David Sexton November 22, 1993
Schneider Engineering
3020 North Post Road
Indpls., IN 46226-6518
Re: Brookfield/Bayhill - Primary Plat - Preliminary review
Dear David,
Upon review of your submitted materials, I have found the following items will need to
(1/4# be addressed: •
Support items
yStatement from the City Street Department and the City Engineer's office regarding the
impact of the development on the surrounding roadway system and recommended
improvements for each adjoining street and entrance point
firm scale of overall plat on sheet S-1
eitt ovenants and restrictions for.this development -none submitted - please be sure the
following items are addressed
- dusk to dawn yard lights to be installed on each lot by the builder/developer per
7.1.7 of the Cluster ordinance.
- specific sections on the maintenance and replacement of material in the common
areas
F' - a restriction on fencing along major thoroughfares and in common areas
1Still awaiting submittal of traffic impact study, upon submittal will review and forward
compants
1.4 soils report needs to be submitted to go with the soils map included in the submittal
e-Please submit support documents required by the Subdivision Regulations - i.e. report
on utilities, drainage and Comp. Plan
r.-A statement from Carmel Sewer and Water Utility needs to be submitted confirming
adequate capacity
a---Correspondence from the TAC members needs to be submitted upon receipt, as of the
date of this letter no correspondence has been received.
Landscape plan - has been reviewed by Mike Hollibaugh of our office, preliminary
review, indicates the following:
- If this is a cluster, where is the open space? This lack of open space is a serious
design flaw. This plan needs to go back to the drawing board.
- In order to design a more complete buffer, it is recommended that additional
plant material be added to the greenbelt buffer of lots 69 through 73, which back
up to 126th Street.
ONE CIVIC SQUARE CARMEL,INDIANA 46032 317;571-2400
Page 2
Brookfield
Nov. 22, 1993
- The protection/utilization of existing trees on this site appears have been given
little consideration with this proposal. Residential Development Objective #1, in
the 1991 Comprehensive Plan, states that, "wherever possible, natural amenities
such as greenbelts, trees stands, creeks, and drainage courses should be
accessible and visible to the public from public right's-of-way and
roadways...."(p80). Explain how this Objective has been addressed in this
proposal..
- Provide Department with copy of wetland delineation report and approval letters
from Army Corps and IDEM for encroachment or filling of wetlands on this
project site.
p Signage plan - please dimension proposed signage - to confirm compliance with the sign
ordinance - where will the signage be place, at what entrances? Will there internal
directional, phasing or predevelopment signs for this project?
Primary Plat
-, treet and Subdivision names will need to receive approval from the Carmel\Clay
Communications Center - Jerry Lowe
t,-Please include a stub street to the south property - for the development of the long
narrow tract owned by American Aggregates, which is already stubbed from the south
from Lake Forest, this will allow for the development of that parcel with a minimum
length cul-de-sac and additional stub to the east and eventually to Hazeldell Road. This
stub could be accomplished with minimum disturbance by moving lots 91, 90 & 89 to the
west and placing the stub across from Windbush Way.
47,Please contact the City Engineer's office regarding the entrance configuration of island
and street design. They will need the Board of Public Works and Safety approval as
shown.
‘X'urrently, the accel/decel lanes have been shown at the entrance, please dimension so
compliance as to length can be shown per the regulations.
f,Oocation, size and capacity of storm sewer, water system and sanitary sewer will need
to be reviewed by the appropriate Departments, County Surveyor, SCS & City Engineer
for drainage, sanitary and water.
r-Non-access easements need to be added along perimeter of project that abuts public
right sof=ways.
man I have a Certification statement from the design engineer stating that sections
6.3.155-6.3.16, 6.3.17 & 6.3.18 will be met in the design of this project?
,,,---Please dimension right-of-ways throughout and around the development to show
conformance with the Comprehensive plan for ROW dedication.
Currently, no road improvements are shown to the perimeter thoroughfares - are we
awaiting traffic impact study for recommendations, or are no improvements planned
age easements will need to be added along the back of lot 83.
-+Monuments, markers and benchmark need to be added to the plat
Page 3
Brookfield
Nov. 22, 1993
If you have any questions to the above comments or the process before you, feel free to
contact me at (317) 571-2444, at your convenience.
