HomeMy WebLinkAbout067-068.6GENERAL STAPLE RECOMMENDATIONS
,uu
275
250
uj
225
Z 200
= 175
150
J 125
W 10
0 75
V) 50
25
B`
- SILT FENCE BOX
0
- GRAVELBAG CURB INLET PROTECTION
-
F
A
- TEMPORARY SEEDING
B
B
1 STAPLE PER SO. YD.
4:1 3:1 2:1 1:1 CHANNEL
SLOPE GRADIENT LINING
7, 4
ADDITIONAL STAPLES AS REQUIRED
e'
1_5'
4'
4 X
XX
c
x
STAPLE PFR SO. YD.
®t
® X
® B
CHANNEL LININGS UTILIZE STAPLE PATTERN 1 1/2 STAPLE PER SO. YD.
WITH ADDITIONAL STAPLES ON SIDE SLOPES.
NOTES: STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION CONTROL BLANKETS.
STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL.
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS
IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED.
CHANNEL LININGS REQUIRED A 2.0' MINIMUM OVERLAP AT LONGITUDINAL JOINTS.
SIDESLOPES SHALL REQUIRE A 6" MINIMUM OVERLAP, WHERE OVERLAPS OCCUR,
THE UPSTREAM BLANKET SHALL OVERLAP THE DOWNSTREAM.
IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INSTALLED
FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED BY THAT PRODUCTS COMPANY.
EROSION CONTROL BLANKET STAPLE PATTERN
(NO SCALE)
STABILIZATION
PRACTICE: JAN. FEB. MAR. APR. MAY JUNEJULY AUG. SEPT.00T. NOV. DEC.
PERMANENT A
SEEDING C°
DORMANT B—�
SEEDING
TEMPORARY C_ Deo
SEEDING E
F
SODDING
D
MULCHING G
A = KENTUCKY BLUEGRASS 40 LBS/ACRE; CREEPING RED FESCUE 40 LBS/ACRE;
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS/ACRE.
B = KENTUCKY BLUEGRASS 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS/ACRE:
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS/ACRE.
C = SPRING OATS 3 BUSHEL/ACRE.
D = WHEAT OR RYE 2 BUSHEL/ACRE.
E = ANNUAL RYEGRASS 40 LBS/ACRE. (1 LB/1000 SQ. FT.)
F = SOD
G = STRAW MULCH 2 TONS/ACRE.
*/I/` IRRIGATION NEEDED DURING JUNE, JULY, AND/OR SEPTEMBER,
's IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.
SEASONAL SOIL PROTECTION CHART
I= If3�—IIII�IIII=1''
Illliil�_III�I�I�IIII_
DRAINAGE SWALE SECTION
(NO SCALE)
EROSION CONTROL:
A TEMPORARY SEEDING MIXTURE IN THE AREAS WHERE STRIPPING
OR FILL HAVE BEEN GRADED SHALL BE SEEDED FOR SILT EROSION
PROTECTION. AFTER GRADING, ALL CONSTRUCTION AREAS ARE TO BE
SEEDED AS FOLLOWS:
A. SWALE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION
LIMITS WITH 5#/ACRE "REDTOP GRASS". 20#/ACRE "RYE
GRASS", 20#/ACRE "BLUEGRASS", 25#/ACRE 'FESCUE" AND
600#/ACRE 12-12-12 FERTILIZER.
B. CUT/FILL SEEDING (ALONG PAVED AREAS): SEED AND FERTILIZE
WITH 25#/ACRE "FESCUE", 20#/ACRE -RYE GRASS", 15#/ACRE
'BLUEGRASS" AND 600#/ACRE 12-12-12 FERTILIZER.
C. SEEDED AREAS SHALL HAVE A SUITABLE MULCH APPLIED FOR
EROSION AND SILT CONTROL. MULCH MAY BE STRAW, SHREDDED
HARDWOOD OR EROSION CONTROL MAT.
D. DEVELOPERS OPTION: CONSTRUCTION AREAS REQUIRING EROSION
CONTROL MAY BE HYDROSEEDED IN ACCORDANCE WITH ABOVE SEED
AND FERTILIZER SPECIFICATIONS.
(NO SCALE)
8 7 I 6
1V
_ � 1X X X x x x
�y
� 00.00y
OWNS= v
?-
A. L . i
6' BRD. FEN.
