Loading...
HomeMy WebLinkAbout03100149.17EX 1ST 1 Ne C -7A5 R00F�0-701= UN 1 T SCHF-OULr- ITEM# AREA SERVED NOMINAL TONSOUTSIDE PAN DATA GOOLI N6 DATA HEATING DATA (5TUH) ELEC. DATA WEIGHT (L55.) MANUFACTURE/ MODEL # GFM AIR H.P. E.S.P. TOTAL 5EN515LE EER INPUT OUTPUT TEMP. RISE°P NO. STAGES RTU -1 SALES AREA 10 4000 800 2.9 .750 118,900 89,800 15.6 224,000 180,000 42 2 480/3 1250 BRYANT 5800120 RTU -2 5ALE5 AREA 10 4000 800 2.9 .750 1181900 891800 8b 224,000 180,000 42 2 480/3 1250 BRYANT 56OD120 RTU -3 5ALE5 AREA 10 4000 800 2.9 .750 118,900 89,800 5.6 224,000 180,000 42 2 480/3 1250 BRYANT 5800120 RTU -4 SALES AREA 10 4000 800 2.9 .750 1181900 8q,800 bb 224,000 180,000 42 2 480/3 1250 BRYANT 5800120 RTU -5 STORAGE 10 3000 300 2.40 1 .750 1 113,700 78,400 9.0 224,000 180,000 55 2 480/3 1250 BRYANT 580D120 NOTE: 1) RTU -I AND 4 SHALL BE REBALANCED TO MEET AIR FLOWS ON DRAWIN65. EX 1 Si 1 NC -7 FL. MB I NC F I X7JRE 5Ci-4Ei7UL E TEM# DESCRIPTION PIPE SIZES TRAP TYPE REMARKS G.W. H.W. SAN. VENT P-1 WATER GL05ET 1/2" .375 4" 2" INTEGRAL HANDICAPPED P-2 LAVATORY 1/2" 1/2" 2" 2" "P" HANDICAPPED P-3 DRINKING FOUNTAIN 1/2" 2" 2" "P" HANDICAPPED P-4 5ERVIGE 51NK 1/2" 1/2" 3" 2" "P" 5CHE:t ULE5 ANS EX 1ST 1 NC EX#4AU57 FAN ITEM# AREA SERVED G.P.M. WATTS E.S.P R.P.M. CONTROL MANUFACTURE/ MODEL # F -I TOILET ROOM 105 3-1 .375 12Q0 LIGHT 5WITGH GROAN 5L110 FLUE A• L 08.26.05 NOTE: ALL FANS SHALL BE 120 VOLT/I PHASE SEOUENCE Of= OFERA71ON ROOFTOP UNIT I DURING OCCUPIED PERIOD AS PROGRAMMED ON A550GIATED ROOFTOP THERMOSTAT, BLOWER FAN SHALL RUN GONTINUOU5LY AND OUTSIDE AIR DAMPERS OPEN TO MINIMUM. 2 ON A GALL FOR HEATING, GAS FIRED HEAT EXCHANGER SHALL BE ENERGIZED AND SHALL RUN UNTIL 5ETPOINT 15 SATISFIED. 3 ON A GALL FOR GOOLI N5, THE UNIT MOUNTED CONTROLS SHALL OPEN/GYGLE THE UNIT ECONOMIZER. IF THE OUTSIDE COND I T I ONS EXCEED THE SETTINGS OF THE ECONOMIZER CYCLE, THEN THE UNiT GOMPRE55OR (MECHANICAL COOLIN(5) SHALL BE ENERGIZED. THE UNIT GOOLING CYCLE SHALL RUN UNTIL 5ETPOINT 15 SATISFIED. 4 DURING NIGHT 5ETBAGK PERIOD AS PROGRAMMED ON A550CIATED ROOFTOP UNIT THERMOSTAT, BLOWER FAN SHALL BE OFF AND OUTSIDE AIR DAMPERS SHUT. ON A GALL FOR HEATI N& OR GOOL I NG, THE OUT51 DE AIR DAMPERS SHALL REMAIN CLOSED AND THE FAN OR ASSOCIATED HEAT EXGHANGER OR GOMPRE55OR CYCLE UNTIL SPACE 5ETPO I NT5 ARE SATISFIED. 5 UNIT SHALL BE DE -ENERGIZED IF SMOKE DETECTOR SENSES SMOKE OR ANY SAFETY/CONTROL EXGEE05 ITS LIMITS. EXHAUST FANS I TOILET ROOM EXHAUST FANS SHALL BE INTERLOCKED WITH LIGHT 5WITGH. UPON ENERGIZING LIGHT5 FAN SHALL RUN. UPON DE -ENERGIZING LI6HT5 FAN SHALL BE TURNED OFF. MECHANICAL. SPEG I F: I GAT I ON I. Section 15010 -Basic Mechanical Re!2ulrements A. The work of each of the mechanical sections includes furnishing and installing the material, equipment, and systems complete as specified and/or Indicated on the drawings. The mechanical installations, when finished, shall be complete and coordinated, ready for satisfactory service. B. All work under this contract shall be done In strict accordance with all applicable municipal, state, NFPA, Uniform and Local codes that govern each particular trade. G. The contractor shall make applications and paq all charges for all necessary permits, licenses and Inspections as required under the above codes. Upon completion of the work, the customary certifications of approval shall be furnished. D. No materials or equipment shall be used In the work until approved. Before submission of the shop drawings, and not more than thirty (30) days after award of the contract, the contractor shall submit for approval a complete list of materials and equipment which he Intends To furnish,iving manufacturer and catalog numbers. A complete list of proposed sub -contractors shall also be submitted. E. The contractor shall examine all drawings and specifications and shall inspect the existing conditions of the site. Failure to comply with this requirement will not relieve the contractor of responsibility for complying with the Intent of the contract documents. F. The drawings Indicate the general arrangement of the mechanical installations. Details of proposed departures due to actual field conditions or other causes shall be submitted for approval prior to Installation. Reworking of completed Items due to Improper field coordination shall be at the contractor's expense. G. Provide sufficient access and clearance for all items of equipment requiring servicing and maintenance, such as valves, dampers, controls, drives, drains, vents, starters, switches, filters, traps, and major items of equipment. H. The contractor shall perform all necessary cutting and patchingg as required to complete the installation of the mechanical work. Patching of walls, floors, ceilings, roof, etc. Shall match the adjacent surfaces. All roof work including cutting of the roof membrane shall be performed by the landlords roofing contractor at the mechanical contractors expense. I. The contractor shall prepare three (3) copies of a record and Information booklet. The booklet shall be bound in a three-ring loose-leaf binder. Provide the following data in the booklet: 1) Catalog data on each piece of equipment furnished. 