HomeMy WebLinkAboutCorrespondence =- =C.P. Morgan November 16, 1988 The art of fine home building Mr. Charles Kiphart Department of Community Development City of Carmel 40 E. Main Carmel, IN 46032 Subject: Revised Lake Forest Cluster Housing Community Dear Mr. Kiphart: Pursuant to our meeting on November 15th regarding the revised Lake Forest site plan,this letter serves to confirm our verbal understanding that the Department of Community Development has reviewed the-revised-plan and suggests the following modifications: CoKcw+♦ Pity% 1) Provide a detail of the 116th Street improvements to include widening to three lanes and accel-decel lanes for both entryways. 2) Provide a stubbed street on the northwest corner of the property and delete the the existing stubs to the west and north. 3) Provide a commitment that The C. P. Morgan Co., Inc. will coordinate with The City of Carmel road improvement plan for 116th Street. 4) Provide for additional clustering of homes through minor site plan revisions which provide landscape easements. It is our understanding that, given the above mentioned additions, the staffs opinion is that Lake Forest fulfills the intent and purpose of the current cluster housing ordinance. Based upon this understanding, we are proceeding with revised engineering plans which will be submitted to your office November 28th, and will be presented to the Subdivision Committee December 6th. Sincerely, Mark W. Boyce Manager of Land Acquisition and Market Research MWB/km cc: Jim Nelson Wes Bucher 1980 E. 116th Street,Suite 125 Carmel,Indiana 46032 (317)848-4040 NELSON & FRANKENBERGER A PROFESSIONAL CORPORATION ATTORNEYS-AT-LAW 3021 EAST 98TH STREET JAMES J. NELSON SUITE 220 CHARLES D. FRANKENBERGER SUITEAPO LIS. INDIANA 46280 JEFFREY B. HIGGINS 317-844-0106 OF COUNSEL JANE B. MERRILL December 6 , 1988 Chuck Kiphart 40 East Main Street Carmel, IN 46032 • Dear Chuck: I represent C . P. Morgan Co. , Inc. relative to its Application for Primary Plat Approval for the Development Committee known as Lake Forest. As you know C. P. Morgan has been working diligently to revise its Development Plan to meet the stated concerns of the members of the Subdivision Committee. As of this date, revised plans have been filed but we have been unable to obtain approval of the revised plans from the various TAC members . In order to facilitate obtaining these approvals, yesterday I requested of Wes Bucher that we be given the opportunity to appear before the TAC Committee on December 21 , 1988. Due to the above, I respectfully request on behalf of C. P. Morgan Co. , Inc. , that this matter be continued by the Subdivision Committee from December 6, 1988 to January 3 , 1989 . In so requesting this continuance I was surprised that we were placed on the December 6th agenda, since we were unable to meet the deadlines for such meeting established in your letter of December 1 , 1988. I believe the additional time will provide us with the opportunity to be completely prepared for a presentation on January 3, 1989 . Thank you for your consideration in this matter. cgards, dOlir J . Nelson cc: C.P. Morgan Co. , Inc. PLEASE RETURN TO: Mr. Charles E. Kiphart Planning & Zoning Administrator City of Carmel 40 E. Main Street Carmel, IN 46032 PETITIONER TO FILL OUT & SEND COPIES TO TAC MEMBERS: Petitioners Name: C. f• Mo26AV Project Name: �.�ufoe.E3r PelnAQY Property Use: Type of Review: Date: /2-/- 88 Dear Mr. Kiphart: I have received and reviewed a location map and site/development plan and other needed supporting information for the above stated project, and make the following comments: (if additional comments attach seperate page) 1 . 