HomeMy WebLinkAbout03110125.3REFECTED CEILING PLAN
SCALE: 1/8" = V-0"
NORTH
GENERAL CEILING NOTES:
A. ALL WALLS GO TO BOTTOM OF CEILING UNLESS OTHERWISE NOTED.
B. EACH ROOM TO HAVE INDIVIDUAL SWITCH LOCATED ON WALL Al DOORWAY TO
ROOM, TYPICAL UNLESS NOTED OTHERWISE. IN LOCATIONS OF 2 OR MORE SWITCHES
IN CLOSE PROXIMITY ARE TO BE CONSOLODATED TO A GANG PLATE CONDITION.
C. CONTRACTOR TO VERIFY EXISTING CONDITIONS TO LAYOUT AND REPORT ANY
DESCREPANCIES TO ARCHITECT AND/OR DESIGNER BEFORE PROCEEDING WITH
CONSTRUCTION.
D. MECHANICAL AND ELECTRICAL IS DESIGN -BUILD. DESIGN -BUILD CONTRACTOR
TO VERIFY EXISTING CONDITIONS AND COORDINATE DESIGN OF RELOCATED AND
NEW DIFFUSERS, SPRINKLER HEADS, FIRE PROTECTION DEVICES, EXIT LIGHTS,
EMERGENCY NIGHT LIGHTS AND THERMOSTATS. DESIGN -BUILD CONTRACTOR TO
COORDINATE HIS WORK WITH THE LIGHTING PLAN. ALL QUESTIONS ARE TO BE
BROUGHT TO THE ATTENTION OF THE DESIGNER BEFORE PROCEEDING. REFER
TO MECHANICAL DRAWINGS FOR RELOCATION OF THERMOSTATS. CONTRACTOR
TO VERIFY WITH TENANT AND FURNITURE SUPPLIER THERMOSTAT LOCATIONS
FOR PANEL LOCATION CONFLICTS BEFORE PROCEEDING.
E. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR DESIGN/BUILD OF ALL
SAFETY SYSTEMS. CONTRACTOR IS TO VERIFY QUANTITY AND PLACEMENT
OF INDICATED SAFETY DEVICES (EXIT SIGNS, ALARMS, ETC.) AND VERIFY
CONFORMANCE WITH LOCAL AND STATE CODES. LIFESAFETY CONTRACTOR
IS RESPONSIBLE FOR SUBMITTING NECESSARY DRAWINGS FOR REVIEW AND
OBTAINING PERMITS, LIFESAFETY CONTRACTOR IS RESPONSIBLE FOR
SUBMITTING DRAWINGS TO CSO INTERIORS FOR REVIEW AND COORDINATION
OF LOCATION OF DEVICES. CSO INTERIORS REVIEW IS FOR ASTHETIC
REVIEW ONLY.
F. REPLACE ANY DAMAGED OR MISSING CEILING TILES. NEW TILES TO MATCH EXISTING.
GENERAL CONTRACTOR TO VERIFY EXISTING GRID LAYOUT AND CONDITION.
G. PATCH, REPAIR, AND/OR REPLACE CEILING GRID SYSTEM WHERE WALLS,
LIGHT FIXTURES, OR PARTITIONS HAVE BEEN REMOVED.
CEILING GRID SYSTEM TO BE RESTORED TO MATCH EXISTING ADJACENT
CONDITION AS TO NOT SHOW LINE OF DEMOLITION.
H. RE -USE EXISTING LIGHT FIXTURES WHERE SHOWN. STORE SALVAGED LIGHT
FIXTURES DURING THE CONSTRUCTION PHASE. STORAGE OF SALVAGED
FIXTURES TO BE COORDINATED WITH OWNER. FIXTURES TO BE CLEANED,
RELAMPED, AND INSTALLED UPON COMPLETION OF CONSTRUCTION.
I. CEILING HEIGHT IS 9'-0" A.F.F. UNLESS OTHERWISE NOTED.
REFLECTED CEILING LEGEND:
D EXISTING 2' X 4' FLUORESCENT FIXTURE TO BE REMOVED
EXISTING 2' X 4' FLUORESCENT FIXTURE TO REMAIN
NEW OR RELOCATED 2' X 4' FLUORESCENT FIXTURE, TO MATCH
EXISTING
EXISTING DOWNLIGHT TO REMAIN
EXISTING CEILING MTD. EXIT LIGHT TO BE REMOVED
EXISTING CEILING MTD. EXIT LIGHT W/ DIRECTION INDICATION
DUAL -LITE TO REMAIN
f® RELOCATED CEILING MTD. EXIT LIGHT W/ DIRECTION INDICATION
EXISTING 2 X 2 LAY -IN GRID SUSPENSION SYSTEM
NIGHTLIGHT LOCATION
$ TWO WAY SWITCH
Kalif CORPORATION
600 East 96th Street
Suite 100
Indianapolis, IN 46240
Phone: 317 808-6000
Fax: 317 808-6797
611
CSO
Architecture
Engineering
Interiors
Landscape Architecture
Land Surveying
Six Parkwood Office
600 East 96th Street, Suite 550
Indianapolis, Indiana 46240
317.848.7800
FAX 317.574.0957 ®COPY69 2oC
0
co
O
�
r
u
P
,r
> m
m^
mK
K
e
o
a Q
3
Z
=
Z
0
Z
0Q
a
M
Z Q
U
CO) -
0
hoz
Z
OLn
:j
t:V)
at
U
W
~o
V
Z D n-
O u.)z
W
W
<
J o
V
W
Q
j
oc
_
'L
W
U
5+ f40. 032035
i, STATE OF
I A ` a
Drawing Number:
3A202
Of Sheets
Duke Job Number:
VE Job Number:
23127C