Sincerely
,i/ /----------
David D. C/ ingham, AICP
Assistant / rector
Department of Community Development
City of Carmel, Indiana
DDC
cc: George Sweet, 9502 Angola Court, Indpls., IN 46268
Plan Commission File
DDC file
Mike Hollibaugh
DOCD Staff
file
Page 3
Brookfield
Nov. 22, 1993
VPrepare a break down of overall acreage/common area/flood plain/and surrounding
developments density be completed and included for the file?
'The area to the west of lot 89 needs to be labeled as common area or its proposed use
indicated
*Does the greenbelt easement continue in front lots 83 thru 88?
Supportive materials - per Cluster ordinance
•
- Please refer to section 7.1.3 of the cluster ordinance and be prepared to address the
following,items at the Plan Commission;
to location and style of building units
- e general architectural ffie exterior building materials
/treatment of the greenbelt buffers and other open spaces
to lighting, landscaping, and signage
liVilunber of and location of all parking spaces
. oposed restrictive covenants
/means of adequately maintaining all common areas
Public Notice
of the date of this letter, I have not received any of the Public Notice information
required by the ordinance.
Filing Fee
A $1070.00 + $100.00 for each requested variance of the Subdivision Regulations will
need to be submitted.
The above comments will need to be addressed and updated plans need to be submitted
no later than December 10, 1993, to assure our office adequate time to review your proposed
project.
• I have tenantively scheduled you for a preliminary review of the Primary Plat by TAC
at the December 22, 1993 TAC meeting. I will tenantively schedule you for the Jan. 18, 1994
Plan Commission meeting.
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS-AT-LAW
3021 EAST 98TH STREET
JAMES J. NELSON SUITE 220
CHARLES D. FRANKENBERGER INDIANAPOLIS
,INDIANA 46280
JANET WOLF SWISS 317-844-0106
JANEOF COUNSEL FAX 317-846-8782
B MERRILL
December 1, 1993
Mr. Dave Cunningham
Department of Community Development
One Civic Square
Carmel, Indiana 46032
Re: Brenwick Development Company, Inc./Residential Community/126th Street
Dear Dave:
Enclosed is a copy of the Traffic Impact Analysis prepared for the Proposed Residential
Community to be located on 126th Street, Carmel, Indiana, and to be developed by Brenwick
Development Company, Inc.
Following your review, should you have any questions, please feel free to contact me.
Kindest regards,
bk LSON & FRANKENBERGER
li.—
Nelson
Ja► n
JJN/bg
Enclosure
•
John V.Schneider, P.E., L.S. Gary R.Kent,L.S.
President
Edward D.Giacoletti,L.S.
James M. Mulryan,L.S.
Stephen M. Cooper,L.S. Richard G.Rayback,L.S.
Vice President Paul C.Claire,P.E.
Duane A. Sharrer,P.E.
Nancy Rumschlag Wesley L.Day,L.S.
Controller-Treasurer Richard A.Henderson,P.E.
James C. Hart,P.E.
SCHNEIDER ENGINEERING CORPORATION Evan J. Evans,L.S.
Vincent J.Schneider, P.E., L.S. Professional Engineers -Land Surveyors-Land Planners-Geologists J.Cort Crosby,P.E.
1917-1990 Fred I.Krebs,P.E.
Dannie L.Smith,P.E.
December 10, 1993 Thomas A.Kallio,C.P.G.
4
Dave Cunningham
Department of Community Development Ot
•
One Civic Square �,Dow
Carmel, IN 46032
RE: BAYHILL & BROOKFIELD AT WATERSTONE 8
KO
PRIMARY PLAT - CLUSTER
Dear Dave,
Please find enclosed two sets of the Primary Plat for Bayhill & Brookfield at Waterstone
amended per your comment letter dated November 22, 1993. So that you may follow along
more easily, I have numbered each of your remarks (copy attached) and have responded
appropriately.