5 rro co I).0 te, acor46 OAST* peop 'Or? t'Ve• 2. SHow Kour40INC; ANC TYI: fCQ.. cQa.S -S0cY' • 3. DRA'AJ a Foe //Git" rctl iS Ne"e17EZI 4. -j 5E& t el'E TNS 4-A.44°. int 56-67-494 r 5 .7bc' Na�Qow A p�"ACEN7 Tu c o-7- at? 5O P 6 BquF w,D� N OF Z3 7-5 13AfcEI,Y APell PAT& reit A 5:(„ , DePTN cF y, �IdE SAN✓J K�1 5. -rive wiDTr/ 5,1641A 3e 51, .5�1L was. ',AKE iT ts 6. AHO Nova5 5f/D414 .94 No c P56Z 71A1 30, PO, $0 7-1/ A4KES. 7. ✓ �VC.CS rats.' V J4u� f41�3t lot aeiVetsic_ sire F1 LL-, .ext 7- 13 1104 i lA4, FPO rt a'o t.. 8. 9. 10. I understand that the petitioner wishes to be included on the agenda for the Plan Commission/Board of Zoning Appeals meeting for the meeting. I have no problem with the Carmel Department of Community Development issuing a docket number and placing this project on the appropriate Commission/Board/ agenda for formal review. Sincerely, c1/4 4,4 cc rt Oft stN,u� iJ a ENtc 5 t,tlii‘Pae n� Qa.tid11 Pawt,Y/ PLEASE RETURN TO: Mr. Charles E. Kiphart Planning & Zoning Administrator City of Carmel 40 E. Main Street Carmel, IN 46032 PETITIONER TO FILL OUT & SEND COPIES TO TAC MEMBERS: Petitioners Name: 77e C• ✓J Revyaa Cc ,J"e Project Name: Lake ce //f' Property Use: Type of Review: ` Date: /� Z e) Dear Mr. Kiphart: I have received and reviewed a location map and site/development plan and other needed supporting information for the above stated project, and make the following comments: (if additional comments attach seperate page) 1. Nizt-Evz 732A1N Attar S 1^, O., R-{ FC,2 GAL/c 2. L�A i4 ". L 1�^4 S i I'- o FF i�/W y 3. 5,40..../ A(Z .. -t-o- ITSE Mo >.v�t�� s �, .LL ni p. Th - . •+abci 'PLA' '-' ( ' eTtk o� c TL T-4G c.Jw)s-rtzuc.T0•-1 `�iL.o.' v✓`tLL NI LD fc�uc� cAa� w,t� T i�,zv-a�••o A.00-+L 4. � s-� ��,F � .t x.,314" oN �iM6-,Z,c.4, 3 Hc,- 5. A ... 5. 01:F S t tY�SEr+t`^aT ��-tom.Z� —. - 2,A,w Ale c' C3 rt AC� , �CT�t�t I ( 'v' ' . S\�jsLO 1%.-: 7'2.i0- - APP¢nGot,s-jrza(-yea•J PL_A 6. 11 .eiJC2osy 5�zT<o-� C or-F%iTcr s .La a cca.T reve-pc•J 1/4"42.'4 7. 8. 9. 10. I understand that the petitioner wishes to be included on the agenda for the Plan Commission/Board of Zoning Appeals meeting for the meeting. I have no problem with the Carmel Department of Community Development issuing a docket number and placing this project on the appropriate Commission/Board/ agenda for formal review. Sincerely, (/-/ ei City of CCarmel Thomas E. Welch CITY ENGINEER Dorothy J.Hancock MAYOR December 2, 1988 Mr. Wes Bucher, Director Department of Community Development 40 East Main Street Carmel, Indiana 46032 Dear Mr. Bucher: This office has reviewed the proposed site development plan for Lake Forrest Subdivision, located on the north side of 116th Street, and have the following comments: 1. Off-Site Water (12" ) extended to east property line. 2 . Off-Site Sewer ( 18" ) continue North-South Interceptor extend to west property line. 3 . Possibility of oversizing 12" north and south. 4 . Need to run water line from 116th Street up Deer Park Lane to Purcell Lane. 5 . Sewer lateral for outlot. 6 . Need easement for sanitary on east side of Deer Park Lane between 116th Street and Lot 11. 7 . Need right-of-way for outlot. 8 . Accel and deccel between Deer Park Lane and Lake Forrest Park to be continuous , not tapered-full 12 ' lane. 9 . Relocate hydrant on Lot 131 to 500 ' (center of lot) . Extend water main to subdivision boundary. East end of Lake Point-add temporary hydrant on end of line (Lot 141) . 10 . Contact City' s Consulting Engineer, who is designing 116th Street project. 