Loading...
HomeMy WebLinkAboutLinkside Subdivision Primary Plat Approval 3.30.94 dZaViS A" 2 % IF 7 - _ dli DEVELOPMENT, L.P. 7 Dm March 30, 1994 • 8 Mr. David Cunningham City of Carmel Department of Community Development 40 East Main Street Carmel, IN 46032 Re: Linkside Subdivision Primary Plat Approval Dear Mr. Cunningham: We appreciate receiving your letter summarizing the concerns of the surrounding homeowners and Plan Commission members regarding our proposed Linkside plkd ^t. We have reviewed your comments and evaluated the concerns and have tried to make appropriate changes into our land plan which will help address those concerns. Please note that these changes to the land plan are in addition to the several changes we have made (primarily in response to comments received from staff and at the early meetings we set up with the surrounding neighborhood groups) since our initial submittal to you in October of 1993. Again, the changes we had already made to the plan are numerous. For example, in the Manor Section at the southeast corner of the project abutting Greentree Subdivision, we eliminated several lots to incorporate a larger amenity area which includes a swimming pool, bath house, tennis courts, basketball court, volleyball court and parking facility. In addition to this amenity area, we pulled the lots and street system further away from the Greentree Subdivision. Along the west property line, we designed a 70 foot buffer strip which contains a heavily landscaped area in addition to a buffer strip ranging from 30 feet to 100 feet along the north property line. In the northwest corner of the project we realigned the entrance to the community with the Ashbrooke entrance. In doing so, we extended the larger Estate lots from this entrance to the north property line thereby reducing the number of smaller Village lots abutting the Ashbrooke Subdivision. Again, all of these changes were made prior to our initial presentation to the Plan Commission. The proposed additional changes which we would be making at this point in time are summarized as follows: 3755 East 82nd Street, Suite 120, Indianapolis, Indiana 46240 (317) 595-2900 FAX (317) 595-2930 Mr. David Cunningham March 30, 1994 Page 2 At the north entrance on Shelbourne Road directly across from the Ashbrooke Subdivision entrance we have proposed to eliminate the end Village lot backing up to Shelbourne Road in an effort to create a larger common area at the entrance. This lot will be made into additional open space. Together with this, we have moved the Village lots backing onto Shelbourne Road further east in an attempt to expand the buffer area between Shelbourne Road and the rear of these lots. This open space has been expanded from a 20 feet minimum width to a minimum width of 45 feet. In addition, we have proposed adding additional evergreens in the area between the proposed entrance and the south property line of the Ashbrooke Subdivision. In the northeast corner of the project abutting the Townlake subdivision, we have eliminated three Estate Series lots and also eliminated the interior landscaped island abutting the interior street. The lots in this area have been reconfigured to incorporate a large open space/tree save area abutting the Townlake subdivision. This tree save area will be incorporated into a common area with a mulched walking path and picnic tables for the residents of the community. In the southeast portion of the project in the Manor Series area, we have reconfigured three lots into the common areas interior to the project in an effort to obtain more open space and buffer area along the north property line abutting the Greentree Subdivision. The open space buffer area has been increased from a minimum width of 30 feet to a minimum width of 100 feet in this area. We feel that these changes to the site plan will help alleviate the concerns the Plan Commission and surrounding residents have with our community. I have enclosed copies of the original site plan filed in October of 1993, the site plan as presented to the Plan Commission in February of this year, and a copy of the revised site plan as we are now proposing it. In addition, I have enclosed enlarged details of each of the three areas in which we are proposing changes to our plan. Of course, none of the new changes which I have described would cause the new Linkside community to fail to meet anv of the requirements of the Subdivision Control Ordinance which are necessary for us to be entitled to plat approval. Also, none of the new changes would require us to seek a variance approval from the Plan Commission. Mr. David Cunningham March 30, 1994 Page 3 Please review the enclosed material. We would happy to meet with staff or members of the Plan Commission prior to the Plan Commission meeting if there are any additional suggestions that would help to improve our land plan. Please contact me at 595-2900 if you have any additional comments regarding the site plan. Sincerely, Christopher R. White Executive Vice President