1. A copy of the Primary Plat was forwarded to Dave Klingensmith of the City Street
Department and to Randy Powell of the City Engineer's Office on November 15,
1993. A copy of each letter is included in the enclosed Application booklet for your
reference.As of this date I have not received from either any comments regarding
the entry or surrounding streets.Also included in the Application booklet is a copy
of a follow up letter to Mr. Klingensmith and Mr. Powell requesting a response.
2. The scale as originally shown on sheet S-1 is correct, 1"=200'.
3. A copy of the covenants and restrictions will be supplied to you by the developer and
will address dusk to dawn lights, maintenance of common areas and fencing.
4. Copies of the Traffic Impact Study, by A & F Engineering is also included in this
package, for your review.
5. A soils map and support material is included within the Application booklet.
6. Included in the Application booklet are support documents required by the
Subdivision Regulations including, a report on utilities, drainage and the
Comprehensive Plan.
INDIANAPOLIS: AVON:
3020 North Post Road,Indianapolis,Indiana 46226-6518 6845 East U.S.36,Suite 500
P.O.Box 26068,Indianapolis,Indiana 46226-0068 Danville,Indiana 46122
TEL:(317)898-8282 TEL:(317)272-0108
FAX: (317)899-8010 7-, FAX:(317)272-0412
recycled paper
Dave Cunningham
December 10, 1993
Page 2 of 4
7. A copy of the Primary Plat was forwarded to Jim Dougherty of the City Utilities
Office and to Randy Powell of the City Engineer's Office on November 15,
1993. A copy of each letter is included in the enclosed Application booklet for your
reference.As of this date I have not received from either any comments regarding
adequate sewer and water capacity. Also included in the Application booklet is a
copy of a follow up letter to Mr. Dougherty and Mr. Powell requesting a response.
8. Copies of correspondence from TAC members, as of this date, are also included in
the Application booklet.
9. Regarding the Landscape Plan, please note that revised plans have been prepared
by Joanne Samarzija of Salsbery Bros.Landscaping.You will note that with this new
plan the protection & utilization existing trees along the perimeter of the site has
been addressed. With respect to residential development objective #1 in the 1991
Comprehensive Plan please note that all common areas, whether they are ponds,
landscaping, etc.. are accessible either directly or by way of easements to public
right-of-way.
With regard to open space this project,if considered to stand alone,contains roughly
8.0 acres of ponds, common area, etc.. along with 3.3 acres of perimeter landscape
easements totaling 11.3 acres, or 13.8 % of the total project. Our goal however, has
always been to include this project as an extension of the Waterstone Community
as illustrated by our rezone request earlier this year which, you will recall, received
a favorable recommendation from the Plan Commission. So while asserting our
position that this project is an continuation of Waterstone I offer the following data
with regard to open space:
Area Total Acreage Open Space % Open Space
Waterstone 288 ac. 64.8 ac. 22.5 %
Bayhill & Brookfield 81 ac. 11.3 ac. 13.8 %
Total 369 ac. 75.6 ac. 20.5 %
It is our conviction therefore,that the design, proposed open spaces and greenbelts
for Bayhill and Brookfield, together with the existing Waterstone development,
creates abundant expanses of open space.
Regarding the existing wetland area as shown on the National Inventory Map and
located adjacent to 126th Street and West of the proposed 126th entrance, I submit
the subsequent commentary.The dredging and enlarging of this wetland is permitted
under the Nationwide Permit from the Corps of Engineers since 1). it is under one
acre in size, and 2). it is not considered a high quality wetland as identified on the
Inventory Maps.
Dave Cunningham
December 10, 1993
Page 3 of 4
10. The locations of proposed signage has been added to primary plat. The dimensions
of the signs have been included in the Application booklet.
11. The street names were forwarded to Carmel/Clay Communications and they asked
to have two street names revised. The two street names have been revised and
resubmitted to Carmel/Clay Communications for approval. A copy of
correspondence is included in the Application booklet.
12. A street stub has been added to the South property line.
13. A copy of the Primary Plat was forwarded to Randy Powell of the City Engineer's
Office on November 15, 1993. A copy of the letter is included in the enclosed
Application booklet for your reference. As of this date I have not received any
comments regarding the entrance configuration and street design. Also included in
the Application booklet is a copy of a follow up letter to Mr. Powell requesting a
response.