11 1st AVENUE,N.E. CARMEL,INDIANA 46032 317/846-7314 Approval of this project by this office will be contingent upon the above comments and approval of sewer availability by the Carmel Board of Public Works and Safety. Very Truly Yours , A0e-Cf.,A Randy D. Powell RDP/tic cc: Mark Boyce, C. P. Morgan Company Jack Southerland, Schneider Engineering 2 -_ - =C.P. Morgan jo -I?-,, CNI Ma W o. Inc. October 3, 1988 Charles E. Kiphart 1980 E.116th Street Department of Couuunity Development Suite 125 City of Carmel Carmel,Indiana 46032 1st Avenue Northeast (317)848-4040 Carmel, Indiana 46032 RE: Lake Forest Dear Mr. Kiphart: Following review and comment by the Technical Advisory Committee, we have incorporated all recommended modifications to the Lake Forest Project. These include: 1. The annexation petitions for Lake Forest are on the Carmel Board of Public Works and City Council agendas for October 1, 1988. 2. 40' half right-of-way will be grated on 116th Street and accel-decel lanes and passing blister will substantially exceed the ordinance requirements. 3. All utility easements are a minimum of 15' in width for Indiana Bell Telephone. 4. The covenants include provisions for no fencing in the common area except as approved by the Plan Commission and no buildings may encroach into the common areas or landscape easements. 5. The aforementioned covenants are enforceable by the Plan Commission and City of Carmel Staff. 6. American Aggregates has agreed to allow the C.P. Morgan Company to construct a 7' high berm within a 20' wide strip alond the eastern property line of Lake Forest. 7. Flood routing has been added. 8. We recommend to staff a maximum lot coverage percentage of 607 with impervious surfaces. Such surfaces as wood decks, spaced brick, etc. are not considered impervious. 9. We will file for variances to the sign ordinance after the primary plat is voted upon by the Plan Couuuission. This summary included all TAC comments received to date and fulfills all of the recommendations of your staff. If you have any questions or additional couuuents, please contact myself or Jack Southerland at Schneider Engineering. Sincerely, Mark W. Boyce Research and Land Development MB:dh cc: Jack Southerland =C.P. Morgan The art of fine home building November 30, 1988 Mr. Charles Kiphart DEPT.OF COMMUNITY DEVELOPMENT CITY OF CARMEL First Avenue, N.E. Carmel, IN 46032 Subject: Commitments for the Development of Lake Forest Dear Mr. Kiphart: Following is a summary of the proposed commitments for the development of Lake Forest Cluster Housing Community. • All homes in Lake Forest shall include brick exteriors to a height of eight feet (8') on three sides. • Lots 3, 4, 5, 99, 100, and 101 which face 116th Street shall include brick exteriors on four sides. • The C. P. Morgan Co., Inc. shall coordinate and cooperate with The City of Carmel on the improvements to 116th Street as described on the engineering plans of the primary plat. Upon staffs approval of these commitments, we will reduce these commitments to a recordable instrument which shall be recorded following primary plat approval. Sincerely, Mark W. Boyce MANAGER OF LAND DEVELOPMENT MWB/dhg cc: Wes Bucher Jim Nelson 1980 E. 116th Street,Suite 125 Carmel,Indiana 46032 (317)848-4040 • �$ Pfium, .as Klauameier&Gehrum " Consultants General Partners: 47 South Pennsylvania Street,9th Floor Indianapolis,IN 46204-3622 John E. Pflum,PE Telephone 317/636-1552 James P.Klausmeier,PE Telefax 317/636-1345 John E.Gehrum January 3, 1989 Mr. Mark Boyce C.P. Morgan Co., Inc. • 1980 E. 116th Street, Suite 125 Carmel, IN 46032 • Re: Proposed Lake Forest Dear Mr. Boyce: • This letter is in response to your