42' tt
POST
2"X2" WOOD OR
1.33 LBS/FOOT STEE,
5MAX. SPACING
WIRE FENCE —�
14 GAGE (MIN) -6" MESH
REO'D. IN SWALES OR
AREAS OF CONCENTRATED
FLOW
NONWOVEN FILTER
FABRIC - SECURE TO
POSTS WITH 2" LATH
4"X4" TRENCH TO
BE BACKFILLED
AND COMPACTED
UPSLOPE
C
� c
CV
to
DOWN-
SLOPE
- II
12 SQ. YDS. 9 SQ. YDS.
RIP -RAP FOR RIP RAP —
OUTLET PROTECTION
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT.
2. IF FABRIC 15 TORN OR DETERIORATED. REPLACE SECTION IMMEDIATELY.
3, REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF
THE FENCE OR IS CAUSING FABRIC TO BULGE,
4, TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT,
BRING DISTURBED AREA TO GRADE AND STABILIZE IT.
SILT FENCE SECTION
(NO SCALE)
C/L SWALE
1/3� 1/3 1/3 I 1 STRAW BA
.00
PRWWrr LIECTRK:,
TELEPNCN E a CABLE 7�r.
r
'1-3'-#4 REBAR STAKE
MAINTENANCE:
1. INSPECT STRAW BALE DAMS WEEKLY AND AFTER EACH STORM EVENT.
2. REMOVE ANY SEDIMENT DEPOSITS PROMPTLY TAKING CARE NOT TO
UNDERMINE ENTRENCHED BALES.
3. INSPECT WEEKLY FOR DETERIORATION OR DAMAGE BY CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
4. AFTER DRAINAGE AREA HAS BEEN STABILIZED, REMOVE BALES AND
SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT.
STRAW BALE PLACEMENT #1
FOR EROSION CONTROL
(NV SCALE
s
L \
1 ) L
� R
UNOF,
GRAVELBAG CURB INLET PROTECTION
(FOR INLETS THAT ARE IN LOW POINTS) (NO SCALE)
NOTE:
GRAVEL BAGS ARE HALF FULL WITH ROCK LARGER THAN THE INLET GRATE
AND PACKED CLOSE TOGETHER TO ELIMINATE GAPS.
IF BAG DETERIORATES OR IS DAMAGED, REBAG OLD BAG
WITH CONTENTS INTO A NEW BAG.
M.
7
Al
RIP -RAP ON
4 3
Q '4
0 3�
CONSTRUCTION ENTRANCE
12 SQ. YDS. RIP -RAP 140 SQ. YDS. RIP-RAP-sz - mk�> �.
_ V FOR OUTLET PROTECTION FOR OUTLET PROTECTION TEIWN No nur, rnm.r D
ELEVATION: 811-10 I�tf
VWER LK TO BLDG.
M
NN
T +— GRCWJiO PARK
F `
\'J �� E' ';RI( CHURCH $ICN R/W uM,
CNJACh SIGN
Al!
r
s g
} Y,
" tf �- �
i K" feyy E
CYPJE_ k a'—
art X_ ,- ,. Ln i
�J C
I
IIt I j
Dip
kREA
�T pA
W II
ZI
Y_,
`r r
._' v V I Q !