2) Approved shop drawings on each piece of equipment furnished. 3) Maintenance, operation and lubrication Instruction on each piece of equipment furnished. 4) Simplified temperature control diagram. 5) Manufacturer's and contractor's guarantees. 6) Air balancing reports. 7) Gomm issloning reports. 8) Schedule/description of all service work/maintenance inspections required by paragraphs o, p and q of this section. J. All parts of RTU -2 AND 4 the heating, ventilating, air conditioning and exhaust systems shall be adjusted, checked, balanced, and tested b an Independent A.A.B.C. Certified testing $ balancing contractor approved by the owner. The contractor shall put all systems and equipment into full operation, and shall test and balance all devices to within ten (10) percent of capacities indicated on the drawings. Submit copies of the balancing reports as required by the contract. Permanently mark the position of each balancing damper. K. Upon completion of the mechanical installations, the contractor shall provide a complete set of prints of the mechanical contract drawings which shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. They shall be suitable for use in preparation of record drawings. L. All mechanical installations, including all materials and labor shall be guaranteed for a period of one (1) year from date of owner acceptance. The above shall not in any way void or abrogate equipment manufacturer's guarantee or warranty. Certificates of guarantee shall be delivered to the owner. 2. Section 15250 - Mechanical Insulation A. All new supply air ductwork, shall be insulated with fiberglass insulation. 3. Section 15300 - Fire Protection A. All work, materlals, equipment, and accessories shall comply with the standards of the national fire protection association and all state and local regulations. B. Extend and modify the existing wet pipe sprinkler system/ stub to properly cover/protect the tenant space. System shall generally be Ordinary Hazard II.Maximum 130 square feet per head and .17 gpm ® 3000 square foot. G. The modifications shall include, but are not limited to valves, flow switches, sprinkler heads and escutcheons, piping, fittings, hangers and signs and other identification markings, as required. D. The sprinkler contractor shall carefully examine all documents during the blddingeriod. He, shall familiarize himself with project conditions such as building construction and pipe and ductwork locations and elevations. E. Sprinkler heads shall be Installed to meet the new layout. Sprinkler heads shall be quick response type. Sprinkler heads In finished drywall ceilings shall be brushed chrome fully concealed/recessed type. XII heads in open bay areas with no ceiling shall be bronze upright type. F. The contractor shall arrange for approval of the sprinklers stems, and conduct tests in accordance with NFPA f3. G. The sprinkler contractor shall provide a detailed shop drawing showing piping layout, head locations, elevations and coordination with all mechanical, electrical andplumbingg trades. The contractor shall submit detalled sprinkler shop drawings with actual heads for architect approval prior to any fabrication. H. The sprinkler contractor must submit one septa of sprinkler shop drawings and hydraulic calculations to tenant coordinator and county fire department and landlords insurance underwriter prior to any fabrication or construction. 4. section 15880 - Air Distribution A. Furnish all labor and materials necessary to complete the sheet metal work associated with the heating, ventilating, air conditioning and exhaust systems, And other miscellaneous items shown and required. B. All ductwork shall be constructed and installed In accordance with the sheet metal and air conditioning contractors national association (smacna) standards, ashrae standards and boca standards. G. Flexible ductwork shall be hart 4 cooley type F214 or approved equal. Flexible duct shall comply with NFPA bulletin clOa and shall be U.L. Listed as class I air duct and connector, standard 181. D. Support horizontal ducts with hangers spaced not more than six (6) feet apart. Use straphangers for ducts up to thirty (30) Inches wide, angle hangers or rods for ducts over thirty (30) inches wide. 5traphangers to be one (1) inch wide, 20 gauge minimum; fasten to sides and bottom of duct with sheet metal screws. E. Ducts shall be straight and smooth on