Loading...
HomeMy WebLinkAbout03100180.3TOP OF I -JOIST GONG. BLOCK 2" PERIMETER -' RIGID STYROFOAM INSULATION 16 "x8" DEEP GONG. FOOTING O TOP OF I -JOIST 4"x4" BRICK LEDGE GONG. BLOGK -' 2" PERIMETER R161D STYROFOAM INSULATION 16"x8" DEEP OGONG. FOOTING 2 TOP OF I-J015T 6ARA&E SLAB -' GONG. BLOGK 16"x8" DEEP GONG. FOOTING O TOP OF I -JOIST 6ARA6E SLAB 4"x4" BRIGK LEDGE GONG. BLOCK l b "x8" DEEP GONG. FOOTING 'F—CUNDATION SEGTIONS TOP OF I -JOIST GARAGE SLAB GONG. BLOCK -' 2" PERIMETER RIGID STYROFOAM INSULATION I6 "x8" DEEP OGONG. FOOTING 5 m'- ICK LEDGE PORCH SLAB GONG. BLOCK 16'x8" DEEP GONG. FOOTING SGALE: 1/4"=l' -C" PRELIMINARY EXTERIOR GRANL NOTES: I. DRAIN TILE AROUND PERIMETER RAN I NTD SUMP PIT. 2. WATERPROOF BLOCK WALLS. INTERIOR Gi`ANL FINISH: I. SLUSH POUR GRAWL FLOOR - SLOPE TO SUMP PIT - VISG2UEEN UNDER GONGRETE. AND AT EACH SIDE OF ALL OPENINGS, MIN. (2) PER PIEGE OF SILL. 2. 2" STYROFOAM PERIMETER INSULATION GLUED TO BLOCK WALLS BY FRAMER, 3. HVAC SUPPLY AND RETURN INTO CRAWL SPAGE 4. NO GRAWL VENTS. 5. INTERNAL DRAIN TILE RAN DIAC70N.ALLY TO SUMP PIT FOUNDATION NOTES I. ALLOWABLE 501L PRESSURE 2000 PSF. 2. FLOOR SLAB AREAS TO BE GOMPAGTED TO C15% MAX. DRY DENSITY. 3. STANDARD BASEMENT AND GARAGE SLAB TO BE 4" CONCRETE ON 4" OF GRAVEL FILL. 4. STRUCTURAL GONGRETE FOOTING TO BE 2500 PI, SLABS 3500 PSI. 5. BOTTOM OF ALL FOOTI N65 TO BE SET" BELOW LOCAL FROST LINE. SEE DETAILS. 6. PROVIDE ANCHOR BOLTS 1/2" DIA. xl8" STARTING (p 6" FROM EAGH GORNER a 6-0" O.G. AND AT EAGH SIDE OF ALL OPENIN65, MIN. (2) PER PIEGE OF SILL. SOD TOTAL "rARD DRAWN BY GMK CHECKED BY XXX DATE 10/06/03 5HEET NO 3