recent request that we: * update the traffic counts along E. 116th Street near the proposed project, * review the conclusions and recommendations in my letter to you dated October 4, 1988, and • review the revised site plan with two rather than one proposed intersection with E. 116th Street. Update the Traffic Counts • The attached tabulation compares 1987 and 1988 traffic counts during the morning and evening peak hour periods. Note that the 1987 counts were conducted during a "normal" work and school week in January. The recent 1988 counts were conducted during a "holiday" week for some workers and all students in December. As a result, the "holiday" weekday counts are less than otherwise might be expected during a "normal" weekday. Review Conclusions and Recommendations The limited traffic count comparisons provide no evidence to suggest changes to my earlier conclusions and recommendations that: • * E. 116th Street be widened in the vicinity of the site to provide an exclusive eastbound left turn lane, * right-of-way be dedicated for the eventual widening of 116th Street, and * signalization at Lake Forest Parkway will not be warranted. Other Offices: • Cincinnati,OH Ft.Wright, KY Louisville,KY a d 88'sT TES 1TE )UNI OT :ET 68, E8 Nl=if ■� Pflum, Klausmeier&.Gehrum -�� Consultants Mr. Mark Boyce January 3, 1988 Page Two Review the Revised Site Plan A revised site plan has been reviewed which shows two rather than one intersection with 116th Street. The two proposed intersections are spaced approximately 550 feet apart (between centerlines). The two proposed intersections will require the reconstruction of approximately 1300 feet of 116th Street in order to: * install an exclusive eastbound left turn lane at each intersection, * install westbound acceleration and deceleration lanes at each intersection, • flatten the vertical profile of 116th Street to improve sight distances, and * eliminate four residential driveway intersections along 116th Street. Sum mary Recent traffic counts provide no evidence to suggest changes to my earlier conclusions and recommendations. The revised site plan with two rather than one intersection with 116th Street will result in additional lanes, lowered profile, and fewer residential driveways that will substantially increase the capability of 116th Street to safely accommodate the site generated traffic. Very truly yours, PFLUM, KLAUSM IER & GEI-IRUM CONSULTANTS James P. Klausmeier, P.E. Partner JPK/jh Attachment 1355/C-4/49 d 88ST LTC .MINI iI:ET E3: ED Nt+l PEAK HOUR TRAFFIC E. 116th Street, East of Gray Road Carmel, Indiana AM Peak Hour Jan. 1987* Dec. 1988** % Difference Westbound 620 524 - 15% Eastbound 420 295 - 30% Total 1040 819 - 21% PM Peak Hour Jan. 1987 Dec. 1988 % Difference Westbound 540 541 -- Eastbound 810 645 - 20% Total 1350 1186 - 12% * January 12, 13, 14, 1987 ** December 29,_1988 tr'd SSST TES LTE AQNI 8T :ET E8. EO kldf City ofCarmel Charles E. Kiphart PLANNING AND ZONING ADMINISTRATOR Dorothy J. Hancock MAYOR December 1, 1988 Mark Boyce C.P. Morgan 1980 E. 116th St. Carmel, IN 46032 RE: Lake Forest Primary Plat as amended Dear Mark: After staff review of above referenced project, we feel the following com- ments need to be made: 1. Petitioner has resubmitted primary plat and application for Lake ForesL subdivision. 2. Per agreement with DOCD staff, all plans were to be finalized and have final approval by TAC members by November 28, 1988 in order for plat to be ready for committee review. This did not take place. 3. Pay fee for review of revised plat, initial plat received, two reviews as per fee schedule. 