HomeMy WebLinkAbout03100219.3POURED
WALL
8 GONG. LINTEL
I.P." . P . t. .P, I
FOOTER FOR cap CONCRETE WALL
°X16° C.M.U.
A . 0 _
FOOTER FOR B -OAK ,J/.L_
LINTEL DETAIL FOR BASEMENT
SGALE: 1/4" = I' -O"
0
r
GENERAL FOUNDATION NOTE:
I) ALL SO+L 15 BASED ON 2800 P.5.F., AND CONCRETE 15 BASED ON
2500 P.S.I. 9 28 DAYS, FOOTERS ARE 16" WIDE AND 8" DEEP
UNLESS NOTED OTHERWISE ON PLANS.
2) BASEMENT WALL HEIGHT AS NOTED ON PLANS, W/ SHORT WALLS
o CRAWL SPACE OR SLAB BELOW FROST LINE AS REQUIRED.
3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND JUDGE
FOR THEMSELVES, THE SUITABILITY OF THE PLANS IN RELATIONSHIP
TO THE BUILDING SITE, AND EXISTING GRADES.
4) THESE DRAWINGS SER`✓E 5A A GUIDE TO THE CONSTRUCTION OF
THE BUILDING, DUE TO VARIATIONS IN DIFFERENT AREAS, THEY CAN
ONLY BE A GUIDE, AND IN NO WAY DICTATE ANY OF THE LOCAL
AND/ OR STATE BUILDING CODES. IT 15 THE CONTRACTORS FULL
RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCURACY AND
CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE
OF THEIR WORK. THE CONTR,4CTOR ASSUMES ALL RESPONSIBILITY
FOR ERRORS IN DESIGN, DIMENSIONS OR OMISSIONS.
5) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEED,
AND MAY CHANGE AT ANY TIME, IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY ACTUAL NEED AND SIZES IF NOT SHOWN.
6) ALL WINDOW SIZES LISTED ARE AS MANUFACTURED BY PELLA
PROLINE, UNLESS NOTED OTHERWISE, AND MAY VARY
BASED ON SUPPLIER, ALL FINISHES AND ROUGH OPENING$
MUST BE VERIFIED BY OWNER/ CONTRACTOR.
-1) ALL WALLS W/ BRICK ARE 1-1/2", ALL OTHERS TO BE 3-1/2" UNLE55
NOTED OTHERWISE ON PLANS.
5) ALL CEILINGS ARE 10' MAIN LEVEL AND 5' UPPER LEVEL OR AS
NOTED ON PLAN FOR GIVEN AREA,
S) ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION
OF THE CONTRACTOR IMMED ATELY BEFORE CONSTRUCTION
15 TO RESUME, TO INSURE PROPER STEPS ARE TAKEN.
FOUNDATION PLAN
SCALE: 1/4" = 1'-0" 1515 e,F,
10"X9' POURED CONC. WALLS
4" GONG. SLAB OVER
4" MIN. GRAVEL FILL
64'-O"
w^
Z
1
z
1
1
r-wj
Im
z
1
rill
p"
III --
op
October 24, 2003
DRAWN B -I': R.KRONIOK
SCALE: AS SHOWN
REVISIONS:
SHEET:
3
�
�T
v
�
N
W
a
bi
00�
Q
n
O
�5-
cYl
z
a
d
w^
Z
1
z
1
1
r-wj
Im
z
1
rill
p"
III --
op
October 24, 2003
DRAWN B -I': R.KRONIOK
SCALE: AS SHOWN
REVISIONS:
SHEET:
3