Loading...
HomeMy WebLinkAboutCommitment PAUL I.CRIPE,INC./7172 Graham Road/Indianapolis, Indiana 46250/(317) 842-6777 April 17, 1987 PIC Job #87339-00000 Mr. Charles E. Kiphart Director of Community Development 40 East Main Street Carmel , IN 46032 RE: Lexington Farms Dear Mr. Kiphart: The fol lowing agreement shall be included as a submittal with the final plat application: The developer shall be responsible for any drainage problems including standing water, flooding and erosion control , which arise or become evident at any time during the three year maintenance period after release of subdivision bonds, and which is attributable to a deficiency in subdivision drainage design or construction of drainage improvements. This shall include all pipes, structures, swales, ditches and ponds which are pertinent features to the property drainage of the subdivision. This responsibility of the developer shall not, however, include problems which are created, subsequent to the completion of the subdivision improvements by the improper grading by individual builders, or structures and improper grading installed or accomplished by individual homeowners. It is the intent of this requirement, that the developer shal I , specifically, provide such subsurface drains, or storm sewers or ditches as are required to properly rectify any drainage problem or subsurface water problem which was not contemplated in the original approved subdivision design, including, but not restricted to, disposal of subsurface water from footing drains or individual lots. Arie De.n Zieg Davis Develo$ ,ent Corp. Witness g 7 Date Land Development Engineers/Land Surveyors/Architects/Land Planners