Loading...
Temple & Temple/Eng/Change Order #1, Final/65,957.27/Small Structure & Culvert Lining ProjectsCITY OF CARMEL TO: Temple & Temple CONTRACT CHANGE ORDER NO 1, Final 230 N. Bond Street DATE: 616/2017 Scottsburg, IN 47170 PROJECT NAME: Smalh.Structure & Culvert CITY REQ. NO.: Lining - 6, 30, 33, 49, 98, 104 CITY PO NO.: 34324 CITY PO DATE: 1102016 gttpp� I. You are directed to make the following changes in this Contract: DCS Add additional items items due to rnodifications'in the field and requests from Carmel Utility Departments. SCHEDULED ADJUSTMENT ITEM AMOUNT OR (-) DAYS * See detail of items and summary of chaneed costs in attached exhibit A &--Table ORDER ITEMS 11. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R:F.P.; 1'a W.D.C. NO.: nia . Other:.By Request from the City of Carmel per Progress meeting minutes and proposals included herein The.changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this.Change Order $771.737.98 Contract Price will be increased/decreased by this Change Order $65,957.27 New Contract Price including this Change Order $837.695:25 Contract Time prior to this Change Order 173 Days 4/24!2017 Completion:Date Net increased resulting'froin this Change Order 0 Days Current Contract Time including this Change Order 173 4/24/2017 Completion` Date 173 days is completion date of April 24th 2017 for Landscape and Final Completion. This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at anytime resulting from the performance of the changed work. The Above Changes Are Recommended CROSSROAD ENGINEERS ENGINEER 3417 Sherman Drive Address Beech Grove. IN 46107 City/State/Zip BY: Phone: 317-780-1555 Date: "Z201-7 The Above Changes Are Accepted T&T Pipe Renovation CONTRACTOR T&T;Pipe Renovation Address ,Approved JamesBl, inard�Mayor S. .Treasurer CITY OF CARMEL Small Structure & Culvert Lining - 8, 30, 33, 49, 98, 104 FINAL CHANGE ORDER #1 TABLE Item Number DesaipUon Unit Unit Price Original QuantityAmount Original Final Quant' Final Amount Over/Under 6 Pipe Lining, KDPE, Culvert 49 LFT $1,091.73 69 $75,329,37 71 $77,512.83 $2,183.46 7 Geotextiles SYS $14.37 68 $977.16 34 5488.58 (S4aa.58) 8 ArmorFlex Class 85 Open Cell Block- SYS $145.00. 68 $9,860.00 34. $4,930.00 (54.930.00; 9 Temporary Mulching SYS $3.93 211 $829.23 0 $0.00 '$329.23) 10 Topsoil (Undistributed) CYS $102.38 35 $3,583.30 2 $204.76 ($3.,'.78:541 14 TemporaryPumparound LS $2,695.07 1 $2,695.07 0 $0.00 (.2.6135,07) 19 Temporary Mulching SYS $10.56 74 $781.44 0 $0.00 ($7.81.44; 20 Topsoil(Undistributed) CYS $119.30 12 $1,431.60 0 $0.00 1.5;..3!.60) 28 RipRap Class 1 SYS $61.92 50 53.096.00 40.14 $2,485.47 (5810.53) 29 Temporary Mulching SYS $5.50 146 $803.00 0 $0.00 ;5803,00) 30 Topsoil (Undistributed) CYS $105.84 24 $2,540.16 3 5317.52 ($2,222.84) 36 Pipe lining, HDPE, Culvert 8 LFT $875.95 107 $93,726.65 110 $96,354.50 $2,627.85 37 Geotextiles SYS $16.89 38 $841.82 38.9 $657.02 $15.20 38 ArmorFlex Class 85 Open Cell Block SYS $160.48 38 $6,098.24 38.9 56,242.67 5144.43 39 Temporary Mulching SYS '$2.39 579 $1,383.81 0 $0,00 (511,363 81) 40 Topsoil (Undistributed) CYS $105.43 97 $10,226.71 0 $0.00 (S [0,22F.71) 47 Pipe Lining HDPE 24- Blind Tee LFT $212.31 15 $3,184.65 12 $2,547.72 ;*636.93) 50 Geotextiles SYS $21.49 44 $945.56 38 $816.62 !$128.941 51 ArmorFlex Class 85 Open Cell Block SYS $141.55 44 $6,228.20 38 55,378.90 (S849.3R) 52 Temporary Mulching SYS $8.27 96 $793.92 0 $0.00 (x'793.92; 53 Topsoil (Undistributed) CYS 5126.03 16 $2,016.48 0 $0.00 (52.7lt6,4e; 57 Temporary•Pumparound LS $2,695.07 1 $2,895.07 0 $0.00 ($2.695.07; 59 Pipe Lining HDPE Culveit 104 LFT $315.79 158 $49,894.82 152 $48,000.08 ($1.894.74) 70 FlowableFill CYS S191.83 12 $2,301.96 10.63 $2,039.15 ($202.81) 71 12"Concrete Cap SYS $123.03 16 $1,968.48 41.22 $5,071.30 $3,102.82 72 HMA Surface9.5mm TON $1,167.54 2 $2,335.08 0 $0.00 ;32,335.08) 73 Line Thermoplastic Solid Yellow LFT $117.84 10 $1,178.40 0 $0,00 (*1,178.40) 74 Line Thermoplastic Solid White LFT $117.84 10 $1,178.40 0 $0.00 ($1.176.40) 75 Temporary Mulching SYS $14.55 49 $712.95 0 $0.00 (5112,95) 76 Topsoil (Undistributed) CYS $146.22 8 $1,169.76 2 $292.44 1$577,32) 77 Clean 42"Pipe at St_ Andrews Cir: LS $2,300.00 0 $0.00 1 $2,300.00 $2,300.00 CITY OF CARIMEL Small Structure & Culvert Lining - 8, 30, 33, 49, 98, 104 FINAL CHANGE ORDER # I TABLE Item Number D95oVbon Unit Unit.pdce Original Quantity Original Amount Final Quantity Final Amount Over/Under 78 Line St Andrews Cir. With 36".HDPE sn $285.00 0 $0.00 345 $98,325.00 $96.325.00 79 Debris Guard for (Carmel Drive) EA $1,300.00 0 50.00 1 $1.300.00 $1,300.00 80 Break Concrete at College Ave. Culyert 0 $0.00 1 s1,300.00 $1,300:00 - Removal LS I 51.300.001 ORIGINAL CONTRACT PRICE $771,737.96 FINAL CHANGE ORDER #1 $65,957.27 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS $637,695.25 CITY OF CARMEL Small Structure & Culvert Lining - 8, 30, 33, 49, 98, 104 Exhibit A You have been directed to make the following changes in this Contract: ITEM NO. DESCRIPTION REASON FOR CHANGE 6 Pipe Lining, HDPE, Culvert 49 Culvert was -2 feet longer than the plans represented 7 Geotextiles Due to contours in the field the full amount was not required 8 Armofflex Class. 85 Open Cell Block Due to contours in the field the full amount was not required 9 Temporary Mulching Due to winter weather item was not needed 10 Topsoil (Undistributed) Was able to use existing topsoil from site lel Temporary Pumparound Was able to avoid pumparound 19 Temporary Mulching Due to winter weather item was not needed 20 Topsoil (Undistributed) Was able to use existing topsoil, from site 28 RipRap Class 1 Due to contours in the field the full amount was not required 29 Temporary Mulching Due to winter weather item was not needed 30 Topsoil (Undistributed) Was able to use a portion of topsoil at site 36 Pipe. Lining;:HDPE; Cu. Wert 8 Culvert was 3 feet longer than the plans represented 37 Geotextiles Due to contours in the field the full amount vas not required M ArmorFlex Class e5.Open Cell Block Due to contours in the field the iii1l amoturt was not required 39 Temporary Mulching Due to winter weather item was not needed 40 Topsoil _(Undistributed) Was able to use existing:fopsoit:from site 47 Pipe Lining HDPE 24" Blind Tee Culvert was 3 feet shorter than the plans resp_resented 50 Geotextiles Due. to contours, in the field the full amount was not required 51 AfmorFlex Class 85 Open Cell Block Due to contours in the field the full amount was not -_required ,52 Temporary Mulching Due to winter weather.item was not needed 53 Topsoil (Undistributed) Was able to use existing topsoil from site 57 Temporary Pumparound Was able to avoid pumparound 59 Pipe Lining HDPE Culvert 104 Culvert was 6 feet longer than the plans represented 70 Fiowable Fill Needed less than expected 71 12" Concrete Cap Due to field changes, weather, and material delivery issues, this item was increased to take place of the 11MA Surface 9.5 mm with approval from the City. CITY OF CARMEL Small Structure & Culvert Lining - 8,3% 33, 49, 98,104 Exhibit A You have been directed to make the following changes in this Contract: ITEM NO. DESCRIPTION REASON FOR CHANGE 72 HMA Surface 9.5mm Due to Feld changes, weather, and material delivery issues, this item was removed with approval from the City. 73 Line Thermoplastic Solid Yellow Was not used due to improper application when concrete cap replaced HMA Surface 9.5 mm 74 Line Thermoplastic Solid White Was not used due to improper application when concrete cap replaced HMA Surface 9.5 trim 75 Temporary Mulching Due to «inter weather item was not needed 76 Topsoil (Undistributed) Was able to use existing topsoil from site 77 Clean 42" Pipe at SL Andrews Cir. Added to contract pet City of Carmel Engineering request 18 Line St. Andrews Cir. With 36" HDPE Added to contract per City of Carmel Engineering Eguest 79 Debris Guard for (Carmel Drive) Added to contract per City of Carmel Engineering request 80 Break Concrete at College Ave. Culvert Removal Added to. contract due to large concrete casings around culvert needing to be removed. This was not in the original scopeof work