14. The accel decel lanes have been dimensioned for your review.
15. A copy of the Primary Plat was forwarded to Randy Powell of the City Engineer's
Office, Kent Ward of the Surveyor's Office and John South of the Hamilton County
Soil and Water Conservation Office on November 15, 1993. A copy of the letters are
included in the enclosed Application booklet for your reference. As of this date I
have not received any comments from Mr. Powell or Mr. Ward. Also included in
the Application booklet is a copy of a follow up letter to Mr. Powell and Mr. Ward
requesting a response. A comment letter has been received from John South. A copy
of correspondence with Mr. South is included in Application booklet.
16. A non-access easement has been added along the right-of-way of 126th Street.
17. Sections 6.3.15, 6.3.16, 6.3.17 and 6.3.18 of the Subdivision Control Ordinance are
and will be met in the design of this project.
18. Right-of-ways have been dimensioned on the Primary Plat.
19. Perimeter road improvements, if any, are addressed in the Traffic Impact Study by
A & F Engineering
20. A drainage easement has been added to the back of lot 83.
21. Monuments, markers and benchmark have been added to the Primary Plat.
Dave Cunningham
December 10, 1993
Page 4 of 4
22. A breakdown of overall acreage and common areas is listed under item 9 of this
letter.The surrounding development densities is included in the Application booklet.
23. The area West of lot 89 has been labeled as common area on the Primary Plat.
24. The greenbelt easement does not continue in front of lots 83 thru 88 and has been
removed.
25. You will find several of the items listed in section 7.1.3 of the cluster ordinance
included in the Application booklet and in the covenants & restrictions, including:
- location & style of building units
- general architectural style
- exterior building materials
- treatment of greenbelts and open spaces
- site landscaping and signage
- maintenance of common areas
A parking plan has been added to the primary plat.
26. Public Notice information will be forwarded to you by Mr. Jim Nelson.
27. A $ 1070.00 application fee will be forwarded to you by Waterstone Land Co., LP.
No variances of the Subdivision Regulations are being sought with this application.
Please note that we have changed the Bayhill portion of the project to Bayhill at
Waterstone, Sections 6 & 7 and that the lot numbers for Bayhill now start with 170.
If you should have any questions, or are in need of additional information, please feel free
to contact me at your convenience.
Sincerely,
S NEIDER E7RING CORP.
Dave Sexton
Project Manager
. r
t Cityof C
--" in il
;i��U ,
David Sexton November 22, 1993
Schneider Engineering
3020 North Post Road
Indpls., IN 46226-6518
Re: Brookfield/Bayhill - Primary Plat - Preliminary review
Dear David,
Upon review of your submitted materials, I have found the following items will need to
be addressed:
Support items
0- Statement from the City Street Department and the City Engineer's office regarding the
impact of the development on the surrounding roadway system and recommended
improvements for each adjoining street and entrance point
QZ - Confirm scale of overall plat on sheet S-1
0- Covenants and restrictions for this development -none submitted - please be sure the
following items are addressed
- dusk to dawn yard lights to be installed on each lot by the builder/developer per
7.1.7 of the Cluster ordinance.
- specific sections on the maintenance and replacement of material in the common
areas
- a restriction on fencing along major thoroughfares and in common areas
O- Still awaiting submittal of traffic impact study, upon submittal will review and forward
comments
5 A soils report needs to be submitted to go with the soils map included in the submittal
fo - Please submit support documents required by the Subdivision Regulations - i.e. report
on utilities, drainage and Comp. Plan
0- A statement from Carmel Sewer and Water Utility needs to be submitted confirming
adequate capacity
®- Correspondence from the TAC members needs to be submitted upon receipt, as of the
date of this letter no correspondence has been received.
®- Landscape plan - has been reviewed by Mike Hollibaugh of our office, preliminary
review, indicates the following:
- If this is a cluster, where is the open space? This lack of open space is a serious
design flaw. This plan needs to go back to the drawing board.
- In order to design a more complete buffer, it is recommended that additional
plant material be added to the greenbelt buffer of lots 69 through 73, which back
up to 126th Street.
