: $****"2,205.00" CARMEL, INDIANA 46032 PO BOX 403257 CHECK NUMBER: 311485 �M,iroN ATLANTA GA 30384-3257 CHECK DATE: 05/23/17 . DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 1093 4350100 154192 2,205.00 BUILDING REPAIRS & MA w c O (Dp N � o pD w at o Z D Z o o n n Z O ' a < �': >: o cn O_ O C p> a j n tD Z ; o N O t m o -n .. . v a o m a p D * ?> o o W C1 N Z::fiJ::::::t: 0 O m o a CL o En nD O to : : . N N Z C o O O CD o g 3 ? ? m 0 m Cf) o <• c m c CD O �' CA 3 a =r U o CD °' w 0 -� x1 O CD O n 1 .; n -D Uj• CD c �« C 0) N 0) N a N 7 =r.3+ (n �G CD:E m a Cn 0 0 � _ m J m 3 O coN m c N @ N. (D 0 O m O d S N CD --j CD s v a a m a 9 O o. m S < CD N O j O 0' n Q a O =r 2, CD 7 m V1 O O � Automated Logic - Indiana SERVICE INVOICE: 154192 117 AttOMATEDLOGIC Muncie,HINh47305et Tel: (765) 286-1993 s HAY2011 BY: BILL TO: SHIP TO: 84CARME002 000001 CARMEL CLAY MONON CENTER CARMEL CLAY MONON CENTER 1235 CENTRAL PARK DR. EAST 1235 CENTRAL PARK DR EAST CARMEL, IN 46032 CARMEL, IN 46032 INVOICE DATE CUSTOMER PO PAYMENT TERMS REFERENCE # CALLER 05/09/2017 11539 Net 30 days 8410051551 JEREMY KERR ITEM ID DESCRIPTION QTY UNIT PRICE EXT PRICE 84LO02R Labor-Project Manager - Non Preferred 12.00 145.00 1,740.00 84LO02R Labor-Project Manager - Non Preferred 2.00 145.00 290.00 84LO02R Labor-Project Manager - Non Preferred 1.00 145.00 145.00 84SERCHG SERVICE CHARGE 1.00 30.00 30.00 Notes: Sales Total 2,205.00 Tax Total 0.00 Net Amount 2,205.00 Remit to: Automated Logic Contracting Services Automated Logic-Indiana P.O. Box 403257 Atlanta,GA 30384-3257 AuTomATEDLOGIC SYSTEM SPECIALIST: David Miller ° MOW DATE OF SERVICE: 2/7/2017 A 117 N.High Street a Muncie,IN 47305 8(855)734-2521 di(630)852-9330 Owww.automatedlogic.com REASON FOR VISIT: Server Crashed/reload of WebCTRL needed. BILLTO CUSTOMER: Carmel Clay Parks SITE NAME: Monon Community Center ALC WORK ORDER* 8410057551 CALL TYPE: REPAIR CUSTOMER PO#/WO M 11539 s • s Ra.esOnsfrd Carmel Clay Parks&Recreation €rarufordia:carmelclayoarksro:n 317-843-3863 a a. s 1. 2. 3. 4. S. OESCRITITIONOFWORKPERFOR Carmel clay Monon center Feb 7&8, 2017 1.reload all VAV&FPB with DAT programing 2.RTU's need reloaded but we never changed any of these programs,not sure why I am getting the error message that they need downloaded,that would lead me to believe someone has changed the programing from the last time I did a backup on 2/11/15 a.This was on all the VAV RTU's,but this morning they are all reading okay. b.I did notice James made Econ changes from 10 to 0%which is fine,so it could be he hit download last night after I left. I was planning on looking over the program to see if I could figure it out what had changed. c.I know at one point Mike K.and lames R.had spoken about removing the air flow stations,they had had some issues with them failing,and maybe the program was changed/cleaned up from the temporary one I had in the originally for the TAB guy.Further discussion needs to be made ' a a R •'ai a i 71717717 COMPLETE � ae e a s.. o • a s 1 11.00 50.00 0.00 so.ao $0.00 $0.00 $0.00 t a a AuTOMATEDLOGIC SYSTEM SPECIALIST: Daivd Miller DATE OF SERVICE: 2/17/2017 A 117 N.High Street•Muncie,IN 47305 8(855)734-2521 dla(630)852-9330 Owww.automatedlogic.com REASON FOR VISIT: chiller down BILL TO CUSTOMER:I Carmel ClayParks SITENAME:1 Monon Community Center ALC WORK ORDER#: CALL TYPE:I PHONE SUPPORT CUSTOMER PO#/WO#: 11666 a a "James Carmel Clay Parks ranztordic?carme:IcEay.rarks.rorn 317-843-3863 a a. 1. 2. 3. 4. 5. James called with issues Chiller would not start.I checked multiple programs and overrode multiple times to get chiller to start.Chiller two was up to start but tripped out on a factory alarm,they reset but it would not re-start so I locked Chiller 1 on. waiting it did come on.then i unlocked all items i had locked to bring chiller on. at this time i was also searching the site trying to find the cause of why the chiller did not receive a RUN command from ALC. turns out there is a lock in the RUT/AHU's that prevent them from starting the chilled water valve programing that will then send the command to the chiller.it was set to less than 55 Begs and the chilled water was 85 degs. did some searching through trends and noticed the chilled water temp slowly rise over a day or two earlier in the week that brought the temp up over 55 degs. not sure exactly what happened at this point except if there are no 3 way valves and the chilled water pumps were started we could have been deadheading the pumps causing the heat to rise.i did change this set point to higher so we will not have this issue again until it can be confirmed if or what AHU programs parameters or programing had been changed since the last back up done by ALC in 2015.this is the backup i used last week to bring crashed server back on line. a° a ' 2/17/2017 David Miller 2.00 2/20/2017 David Miller 1.00 SELECT... a {3 a ®.. 3 a a t 3.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 # t f