the inside, with Joints neatly finished. Ducts shall be suspended from he construction and shall be free from vibration. Curved elbows shall have a center radius equal to one and one-half (1-1/2) times the width of the duct. all square turns shall be vaned. Vanes consisting of curved metal blades shall permit the air to make abrupt turns without turbulence. F. All joints in the heating, ventilating, air conditioning an exhaust system ductwork shall be sealed. Sealant shall be as manufactured by United Inc or approved equal. Sealant shall be smacna and U.L. approved, with a flame. spread of 10 and a smoke developed of 0, non-toxic and non-flammable. Sealant shall be approved for operating temperatures from 0 degrees f. To 200 degrees f. Sealant system shall be installed In strict accordance with the manufacturer's recommendations and when applied shall provide a permanent seal without any deterioration. 5. Supply air diffusers shall have all steel construction, Titus model TM5 with vaned face and finished with #26 off-white enamel. H. Return air grille shall have all steel construction, Titus model 25R with louvered face and flnlshed with #26 off- white enamel. I. Supply air reglnters shall be double deflection type with opposed blade dampers with all steel construction. Registers shall be titus model 30OR5 with #26 off-white enamel finish. 5. Section 15950 - Controls A. The contractor under this heading shall furnish and Install all Items $ labor, etc. necessary for a complete electronic system of automatic temperature control. The system shall Include all necessary thermostats, relays, switches, etc. Required for successful operation. Electrical work In connection with the temperature control system shall be performed by the control contractor. B. Each RTU unit shall be controlled by a 24 hour/ 7 day wall mounted heating/cooling programmable thermostat. Thermostat shall be Honeywell model T-1300 or approved equal. G. Thermostat must be compatible with all RTU functions, controls and specified accessories. Contractor to coordinate with unit supplier. D The automatic temperature control contractor shall be responsible for the commissioning of the project to assure a fully functional, fine-tuned hvac system upon occupancy. The commissioning of the project shall be performed in accordance with american society of heating, refrigerating and air conditioning engineers, Inc. (Ashrae) pamphlet I-Ig89 guideline for commissloning of hvac systems. Gommissioning Is defined as verification of the proper operation of all equipment, alarms, safeties and control and energy management systems serving mechanical systems installed or modified on this project as defined within the specifications and indicated on the contract drawings. Proper operation is defined as the activation of all controls, field or factory installed, to assure the correct sequencing of equipment and systems, including activation of all operating and safety controls, as herein before described. The automatic temperature control contractor shall report all system deficiencies to the mechanical contractor. The mechanical contractor shall Instruct the proper trade to correct any deficiencies reported by the automatic temperature control contractor so that the project commissioning can be completed. Prior to the commencement of any commissioning work, the automatic temperature control contractor shall rovide the engineer with a commissloning report format or review and approval. The Report format shall be delivered to the engineer not more than thirty (30) da s after award of the atc contract or not Tess than slx�y (60) days prior to start of atc work, whichever Is earlier. Gommissloning report format shall include a list of all items to be verified, with the Initials of the mechanic who verified the particular Item/control and the date on which each item/control operation was verified. Three (3) commissioning reports are required. The first report shall be completed during the Initial commissloninof the project prior to occupancy. The second and Thlyd reports shall be completed no more than two (2) months (I report/month) after occupancy of the building. All controls/safeties shall be verified in the presence of the owner/owner's representative. The final report shall also contain the signature of the owner or owner's representative for each Item verified. yl /l DWA1'NE A. MANN, ARGHITEC 3801 S CAPITAL OF 7EXA5 H{ 5U I TE 330 AU571 N TX 7870 - TEL: 512.6112.7gq4 FAX: 512.Q12.71q1i5 DON PENN CONSULTING ENGINEER SM HO WAY 584 SWE 101 aRAPEVINF. TEXAS 78081 89.410-5868 FAX W401-Ull Up 6M = PE19600559 �0.47 T1. r ,O A• L 08.26.05 PERMIT, L.L. REVIEW 4 510 DATE 155UED FOR s /yin ne MERCHAN715 5QUARE CARMEL, IN 5PACE #R1 5CHE:t ULE5 ANS BFEC I � I CATI ON MWA #0382 FINL 5TORE #332