ONE CIVIC SQUARE CARMEL,INDIANA 46032 317/571-2400
Page 2
Brookfield
Nov. 22, 1993
- The protection/utilization of existing trees on this site appears have been given
little consideration with this proposal. Residential Development Objective #1, in
the 1991 Comprehensive Plan, states that, "wherever possible, natural amenities
such as greenbelts, trees stands, creeks, and drainage courses should be
accessible and visible to the public from public right's-of-way and
roadways...."(p80). Explain how this Objective has been addressed in this
proposal..
- Provide Department with copy of wetland delineation report and approval letters
from Army Corps and IDEM for encroachment or filling of wetlands on this
project site.
Signage plan -please dimension proposed signage -to confirm compliance with the sign
ordinance - where will the signage be place, at what entrances? Will there internal
directional, phasing or predevelopment signs for this project?
Primary Plat
0Street and Subdivision names will need to receive approval from the Cannel\Clay
Communications Center - Jerry Lowe
0- Please include a stub street to the south property - for the development of the long
narrow tract owned by American Aggregates, which is already stubbed from the south
from Lake Forest, this will allow for the development of that parcel with a minimum
length cul-de-sac and additional stub to the east and eventually to Hazeldell Road. This
stub could be accomplished with minimum disturbance by moving lots 91, 90 & 89 to the
west and placing the stub across from Windbush Way.
0Please contact the City Engineer's office regarding the entrance configuration of island
and street design. They will need the Board of Public Works and Safety approval as
shown.
14 Currently, the accel/decel lanes have been shown at the entrance, please dimension so
compliance as to length can be shown per the regulations.
16 Location, size and capacity of storm sewer, water system and sanitary sewer will need
to be reviewed by the appropriate Departments, County Surveyor, SCS & City Engineer
for drainage, sanitary and water.
0- Non-access easements need to be added along perimeter of project that abuts public
right-of-ways.
0Can I have a Certification statement from the design engineer stating that sections
6.3.15, 6.3.16, 6.3.17 & 6.3.18 will be met in the design of this project?
Q- Please dimension right-of-ways throughout and around the development to show
conformance with the Comprehensive plan for ROW dedication.
0- Currently, no road improvements are shown to the perimeter thoroughfares - are we
awaiting traffic impact study for recommendations, or are no improvements planned
Q Drainage easements will need to be added along the back of lot 83.
® Monuments, markers and benchmark need to be added to the plat
Page 3
Brookfield
Nov. 22, 1993
®- Prepare a break down of overall acreage/common area/flood plain/and surrounding
developments density be completed and included for the file?
aThe area to the west of lot 89 needs to be labeled as common area or its proposed use
indicated
QDoes the greenbelt easement continue in front lots 83 thru 88?
Supportive materials - per Cluster ordinance
0- Please refer to section 7.1.3 of the cluster ordinance and be prepared to address the
following items at the Plan Commission;
- the location and style of building units
- the general architectural style
- the exterior building materials
- treatment of the greenbelt buffers and other open spaces
- site lighting, landscaping, and signage
- number of and location of all parking spaces
- proposed restrictive covenants
- means of adequately maintaining all common areas
Public Notice
aas of the date of this letter, I have not received any of the Public Notice information
required by the ordinance.
Filing Fee
a A $1070.00 + $100.00 for each requested variance of the Subdivision Regulations will
need to be submitted.
The above comments will need to be addressed and updated plans need to be submitted
no later than December 10, 1993, to assure our office adequate time to review your proposed
project.
I have tenantively scheduled you for a preliminary review of the Primary Plat by TAC
at the December 22, 1993 TAC meeting. I will tenantively schedule you for the Jan. 18, 1994
Plan Commission meeting.
t
Page 3
Brookfield
Nov. 22, 1993
If you have any questions to the above comments or the process before you, feel free to
contact me at (317) 571-2444, at your convenience.
