Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
17060097.3
A O 6"CO -C>-- (IE 94'-6") - -Q- 6"CO CO (IE 96.-6") v P MP 4"RD _4„STM — — - - / (BURIED) b 4"OD RTU -4 O RTU -2 O GENERAL NOTES: 1. CONTRACTOR SHALL CONTACT AND COORDINATE WITH ALL APPLICABLE UTILITIES, VERIFY AND BE RESPONSIBLE FOR ANY AND ALL FEES ASSOCIATED WITH INSTALLATION OF PLUMBING SYSTEMS. 2. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND EXISTING UTILITY SERVICE LOCATIONS PRIOR TO COMMENCING WORK. NOTIFY CONSTRUCTION MANAGER OF ANY INCONSISTENCIES WITH THE PLANS AND SPECIFICATIONS. 3. PLUMBING AND PIPING SYSTEMS SHALL BE INSTALLED COMPLETE PER ALL APPLICABLE STATE AND LOCAL CODES. ALL MATERIALS, FIXTURES, DEVICES SHALL BE SUBMITTED FOR APPROVAL TO ADMINISTRATIVE AUTHORITY AND SHALL CONFORM TO APPLICABLE STANDARDS AND BE FREE FROM DEFECTS PER INDIANA IPC 301.1.1. TEST SYSTEM PER 2012 IPC IAC 16-1.4 4. UNDERSLAB SANITARY & STORM PIPING SHALL BE SCH. 40 PVC & PITCHED MINIMUM OF 1/8" PER FOOT. WASTE, VENT, DRAIN PIPE SHALL COMPLY WITH 2012 IPC 675 IAC 16-1.4 701.0 TO 706.0 5. WATER PIPING SHALL BE "L" HARD DRAWN COPPER PER 2012 IPC 16-1.4 604.0 TO 608.0 PIPING SIZED PER 2012 IPC 16-1.4 6. TEST WATER SYSTEM UNDER 150 PSIG HYDROSTATIC PRESSURE FOR A MIN. OF 4 HOURS. 7. PROVIDE CLEANOUTS AT ENDS OF ALL HORZ. RUNS AND AT BASE OF VERTICAL WASTE STACKS. CLEANOUTS SAME SIZE AS PIPE THEY SERVE. PROVIDE SUITABLE WALL OR FLOOR CLEANOUT AND COVER APPROPRIATE FOR THE SUBSTRATE 8. ALL STORM DRAIN FIXTURES, LEADERS AND PIPING SHALL BE SIZED AND INSTALLED PER STATE CODE 2012 IPC IAC 16-14.1 CHAPTER 11 9. PROVIDE SCH. 40 BLACK PIPE, GAS VALVE, UNION AND DRIP LEG FOR ALL NEW GAS FIRED EQUIPMENT. INSTALL PER NFPA-54 & LOCAL CODES. NEW GAS PIPE ON ROOF SHALL BE SUPPORTED ON MANUFACTURED PIPE SUPPORTS. 10. COORDINATE HVAC ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIP. OR INSTALLATION. VERIFY VOLTAGE AND PHASE PRIOR TO ORDERING EQUIPMENT. 11. PROVIDE RETURN AIR DUCT SMOKE DETECTION DEVICE IN HVAC UNITS OVER 2000 CFM. I I 2 C 4"RD 6"RD 4"STM — (BURIED) 4„OD � 6„OD RTU -5 O � I � RTU-3IL a O 11L ✓V V / - - 1 I I 4"CO 4"CO HVAC EQUIPMENT 1. RTU -6: DOWNFLOW ROOFTOP, 10 TONS, GAS FIRED, , 3900 CFM, 1/2" TSP. 224 MBH HEATING, 2 -POS. OA DAMPER, DISCONNECT,208V/3PH, STD, CURB 2. EF -2: 75 CFM CEILING MOUNTED EXHAUST FAN. ELECTRICIAN TO WIRE WITH LIGHT SWITCH. �o© LTJ T C� P TANK& PIPING CONTRACTORS, INC. 350 Gradle Drive P.O. Box 3160 • Carmel,IN 46032 PH 317-846-4768 FAX 317-846-4788 HOOSIER AAA, SUITE #105 CLASSIC CLEANER, SUITE #106 1438 WEST MAIN STREET CARMEL, INDIANA 46032 MECHANICAL PLAN PROJECT NO.: DATE: 05/04/2017 SCALE:1 /8"=1 '-0" DRAWN: JS '-NECKED: TW r r