Loading...
HomeMy WebLinkAboutRieth Riley Construction/Eng/ CO #1/69,419.74CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 1 Rieth-Miley, Inc. DATE: Mav 16, 2017 1.751 W. IaIinnesota St. PROJECT NAME: Rangeline/City Center Roundabout Indianapolis, IN 46221 CITY REQ. NO.: 16 -ENG -50 CITY PO NO.: 100273: 2016 COIT Bond CITY" PO DATE: March 15, 2017 RO�� I• You are directed to make the following changes in this Contract: Contract extension for delayed start due to Carmel Marathon. New Subs3tanti Completion shall be July 15, 2017 and the new Final Completion will be July M. 2017. Additionally, see Attachment A for a sun of the contract design changes to date. SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS Contract Extension +14 II. The following referenced Documents further describe the changes outlined in Paragraph I; and are to be considered a part of this Change Order: R.F.P.: _ /A Vt;.D_C: No.: 1�T/A. Other: _._____ The changes result in the `following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1516:487.52 Contract Price will be increased/decreased by this Change Order $ 69.419.74 New Contract Price including this Change Order 1:585..907.26 Contract Time Prior to this Change Order Julv 1.2017 Open to Traffic Net increased/decreased resulting from this Change Order 1_ 4 _Days Current Contract Time including this Change Order July I5, 2017 Open to Traffic This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Recommended Approved_ Accepted: A American Structurepoint Inc ENGINEER 7260 Shadeland Station Address Indianapolis; IN 46256 City/State/Zip ,- Phone: 317-547-5580 bate:_ r i Sl Rieth-Riley; Inc. CONTRACTOR 1751. W. Minnesota St.- Address t: Address Phone: '317-634-5561 Date: S/e/7 VK shm y n pristine S. auley, Clerk - Treasurer Date: Attachement A Note: A * equals a new contract line item Range Line and City Center Roundabout Item No. Description Unit Unit Price Quantity Amount NMA Intermediate, Type 20 C, 19.0mm TON $ 73.75 -128.53 $ (9,479.09 HMA Base, Type C, 21 25.0mm TON $ 67.70 -100.81 $ (6,824.84 HMA Intermediate, OG, 22 Type C,19.amm TOn $ 66.29 -38.77 $ (2,570.06 27 Sidewalk, Concrete SYS $ 46.55 83 $ 3,863.65 34 Concrete Pavers SYS $ 215.65 121.44 $ 26,188.54 37 Modular Block Wall SFr $ 12.69 -718 $ (9,111.42; Modular Block Wall 38 Erection SFr $ 19.88 -718 $ (14,273.84) 40 Handrail LFT $ 176.00 =173 $ (30,448.00) 56 Inlet, BIS -EA $ 3,201.44 7 $ 22,4'10.08 101 Field Office MOS $ 2,300.00 -4 $ (9,200.00) Decorative Sidewalk, 105 Concrete SYS $ 96:26 -83 S (7,989.58) Water Main Pavement 106* Section Credit LS $ (11500.00) 1 Additional. Survey Efforts 107* for SW Corner LS $ 1,565.00 1 $ Pedestrian Clay Paver 1,565.00 108' Inlay P SYS $ 215.65 250 $ 53,912.50 Concrete Pedestrian 109* Crossings.SYS $ 97.20 544 $ 52,876.80 Tota! $ 69,419.74 Note: A * equals a new contract line item