4. Submitted amended plat dated 11/24/88 is incomplete per the following requirements of the Subdivision Regulations and the Cluster Housing Ordinance. a. We have received only one TAC response (Kent Ward) on amended plat, he has noted five conditions. b. Need two copies of plat without erosion control information. c. No date of submittal on amended plat. d. Need additional information on nodes in front of lots 20 through 23 and 85 through 88, show pavement layout, ownership, main- tenance, etc. e. Need drainage easement around entire perimeter of subdivision. f. Need utility and drainage easements within common areas? g. Show drainage arrows for facilities along 116th St. h. Designate road right-of-way line on plat for 116th St. i. Need sewer facility easements around Deer Park Lane. 40 EAST MAIN STREET CARMEL,INDIANA 46032 317/844.6433 Page 2 12/1/88 Lake Forest j . Need revised landscape plan. k. Need revised building elevations/architecture style. 1. Are there any changes to initial covenants per amended plan. m. Revised traffic study per amended plan, committee may request. n. Copy of revised preliminary drainage calculations. The agreement between DOCD staff and petitioner has not been complied with, staff feels that with the status of incomplete information and changes in the road system (change in road design entrances/exits, change in design of 116th St. ) and no final TAC approval of amended plat that the Committee at this time should not take final action on this submittal. Committee to make deci- sion on whatever changes made to plat will necessitate a new public hearing before the Plan Commission. Staff recommends plat be reviewed by TAC at regular meeting, then considered by Subdivision committee, then to Plan Commission. If you have further questions, please call me at 844-6433. Sincerel 40*49 /11.-1‘X;(---;(--1/7 — Charles E. Kiphart CEK/ck L John V. Schneider, P.E., L.S., Gary R. Kent, L.S. President Dennis Grumpp, L.S. Stephen M. Cooper, L.S. Brad DeReamer, L.S., Edward D. Giacoletti, L.S. Vice-President Bruce A. Nicholson, P.E. James M. Mulryan, L.S. Vincent J. Schneider, P.E., L.S. Richard G. Rayback, L.S. Retired Consultant SCHNEIDER ENGINEERING CORPORATION Alan B. Cleveland, L.S. Robert G. Horner, P.E. Civil Engineers-Land Surveyors-Land Planners December 5, 1988 Mr. Chuck Kiphart Department of Community Development 40 East Main Street Carmel, IN 46032 RE: Lake Forest Primary Plat Submission Dear Mr. Kiphart: As requested, the comments received from the office of the Hamilton County Surveyor have been addressed as follows: 1. NEED DRAINAGE SUMMARY FOR CALCULATIONS. See attached. 2. KEEP LAKES AT LEAST 15' OFF R/W. Waters edge shall be 15' or greater from any R/W line. In those areas where edge of water will be closer than 15' to R/W line, a retaining wall shall be required. See details. 3. SHOW AREAS TO BE MOUNDED, WILL NEED A DRAINAGE PLAN WORKED OUT FOR THE CONSTRUCTION PLANS. WILL NEED TO SHOW EASEMENT FOR MOUND ALONG EAST PROPERTY LINE ON AMERICAN AG. Added easement and mounding detail. Final drainage plan will be included with construction plans. 4. OFFSITE EASEMENT NEEDED FOR DRAINAGE ON AMERICAN AG. PROPERTY WHICH SHOULD BE RECORDED PRIOR TO APPROVAL OF CONSTRUCTION PLANS. See detail sheet. 5. NEED CROSS-SECTION OF OFFSITE SWALE ON CONSTRUCTION PLANS. See details. 