Loading...
HomeMy WebLinkAbout03080068.3PLE711 DIRECT VENT 6A5 SERV II -7/5" J015T cv at Iq.2" O.G. Q O UJ —j _ � O 1 C)/ at Iq.2" O.G. O O LL O D Z 15-5 1/2 z Framing Note EXTERIOR PERIMETER HALLS ARE CONSIDERED AS 4" HALLS; EXTERIOR SHEATHING TO BE FLUSH WITH OUTSIDE OF FOUNDATION HALL OR L BLOCK NOTE: 9' CEILINGS ON FIRST FLOOR NOTE: HORIZONTAL BLOGKIN& OF SIZE EQUAL TO STUD FRAMING 15 REQUIRED at PLYWOOD JOINTS IN THO STORY WALLS FLOOR PLAN F WITH BASEMENT 5GALE: 1/4" = I' 16-725F E3 x— 2 6 cv CRITICAL Q O Q II Wb" JOIST -_ J at Iq.2" O.G. O Q O D Z 15-5 1/2 I N Framing Note EXTERIOR PERIMETER HALLS ARE CONSIDERED AS 4" HALLS; EXTERIOR SHEATHING TO BE FLUSH WITH OUTSIDE OF FOUNDATION HALL OR L BLOCK NOTE: 9' CEILINGS ON FIRST FLOOR NOTE: HORIZONTAL BLOGKIN& OF SIZE EQUAL TO STUD FRAMING 15 REQUIRED at PLYWOOD JOINTS IN THO STORY WALLS FLOOR PLAN F WITH BASEMENT 5GALE: 1/4" = I' 16-725F (z) W W 14 JULY 05 W Q Q Q � Q O D Z c) -/s � 0 (z) W W 14 JULY 05