Loading...
HomeMy WebLinkAboutWilliams Creek Consulting/Eng/Adl Serv #2/76,000/Kawachinago Japanese Garden and 3rd Avenue Drainage ImprovementsWilliams Creek Consulting, Inc. Engineering Department - 2017- Appropriation # 2016 Storm Water Bond Fund P.O. #100476Contract Not To Exceed $76,000.00 e ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement") entered into by' and between the City of Carmel and Williams Creek :Consulting, Inc. (the "Professional'), as City Contract. dated November 4, :2015 shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of -Work attached'hereto and incorporated herein as Exhibit W. The terms and conditions of the Agreement shall not otherwise: be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF; the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA. by and through -its Board of`Public Works and Safety By: (Ames Brainard; Presidia Officer iaate:4Burke, ry Aq M�rnbe7-17 _ / ,7 Date. / Lori S. Date: Christine Pauley .CI'erk-Tr sur r We: iSXw't, a. -M. S,Qvd,s..nv ; n��win�eae .r.nic.� n�;.n:�.attq Williams Creek.Consulting, Inc. a Authorized Signature Printed Name Title FID/TIN: Last Four of SSN if Sole Proprietor: Date: Project Plan and Scope of Services Kawachinagano Japanese Garden and 3rd Ave Drainage Improvements Carmel, Indiana Prepared for.- One Civic Square Carmel, Indiana 46032 Prepared by. WILLIAMS CREEK CONSULTING 619 North Pennsylvania Street Indianapolis, Indiana 46204 25 May 2017 'Av AMF- -NIM PROJECT DEFINITION Williams Creek Consulting, Inc. (Williams Creek) has prepared this Project Plan and Scope of Services to assist the City of Carmel, Department of Engineering (CLIENT) by providing services related to two projects directly associated with drainage improvements needed south of City Center Drive in the area of the Monon Trail corridor. Williams Creek will complete related analysis and design services following the three-phase approach described below. PHASE 1 will be completed concurrently with PHASE 2 and provide guidance assuring maximum functional benefit is incorporated into the concepts being developed. SCOPE OF SERVICES PHASE 1: 3rd Avenue Drainage Improvements Preliminary Engineering The previous study completed for the drainage south of City Center Drive along the Monon Trail included a recommendation for a portion of the stormwater runoff to be re-routed along 3rd Avenue to reconnect with the legal drain south of Carmel Drive. This analysis would help eliminate areas of standing water and the negative effect of flooding currently occurring in the area along 3rd Avenue adjacent to the Monon Trail corridor. The purpose of PHASE 1 would be to complete the investigation of the area and finalize the technical components (storm sewer sizing, route, depth, etc.) associated with this solution. Included in PHASE 1 are the following steps. • Detailed review of the sub -watersheds west of the Monon Trail north of Carmel Drive • Limited Topographic Survey Collection • Right of Way investigation • Utility investigation / preliminary coordination • Develop refined drainage analysis and review scenarios to determine most cost effective solution • Research property owners along rerouted stormwater trunkline • Develop a preliminary engineering stormwater pricing plan set - plan will include all improvements associated with the stormwater improvements o Cover Sheet o Plan View Sheets o Erosion Control o Storm Sewer Plans (with structures, sizes and depth) o Pavement repairs and improvements o Sidewalk repairs "DCH113IT • Coordinate with contractors as needed to develop preliminary cost estimate PHASE 1 Deliverable Materials Williams Creek Consulting, Inc 3rd Ave Drainage Improvements and Japanese Gardens Regional Detention Scope of Services • Preliminary Engineering Stormwater Plan Set • Opinion of Probable Cost for proposed improvements PHASE 2: Regional Detention Conceptualization In addition to the drainage improvements for the west portion of the watershed along 3rd Avenue, the installation of a regional' detention and retention system to provide effective stormwater management for the currently underserved and under detained areas east of the Monon Trail corridor. The proposed solution to develop a regional detention facility is to expand to the south the current Kawachinagano Japanese Gardens south of City Hall. The regional detention solution will likely require additional conveyance improvements in the legal drain running parallel to the Monon Trail. Building upon the previous study, as well as input received from CLIENT, Williams Creek will develop two additional (2) concepts for a stormwater park following the form of the current Kawachinagano Japanese Gardens and functioning as a regional detention facility. The storm park will provide hydraulic function and benefit while also serving as a public open space and provide a view corridor from the south of City Hall. Understanding the CLIENT's desire for consistency, the concepts will assure the design meets the functional intent while being respectful of