Loading...
HomeMy WebLinkAboutDrainage • September 7, 1971 • BLUE WOODS CREEK STORM DRAINAGE (W.C. MOFFITT, ASA WILLIAMSON LEGAL DRAINS) ,Attention: Mr. Schutz & Mr. Thompson The Hamilton County Drainage Board and the County Surveyor accepts the proposed reconstruction plans of the above named ditch with the following specifications: 1. Ditch right-of-way to be 75 feet each side from top of bank. 2. Clear one side of all underbrush. 3. Leave all large trees possible on top of bank. 4. 2 : 1-Side slopes. 5. Burn and bury all trees, brush, and stumps at least two feet below finished grade. 6. Bury all rocks in excess 3 cubic foot. 7. Banks to be seeded (8 lbs. rye grass, 30 lbs. fes-cue, 600 lbs. 15-15-15/ac) . 8. Dirt excavated from ditch to be spread and leveled to one foot depth maximum. • • • 9. All road culverts, crossings, bridges and pipes must meet Hamilton Co. Highway; Specifications. 10. All bench marks and 'descriptions must be shown on plans. 11. Seeding of ditch banks must be completed immediately following construction. 12. No angle of less than 120° shall be oonstructed in the main channel of the open drain. Following reconstruction, the County Surveyor must inspect the completed project and give his approval. prior to• acceptance by the Hamilton County Drainage Board. After approval by the County Drainage Board the private drain constructed on the Geneva Fisher farm must be requested by the parties involved and ,must meet the specifications of the Hamilton . COnty Drainage Board. • • . A9 C A , ��4J • Harry L Hurlock