HomeMy WebLinkAboutCommitment PAUL I.CRIPE,INC./7172 Graham Road/Indianapolis, Indiana 46250/(317) 842-6777
April 17, 1987
PIC Job #87339-00000
Mr. Charles E. Kiphart
Director of Community Development
40 East Main Street
Carmel , IN 46032
RE: Lexington Farms
Dear Mr. Kiphart:
The fol lowing agreement shall be included as a submittal with the final plat
application:
The developer shall be responsible for any drainage problems including
standing water, flooding and erosion control , which arise or become evident at
any time during the three year maintenance period after release of subdivision
bonds, and which is attributable to a deficiency in subdivision drainage
design or construction of drainage improvements. This shall include all pipes,
structures, swales, ditches and ponds which are pertinent features to the
property drainage of the subdivision.
This responsibility of the developer shall not, however, include problems
which are created, subsequent to the completion of the subdivision
improvements by the improper grading by individual builders, or structures and
improper grading installed or accomplished by individual homeowners.
It is the intent of this requirement, that the developer shal I , specifically,
provide such subsurface drains, or storm sewers or ditches as are required to
properly rectify any drainage problem or subsurface water problem which was
not contemplated in the original approved subdivision design, including, but
not restricted to, disposal of subsurface water from footing drains or
individual lots.
Arie
De.n Zieg
Davis Develo$ ,ent Corp.
Witness
g 7
Date
Land Development Engineers/Land Surveyors/Architects/Land Planners