the context of its location. As part of PHASE 2, Williams Creek will facilitate and attend up to two (2) presentation meetings with the CLIENT and other project stakeholders. If the CLIENT and/or stakeholders require Williams Creek to attend/present additional meetings in excess of the two (2) listed above, these additional meetings may be tracked and invoiced under PHASE 2 using a Time and Materials Fee Basis. PHASE 2 Deliverable Materials Professionally Rendered, Printed, & Mounted Concept Presentation Boards • Digital files (PDF) of Concept Presentation Boards • Rough Order of Magnitude Cost for Each Concept PHASE 3: Regional Detention Preliminary Engineering Following the selection of an approved concept plan from PHASE 2, Williams Creek will immediately proceed with Preliminary Engineering to refine this plan and the associated project details into an engineering pricing plan set. During PHASE 3, the following steps will be completed. • Plan refinement Meetings (2) to further review and coordination with stakeholders to determine the viability of legal drain improvements upstream and downstream of Carmel Drive • Limited topographic survey collection "EXHIBIT A Williams Creek Consulting, Inc 36-P6 3rd Ave Drainage Improvements and Japanese Gardens Regional Detention Scope of Services • Determine impacts on open ditch and surrounding properties in the area of Gradle Drive • Develop preliminary details for proposed improvements. • Utility investigation / preliminary coordination • Develop refined drainage analysis to determine most cost effective solution for the staging in of the pond(s) • Plan Set o Cover Sheet o Grading Plan o Preliminary Utility Design ■ Storm Sewer ■ Lighting o Landscaping Plan o Details • Develop a rendering of the site • Coordinate with contractors as needed to develop preliminary cost estimate. PHASE 3 Deliverable Materials • Preliminary Engineering Plan Set • Opinion of Probable Cost for proposed improvements "EXHiBrr L`(7p6 Williams Creek Consulting, Inc 3rd Ave Drainage Improvements and Japanese Gardens Regional Detention Scope of Services COMPENSATION PHASE No. Description Est. Fee Fee Basis 1 3rd Avenue Drainage Improvements Preliminary Engineering $27,900.00 Lump Sum 2 Regional Detention Conceptualization $11,300.00 Lump Sum 3 Regional Detention Preliminary Engineering $36,800.00 Lump Sum Williams Creek appreciates the opportunity to be of continued service to the City of Carmel. If you have any questions concerning the Project Plan and Scope of Services, please contact us. Best Regards, Williams Creek Consulting, Inc. Neil B. Myers Principal Williams Creek Consulting, Inc. Jim Rinehart, PE Director of Operations "aHlBlT Williams Creek Consulting, Inc 3rd Ave Drainage Improvements and Japanese Gardens Regional Detention Scope of Services Exhibit A Professional Labor Hourly Rate Principal $240.00 Associate Principal $180.00 Level V $140.00 Level IV $110.00 Level 111 $100.00 Reimbursable Items 1 1.05 times direct cost or per quote Materials 1 1.05 times direct cost or per quote Equipment Rental 1.05 times direct cost or per quote 'Please note. These rates are for the 2017 calendar vear and are subiect to chanoe. "EXHIBIT A- � c Williams Creek Consulting, Inc 3rd Ave Drainage Improvements and Japanese Gardens Regional Detention Scope of Services r City ®'j�' Car el INDIANA RETAIL TAX EXEMPT CERTIFICATE NO. 003120155 002 0 Page 1 of 1 PURCHASE ORDER NUMBER JL JL JL JL FEDERAL EXCISE TAX EXEMPT 100476 ONE CIVIC SQUARE 35-6000972 THIS NUMBER MUST APPEAR ON INVOICES, A/P CARMEL, INDIANA 46032-2584 THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. VOUCHER, DELIVERY MEMO, PACKING SLIPS, FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997 SHIPPING LABELS AND ANY CORRESPONDENCE PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. DESCRIPTION 5/25/2017 360137 Project 17 -SW -14; Contract Date 10.15.15 WILLIAMS CREEK CONSULTING City Engineering's Office VENDOR 619 N. PENNSYLVANIA ST. SHIP 1 Civic Square TO Carmel, IN 46032 - INDIANAPOLIS, IN 46204 - Kate Lustig PURCHASE ID BLANKET CONTRACT PAYMENT TERMS FREIGHT 15693 QUANTITY UNIT OF MEASURE DESCRIPTION UNIT PRICE EXTENSION Department: 2200 Fund. 0 2016 Storm Water Bond Account., 94-650.04 1 Each ASA 2 - Kawachinagano Japanese Gardens and 3rd Ave $76,000.00 $76,000.00 Drainage Improvements Sub Total $76,000.00 Send Invoice To: Jill Newport CrossRoad Engineers, P.C. 3417 Sherman Drive Beech Grove, IN 46107 G.O./storm Water Bonds PLEASE INVOICE IN DUPLICATE DEPARTMENT I ACCOUNT PROJECT PROJECTACCOUNT AMOUNT PAYMENT $76,000.00 SHIPPING INSTRUCTIONS ' AIP VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN 'SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN 'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. 'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL 'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945 AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY Jeremy Kashman TITLE Director CONTROL NO. 100476 CLERK -TREASURER Douglas Haney Corporation Counsel