Sincerely
A Al
de, _------------
David D. C/ ingham, AICP
Assistant/erector
Department of Community Development
City of Carmel, Indiana
DDC
cc: George Sweet, 9502 Angola Court, Indpls., IN 46268
Plan Commission File
DDC file
Mike Hollibaugh
DOCD Staff
file
HAM. Co. siva) CARMEL PC (4001
•
41 SIP" -
• ol
Maui'ton County Soil and Water Conservation District
925 piviSion Street—Nob1esvjfle IN 4606.0-2744—(317)7734406—Fax(317)776-1101
Erasiou and S(*huent Control
On-site ti4i.1uation and Assistance
Project Naine: ____VaLL-741<xtt e
Project By: ers.7iA.t-4/3". . 7L • - • •
4' Pf a 111, -40, •
. .
Reported By: '! .
Present at Site: •
•
•
Location: - AZ
. .
Section: 53 T: R: ;
reportare intrude:1 to evaluateiccaentation cidic and ctirpicmic43a.t1il plarr,as well as ,
identify areas where additional.mamas inay be requined n:annntnal erosipn,and sediment_All pracrices included in the plan,.
ias welt as*me suggested in the corments sivrapi be erOared as to Thigt.feasibil#T tin qualified iuslividual with sriliqnral
ndices designed.by'.gqualified.txtgine' et :" T. . •
—A11 erasion end sedan=control should meet tile designtitetia." standards and vecifmatiens outlined in the"Indiana
Handbook for Eresiari Control in Developing Areas"availiibteAnin tbe lab)nars9piirt*It oftiattual Re =4.Division nrSng
:
will Nesse respond within ten days to the concerns expressed in this letter.If!hart is no response,a copy of this letter LI
be Sent to Indiana Dep.arnuentOILrifirnoninotauStaaagement(MEM). . " , •
•Type of Evaluation: britoutine U Ffoliow-up U Complaint
r YES
• . .
NO GEtstElka,PROVISIONS :; - • • •
IA _NA Erosion -.11(1 sedimentationt .1 an. Vailable on conaruction site
18 Is the plan being implemented
• -
patuutiankaffitsediguntation)
. .
2A V Evidence of sediment leavtng the site
• 213 ,7 Site conditionE present*4 potential foi off-bite damage from seniment . .
2C _se•_ Evidence that soil/Sediment is being tracked onto public roads
.Erasiall.and-S4mentadinti Conktrol.frarticpc
3A V" Erosion and sedimentation control appropriately incorporated into earthmoving activities
3B _ sve,caoteg 041 Do practices require maintenance or modification
3C Practices Installed in the Proper locations
3D re On-Site drainage cbirtild nad outlet%Stabilized
3E at Areas stabilized as specified in the construction sequence
3F Si01111 sewer inlets protected to prevent sediment from entering stormwater nigt.system
. -.
•
-- ......+ i r uttut HAM. CO, SVFCD -r-4_) C
_• ... 1 CARMEL PC ��t02
•
Additi Comments: 1
eq - 1
4
i
er
_"w f .J.'.-}f I y.. is -
62'
ei c y i j f+l0.c as
i `
Grp , ,j/fi��f/�j
-C ,'L e'r'f+F +Zn4' -fir Are ,,ff Lr:
+.T „� -
•
j
__.._.....L----''":" ----""—"--------- "''—'-'---"---T---'''—""''-*'.—"'"—"-7---""-"'"--'"--' " -----
,
'—''"--'"'"' "..-* --"'--."' ''"- -"----- —'"+." --".'"--"----- "'""" ------- •-. --.....—:—....-- .. ,
1
f
j
i
t
(--, 1 0
MEMO November 22, 1993
TO: Dave Cunningham, A.I.C.P.
FROM: Mike HollibGugh
Re: Bayhill & Bro )kfield at Waterstone - Primary Plat
1. If this is a cluster, where is the open space? This lack of open space is a serious
design flaw. This plan needs to go back to the drawing board.
2. In order to design a more complete buffer, it is recommendended that addtional plant
material be added to the greenbelt buffer of lots 69 through 73, which back up to
126th Street.
3. The protection/utilization of existing trees on this site appears have been given little
consideration with this proposal. Residential Development Objective #1, in the 1991
Comprehensive Plan, states that, "wherever possible, natural amenities such as
greenbelts, trees stands, creeks, aqnd drainage courses should be accessible and visible
to the public from public rights-of-way and roadways...."(p 80).