IBM /1 ClR S0. c.1
ON LGT. 1165E'"� Q v
ELEV. = 808.79 n w
a z
a 'W
x
A- p
ca.� l•, If a �� m
W
W #
i
\ / 4
112' arF'
E r
SEE PLANS
1 �
I I
RIP -RAP ON
FILTER FABRIC 12" (MIN)
OUTLET EROSION CONTROL
F
SOILS MAP
0
nnM ���� I M
B Mm�
C2 Q
SOILS TYPE LEGEND
Br BROOKSTON SILTY CLAY LOAM
CrA CROSBY SILT LOAM, 0 TO 2 % SLOPES
CsB2 CROSBY -MIAMI SILT LOAMS, 2 TO 4 % SLOPES, ERODED
MmB2 MIAMI SILT LOAM, 2 TO 6 % SLOPES, ERODED
5 I 4
EROSION CONTROL LEGEND
®
- SILT FENCE BOX
0
- GRAVELBAG CURB INLET PROTECTION
- RIP -RAP
V
- TEMPORARY SEEDING
USE PLANTING CHART
- EROSION CONTROL BLANKET
w .�
USE STAPLE PATTERN
N.A.G. S75 IN SWALE
Z
S150 ON LAKE SLOPES
®
- CONSTRUCTION ENTRANCE
(12" OF #2 STONE ON FILTER FABRIC)
0
�
- STRAW BALE DAM (SEE DETAIL)
—SF-
- SILT FENCE
—
- SWALE
C4 A v)
3 w
w
n
co
t
�
tE�1,
T
z
xw
♦ 1 �
� \��r
aa�5
„�
W
1
�
A��II♦�A� ��n`��,�III
Z
w
z
SOILS TYPE LEGEND
Br BROOKSTON SILTY CLAY LOAM
CrA CROSBY SILT LOAM, 0 TO 2 % SLOPES
CsB2 CROSBY -MIAMI SILT LOAMS, 2 TO 4 % SLOPES, ERODED
MmB2 MIAMI SILT LOAM, 2 TO 6 % SLOPES, ERODED
5 I 4
EROSION CONTROL LEGEND
®
- SILT FENCE BOX
0
- GRAVELBAG CURB INLET PROTECTION
- RIP -RAP
V
- TEMPORARY SEEDING
USE PLANTING CHART
- EROSION CONTROL BLANKET
w .�
USE STAPLE PATTERN
N.A.G. S75 IN SWALE
Z
S150 ON LAKE SLOPES
®
- CONSTRUCTION ENTRANCE
(12" OF #2 STONE ON FILTER FABRIC)
0
�
- STRAW BALE DAM (SEE DETAIL)
—SF-
- SILT FENCE
—
- SWALE
SCALE: 1 " = 50'
0 25 50 100
EROSION CONTROL SPECIFICATIONS:
THIS
THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND
ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY
OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS
TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY_ THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
TEMPORARY SEEDING IS TO BE APPLIED TO ANY GRADED AREA
THAT WILL REMAIN UNALTERED FOR AN EXTENDED PERIOD OF
TIME.
PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA
THEY ARE INTENDED TO SERVICE.
ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE
PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS.
IF GRADING OCCURS DURING THE MONTHS OF DECEMBER,
JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL
BE USED.
DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING
UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED.
THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND/OR OWNER.
IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S
RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE
CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO
ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN
STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5,
CONSTRUCTION ACTIVITY STORMWATER RUNOFF CONTROL). IT
SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S
RESPONSIBIUTY TO OBTAIN ANY APPROVALS REQUIRED FROM
THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF
INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY
CONSTRUCTION ACTIVITY..
FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
Call 1-800-382-5544
2 WORKING DAYS
BEFORE YOU DIG.
"IT'S THE LAW"
INDIANA UNDERGROUND PROTECTON SLRvICE, INC.
-WARNING-
THIS PLAN TO BE USED FOR
EROSION CONTROL PURPOSES ONLY.
FOR ALL OTHER INFORMATION
SEE DEVELOPMENT PLAN,
CAUTION!!
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, INLETS,
VALVES, AND MARKS MADE UPON THE GROUND BY OTHER) AND
ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER
EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND
EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID
EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY
THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION
PLEASE CALL "HOLEY MOLEY"
1-800-382-5544
TOLL FREE
V
4 t
JPS aC*
QQ ��
�O
ALLAN H. WEIHE P -E. 8827
V
co
W
Z
e
q
W
V
N o
CU �
15
O
4.
e
n q
o
w Ww
�2
w �
o
A� O '� 4
SHEET NO.
C4
■
Uj
a
U)
E-
V
w .�
Z
a
�
oz
W
C4 A v)
3 w
w
n
co
xwaa
G]
z
xw
ca
aa�5
W
W
Z
w
z
z
In
I
z
Zao
W
> CQ 00
d�V�
W
d
Lfl
CK
c
T
�aw�
oz'"O
4
-
i
����
Cr
W
Z0.
zLo zcow
Q
dQ'"o
mom
z
c:
z
W
c:
O
3
o
m
w
z�
w 0
r
0)
UO
� �
m
m
W
O
G7
z 0
Zz U
(D
I
a�
3d
W
a
a
CL
V
4 t
JPS aC*
QQ ��
�O
ALLAN H. WEIHE P -E. 8827
V
co
W
Z
e
q
W
V
N o
CU �
15
O
4.
e
n q
o
w Ww
�2
w �
o
A� O '� 4
SHEET NO.
C4