HomeMy WebLinkAboutMorphey Construction/Eng/CO #3/-3,558/Small Structure Replacement – 15-09CITY OF CARMEL
TO: CONTRACT CHANGE ORDER NO.: 03
Morphey Construction DATE: 05/05/2017
1499 N. Sherman Dr. PROJECT NAME: Small Str. Replacement –15-09
Indianapolis, IN. 46201 CITY, REQ. NO.:
CITY PO NO.: 33414 4R6`
CITY PO DATE: 1%6/2016
I. You are directed to make the following changes in this Contract PN
The following original items and change order items have been reconciled in according
with actual item quantities used. This is the FINAL project change order and is accompanied
with a letter of recommendation for project acceptance by the Board of )Public Works.
SCHEDULED ADJUSTMENT
ITEM AMOUNT +) OR (-) DAYS
***SEE ATTCHED SPREAD SHEET FOR ITEM RECONCILIATION
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other:
Project Final Change Order Reconciling ALL Ouantitics – see ai:taehed.
The changes result in the following adjustment of Contract Price and C6ntract Time:
Contract Price prior to this Change Order $ 501.209.00
Contract Price will be increased/decreased by this Change Order $ (3.558.00)
New Contract Price including this Change Order $97.651.00
Contract Time Prior to this change Order 135 Days Completion Date
Net increased/decreased resulting from this Change Order 0 Days
Current Contract Time including this Change Order 135 Days . Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Approved:
Recommended Accepted:�'
HWC Engineering _ Morphey Construction
ENGIP�EER CONTRACTOR Brai d, r
151 N. Delaware Ste, 800 1499 N. Sherman Dr.
— *
Address
Indianapolis, IN. 46204
City/State/Zip
Bv:+ c3i_ t-tt
Phone: 3k? -13 y r -U5 to
Address
Indianapolis, IN. 46210
City/State/Zip
By:
Phone:
Member
Christina S. Pauley,
Date: 5/05/2017 Date: 5/05/2017 Date:
M O P Am..
P
08998 . 8 .
8888.8. 8
; y� _FMC _
ENGINEERING
7?^\
May 5, 2017
City of Carmel Department of Engineering
One Civic Square
Carmel, IN 46032
Confidence in the built environment.
1.35 N. Pennsylvania, Suite 2800
Indianapolis. Indiana 46204
www.hweengineering.com
ATTN: Mr. Chris Ogg - Assistant City Engineer
RE: Project 15-09 - City of Carmel Small Structure Replacement - Culvert #86 & #102
Final Acceptance
Chris,
HWC Engineering performed construction insppotion and contract administration of the aforementioned project
during the 2016 construction season. We have found this project to comply with the current specifications of
the Indiana Department of Transportation. We also recommend that the City of Carmel Board of Public Works
and the City Engineering Department accept this project as constructed.
Throughout the project duration, Inspections duties included observation of construction activities,, monitoring
of construction materials and quantities, and ensuring all were in compliance with project plans and
specifications. This included all daily paperwork, necessary drawings and calculations as derived from various
field measurements, ensuring proper certification and testing of materials as required, and reporting all
information to the City Engineering Department through progress meetings and requested reports.
All the materials used to build this project were approved via the Indiana Department of Transportation by test
result acceptance, certification, and or from a pre -approved list of materials, manufacturers, and :suppliers. The
work on this project also met or exceeded the City of Carmel Engineering Department standard construction
specifications.
The City is in receipt of all required as -built drawings, final construction record files, and material tickets.
HWC Engineering has appreciated this opportunity to serve the City of Carmel and the Board of Public Works
and looks forward to doing so again in the future.
Thanks,
C. Enginee 'n
David C. Lancet
Resident Project Representative
CC: Jacob Isenburg, PE
Jon Day, AC