HomeMy WebLinkAbout03090100.3�Ia
REMOVE EXISTING SHINGLES, PLYWOOD ROOF DECK AND ROOF FRAMING. REMOVE
BURNED DRYWALL AND INSULATION ON BOTTOM OF ROOF FRAMING, PROVIDE NEW
ROOF TRUSSES 0 2'-0' O.C., NEW 5/a' ROOF DECK, NEW SHINGLES ON 15* FELT.
PROVIDE NEW INSULATION AND DRYWALL ON BOTTOM OF ROOF FRAMING IN
ROOMS. REMOVE AND REPLACE BURNED SOFFIT AND GUTTER TO MATCH EXISTING.
REMOVE AND REPLACE REMOVE AND REPLACE ATTIC INSULATION.
ROOF TRUSS. REMOVE AND SEAL STRUCTURE.
REPLACE BURNED SOFFIT
AND GUTTER TO MATCH EXISTING
- - — DRAWING NOTES
REMOVE AND REPLACE ATTIC INSULATION.
SEAL STRUCTURE. PROVIDE NEW SHINGLES.
;►p��t1 REMOVE AND INSTALL 576
NEW BRICK
EAST ELEVATION
SCALE : W = P-0"
REMOVE AND REPLACE
ROOF TRUSS. REMOVE AND
REPLACE BURNED SOFFIT
AND GUTTER TO MATCH EXISTING.
REMOVE EXISTING SHINGLES, PLYWOOD ROOF DECK AND FRAMING. REMOVE BURNED DRYWALL
AND INSULATION ON BOTTOM OF ROOF FRAMING. PROVIDE NEW ROOF TRUSSES 6 2'-0' O.C., NEW
5/a° ROOF DECK, NEW SHINGLES ON 15'* FELT. PROVIDE NEW INSULATION AND DRYWALL ON BOTTOM
OF ROOF FRAMING IN ROOMS. REMOVE AND REPLACE BURNED SOFFIT AND GUTTER TO MATCH
EXISTING.
REMOVE EXISTING SHINGLES, PLYWOOD ROOF DECK AND ROOF
FRAMING. REMOVE BURNED DRYWALL AND INSULATION ON
BOTTOM OF ROOF FRAMING. PROVIDE NEW ROOF TRUSSES
2'-0' O.G., NEW 5/a' ROOF DECK, NEW SHINGLES ON 151* FELT.
PROVIDE NEW INSULATION AND DRYWALL ON BOTTOM OF ROOF
FRAMING IN ROOMS. REMOVE AND REPLACE BURNED
SOFFIT AND GUTTER TO MATCH EXISTING.
EE -Z
F
SOUTH ELEVATION
SCALE : W = 1'-0"
— — — — — — — —Rf— — — — — — — —
R OVE EXI;7N( BCK—
AND REPLACE W/ BRICK FROM
EAST ELEVATION
WEST ELEVATION
SCALE • W = P-0"
REMOVE AND REPLACE
AT'IC INSULATION.
SEAL STRUCTURE.
PF-OVIDE NEW SHINGLES.
�00
-
REMOVE EXISTING BRICK
AND REPLACE W/ BRICK FROM
EAST ELEVATION
SOUTH ELEVATION
SCALE : W = 1'-0"
— — — — — — — —Rf— — — — — — — —
R OVE EXI;7N( BCK—
AND REPLACE W/ BRICK FROM
EAST ELEVATION
WEST ELEVATION
SCALE • W = P-0"
REMOVE AND REPLACE
AT'IC INSULATION.
SEAL STRUCTURE.
PF-OVIDE NEW SHINGLES.
NORTH ELEVATION
SCALE • im = r -T
� 1 3
REMOVE AND REPLACE DAMAGED DOORS AND
WINDOWS TO MATCH ORIGINAL.
0 REMOVE AND REPLACE DAMAGED
WOOD DECK AND RAILING TO MATCH
ORIGINAL.
31 REMOVE AND REPLACE EXTERIOR
SIDING. PAINT TO MATCH ORIGINAL.
$ �.,• A44.dC,:.l. , frG.
Ay*tects / Engineers
5105 Madison Avenue
Indianapolis, IN 46227
(317) 783-2343 (317) 784-5100
GISTEq�
No.
3778
STATE OF l
ROBERT E. BEAMAN # 3778
PROJECT NO.: 0333
DRAWN BY: ELB
CHK. BY:
DATE: AUGUST 25, 2003
REVISIONS:
BUIIDDdG ELEVATIONS
A- 2
�00
-
NORTH ELEVATION
SCALE • im = r -T
� 1 3
REMOVE AND REPLACE DAMAGED DOORS AND
WINDOWS TO MATCH ORIGINAL.
0 REMOVE AND REPLACE DAMAGED
WOOD DECK AND RAILING TO MATCH
ORIGINAL.
31 REMOVE AND REPLACE EXTERIOR
SIDING. PAINT TO MATCH ORIGINAL.
$ �.,• A44.dC,:.l. , frG.
Ay*tects / Engineers
5105 Madison Avenue
Indianapolis, IN 46227
(317) 783-2343 (317) 784-5100
GISTEq�
No.
3778
STATE OF l
ROBERT E. BEAMAN # 3778
PROJECT NO.: 0333
DRAWN BY: ELB
CHK. BY:
DATE: AUGUST 25, 2003
REVISIONS:
BUIIDDdG ELEVATIONS
A- 2