3020 North Post Road, Indianapolis, Indiana 46226-6518 Telephone (317) 898-8282 Telecopier (317) 899-8010 P.O. Box 26068, Indianapolis, Indiana 46226-0068 The following are comments from the Hamilton County Soil Conservation Service. These were received by telephone from John South on December 1, 1988: 1. DRAINAGE EASEMENT ON EAST LINE WITH LANDSCAPE EASEMENT. See revised Primary Plat. 2. MOUNDS CROSS-SECTION. See revised Primary Plat. 3. DETAIL FOR RETAINING WALL AROUND NARROW' PADS, OR NO PONDS. See revised Primary Plat. 4. DETAIL ON DRAINAGE ALONG 116TH., ST FLOW ARROWS ON EAST ENTRY. See revised Primary Plat. 5. UNSUITABLE FILL FROM PONDS. (OK FOR STREET, SUBGRADES & PADS). Comments from the Carmel City Engineers Office and are followed by our responses: 1. OFF-SITE WATER (12") EXTENDED TO EAST PROPERTY LINE. See detail sheet. 2. OFF-SITE SEWER (18") CONTINUE NORTH-SOUTH INTERCEPTOR EXTEND TO WEST PROPERTY LINE. See detail sheet. 3. POSSIBILITY OF OVERSIZING 12" NORTH AND SOUTH. Will discuss at Technical Advisory meeting. 4. NEED TO RUN WATER LINE FROM 116TH STREET UP DEER PARK LANE TO PURCELL LANE. See revised Primary Plat. 5. SEWER LATERAL FOR OUTLOT. See revised Primary Plat. 6. NEED EASEMENT FOR SANITARY ON EAST SIDE OF DEER PARK LANE BETWEEN 116TH STREET AND LOT 11. See revised Primary Plat. 7. NEED RIGHT-OF-WAY FOR OUTLOT. See revised Primary Plat. 8. ACCEL AND DECCEL BETWEEN DEER PARK LANE AND LAKE FORREST PARK TO BE CONTINUOUS, NOT TAPERED-FULL 12' LANE. See revised Primary Plat. 9. RELOCATE HYDRANT ON LOT 131 TO 500' (CENTER OF LOT). EXTEND WATER MAIN TO SUBDIVISION BOUNDARY. EAST END OF LAKE POINT-ADD TEMPORARY HYDRANT ON END OF LINE (LOT 141). See revised Primary Plat. Added temporary hydrants at end of lines. 10. CONTACT CITY'S CONSULTING ENGINEER, WHO IS DESIGNING 116TH STREET PROJECT. Following are comments from your office and responses: 1. PETITIONER HAS RESUBMITTED PRIMARY PLAT AND APPLICATION FOR LAKE FOREST SUBDIVISION. 2. PER AGREEMENT WITH DOCD STAFF, ALL PLANS WERE TO BE FINALIZED AND HAVE FINAL APPROVAL BY TAC MEMBERS BY NOVEMBER 28, 1988 IN ORDER FOR PLAT TO BE READY FOR COMMITTEE REVIEW. THIS DID NOT TAKE PLACE. 3. PAY FEE FOR REVIEW OF REVISED PLAT, INITIAL PLAT RECEIVED, TWO REVIEWS AS PER FEE SCHEDULE. 4. SUBMITTED AMENDED PLAT DATED 11/24/88 IS INCOMPLETE PER THE FOLLOWING REQUIREMENTS OF THE SUBDIVISION REGULATIONS AND THE CLUSTER HOUSING ORDINANCE: A) WE HAVE RECEIVED ONLY ONE TAC RESPONSE (KENT WARD) ON AMENDED PLAT, HE HAS NOTED FIVE CONDITIONS. See other comments and responses by petitioner. B) NEED TWO COPIES OF PLAT WITHOUT EROSION CONTROL INFORMATION. Enclosed. C) NO DATE OF SUBMITTAL ON AMENDED PLAT. See revised Primary Plat. D) NEED ADDITIONAL INFORMATION ON NODES IN FRONT OF LOTS 20 THROUGH 23 AND 85 THROUGH 88, SHOW PAVEMENT LAYOUT, OWNERSHIP, MAINTENANCE, ETC. See revised Primary Plat. E) NEED DRAINAGE EASEMENT AROUND ENTIRE PERIMETER OF SUBDIVISION. See revised Primary Plat. F) NEED UTILITY AND DRAINAGE EASEMENTS WITHIN COMMON AREA. See revised Primary Plat. Provisions for maintenance of drainage facilities and landscaping will be part of covenants and restrictions in common areas. G) SHOW DRAINAGE ARROWS FOR FACILITIES ALONG 116TH STREET. See revised Primary Plat. H) DESIGNATE ROAD RIGHT-OF-WAY LINE ON PLAT FOR 116TH STREET. See revised Primary Plat. I) NEED SEWER FACILITY EASEMENTS AROUND DEER PARK LANE. See revised Primary Plat. I have responded to each of the T.A.C. members which provided me with written comments. The responses which required drawing revisions have been highlighted on the prints for your convenience. Should you have additional comments or questions, please call. Respectfully, Dennis L. Grumpp DLG/kmw Enclosures cc: Kent Ward, Hamilton County Surveyor John South, Hamilton County Soil Conservation Service Randy Powell, Carmel City Engineers Office Mark Boyce, C.P. Morgan Co., Inc. c:\letter\120588dg