HomeMy WebLinkAbout03080068.3PLE711
DIRECT VENT
6A5 SERV
II -7/5" J015T
cv
at Iq.2" O.G.
Q
O
UJ —j _
� O
1 C)/
at Iq.2" O.G.
O
O LL
O
D
Z
15-5 1/2
z
Framing Note
EXTERIOR PERIMETER HALLS
ARE CONSIDERED AS 4" HALLS;
EXTERIOR SHEATHING TO BE FLUSH
WITH OUTSIDE OF FOUNDATION
HALL OR L BLOCK
NOTE: 9' CEILINGS
ON FIRST FLOOR
NOTE: HORIZONTAL BLOGKIN& OF
SIZE EQUAL TO STUD FRAMING 15
REQUIRED at PLYWOOD JOINTS IN
THO STORY WALLS
FLOOR PLAN F
WITH BASEMENT
5GALE: 1/4" = I' 16-725F
E3 x— 2 6
cv
CRITICAL
Q
O
Q
II Wb" JOIST -_
J
at Iq.2" O.G.
O
Q
O
D
Z
15-5 1/2
I
N
Framing Note
EXTERIOR PERIMETER HALLS
ARE CONSIDERED AS 4" HALLS;
EXTERIOR SHEATHING TO BE FLUSH
WITH OUTSIDE OF FOUNDATION
HALL OR L BLOCK
NOTE: 9' CEILINGS
ON FIRST FLOOR
NOTE: HORIZONTAL BLOGKIN& OF
SIZE EQUAL TO STUD FRAMING 15
REQUIRED at PLYWOOD JOINTS IN
THO STORY WALLS
FLOOR PLAN F
WITH BASEMENT
5GALE: 1/4" = I' 16-725F
(z)
W
W
14 JULY 05
W
Q
Q
Q
�
Q
O
D
Z
c) -/s
�
0
(z)
W
W
14 JULY 05