Explain how this Objective has been addressed in this proposal..
4. Provide Department with copy of wetland delineation report and approval letters from
Army Corps and IDEM for encroachment or filling of wetlands on this project site.
5.
BOARD Carmel Clay Schools
President ADMINISTRATION
SUE RICHARDSON ti CLAYS
Cf,
Vice-President R. STEPHEN TEGARDEN, Ph.D.
HAROLD O. CASALI O Director of Elementary Education
Secretary NANCYLEE C. BUCKLEY
JON R. SCHMIDTKE, Ph.D. Director of Employee
Members 4
and Student Relations
CAROL CHEGAR JAMES F BURRELL, Ed.S.
PHILIP N. ESKEW, Jr., M.D. 9Rti1EL,IN��P�P Director of Personnel
November 23, 1993 SCOTT CHANDLER
Director of Business
ROGER D. HARPER, Ed.S.
Director of Media Services
KAREN K. NIEMEYER, M.L.S.
Mr. Dave Sexton
Schneider Engineering Corporation
3020 North Post Road
Indianapolis, IN 46226-6518
RE: BAYHILL AND BROOKFIELD AT WATERSTONE
Dear Mr. Sexton:
Carmel Clay Schools appreciates notification of Bayhill and Brookfield at Waterstone primary
plat application. The school corporation has two areas of concern. In the interest of safety, the
installation of sidewalks should be mandated within the subdivision. In addition, any cul-de-sacs
should be a minimum of 93 feet to accommodate the turning radius of an 84 passenger school
bus.
Information regarding the development of new subdivisions is extremely beneficial, as the school
corporation continually reviews long range plans to accommodate the educational needs of this
growing community. Carmel Clay Schools fully intends to provide a quality educational program
for the patrons of Bayhill and Brookfield at Waterstone.
Sincerely,
Roge r D. Harper
Dire or of Busin•ss
RDH:nbw
cc: Mr. David Cunningham
DOCD
EDUCATIONAL SERVICES CENTER • 5201 E. 131ST STREET • CARMEL,IN 46033 • TELEPHONE(317)844-9961 • FAX(317)844-9965
Na"0"F"cAiicy�
Ol ! OF..Cqq
6 - - City
®f Carm
/`TON .Co,''I�1
� OS
0 010
December 20, 1993
TO: Dave Cunningham
FROM: David Klingensmith
RE: Brookfield/Bayhill - Primary Plat
This development will indeed have an impact of increased traffic and road maintenance.
I relinquish further comment on this proposed development to the Department of Community
Development and the Engineering Department.
Thank you,
) ,..,,
/ ' ,.....J
David W. Klingensm.
7
Street Commission
DK/jf
cc: David Sexton, Schneider Engineering
Tom Welch, Engineer
211 2nd STREET,S.W. CARMEL,INDIANA 46032 317/571-2637
-- ---.v- .,...,, ,oftut HAN. CO. SWCD -►-+a CARREL PC
a004
^\
19i PP
{ 925 Division Street - Noblesville Int 48x8 l 1
3!?) ?� -z�o��t i
IFAX 776-1101
I
November 18, 1693
To: Director
Department of Community Development
One Civic Square
Carmel IN 46032
From: John 8. South P.B., SweD Engineer 43_ 4g4.,g
Project: Bayhill and Brookfield at Waterstaue Primary
Detail soil information is available at the SCS-SWCD Office. The map on the plans
only locate the soii types with abbreviated soil names.
According to the USDA-SCS inventory of potential wetlands and USDI NWS inventory
maps there is tiie potential of a wetland on this site. Maps may be viewed at the
SCS-SWCD office. Private consultants will make an on-site determination.
It appears from the size of this project a Notice of Intent letter is required to
be filed with Indiana Department of 8u2vironmental
Management.
Comments:
1- Soils and area maps would be helpful.
2. A drainage summary is needed.
3. How are you overcoming the soil limitations for Westiand?
4. Drainage easement is needed at the rear of lot 27.
5. Review drainage at the rear of lots 11-15.
6. How much outer enters the project at the rear of lots 4 and 5?
7. The lake elevations are unreali