HomeMy WebLinkAbout03040002.80L_
ON—
GENERAL. N0TE5:
CONSTRUCTION SHALL COMPLY IN ALL RESPECTS WITH APPLICABLE
FEDERAL, STATE, COUNTY AND/OR LOCAL STATUTES, ORDINANCES,
REGULATION5, LAWS, AND CODES. CONTRACTOR SHALL BE RESPONSIBLE
FOR FINAL DE51 GN AND WARRANTY.
2. ALL WORK INDICATED 15 NEW AND B"' THE MECHANICAL TRADE UNLE55
OTHERNISE NOTED.
3. HVAC SUBCONTRACTOR SHALL COORDINATE H15 NORK WITH OTHER TRADES.
4. SECURE AND PAY FOR ALL REQUIRED PERMITS AND SUPPLY TO G.G. PRIOR
TO STARTING NORK.
5. ALL DUCTNORK SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH TRADE
APPROVED METHODS AND TEGHNIQUE5.
b. THE NORK SHALL INCLUDE STARTUP OF ALL SYSTEMS, FURNISHING OF
OPERATION AND MAINTENANCE INSTRUCTIONS AND ONE YEAR GUARANTEE
COMMENCING ON DATE OF PROJECT ,ACCEPTANCE BY ONNER.
7. BATH CEILING EXHAUST FANS:
A. FANS TO BE PURCHASED AND INSTALLED BY MECHANICAL SUBCONTRACTOR.
E.G. TO PROVIDE 5WITGHIN0 AND ELEC. CONNECTIONS.
8. HVAC SUBCONTRACTOR SHALL VERIFY LOCATION OF ALL PENETRATIONS WITH G.G.
PRIOR TO INSTALLATION.
q. HVAC SUBCONTRACTOR SHALL BALANCE SYSTEM PRIOR TO OWNER MOVE—IN DATE.
10. PROVIDE AND INSTALL HVAC SYSTEM COMPLETE AND OPERATIONAL.
I. GALVANIZED SHEET METAL DUCT MATERIAL, CONSTRUCTION AND INSTALLATION SHALL
BE IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION HVAC DUCT CONSTRUCTION
STANDARDS — METAL AND FLEXABLE, LATEST EDITIONS.
<E '*T-' F"L AN
1)
tt m"4
IS TA
`s4 L WE
A19
• No.
4330
SIATF O4
X4.9 �tiOMNF
0
W
Q(
� Is
:5NEET N;
!0
CL
`
0m
CL
®
c N <p
(0
pCCpV
CC
U
~
ca
M
>
cc _
3�
0
W
Q(
� Is
:5NEET N;
!0