Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
44-98 ADLS Blockbuster Large Format.7
10 s 0 W 0 u m 8 7 1 6 FINISH G E 2' WIDE x 4" THICK CONCRETE COLLAR T.C. ELEV. —__\ r-NEENAH R-3405 24* SQUAR 12' MINF'e- PRECAST- INDOT TYPE A INLET PIPE 02 STONE DRAINAGE STRUCTURE TYPE 1 BUILDING LINE CLEANOUT PLUG AND ADAPTER 1/8 STREET BEND (NO SCALE) NEENAH CASTING R-1976 i FINISH GRADE 6" PVC SEWER PIPE NOTE: CONNECTION TO CLEANOUT STRUCTURE TO BE WITHIN 3.0' (THREE FEET) OF THE FOUNDATION WALL. CLEANOUT SCHEMATIC GREATER THAN 5' (1) LESS THAN 5' (2) EDGE OF PAVEMENT, CURB GUTTER OR SIMILAR STRUCTURE BC- OUTSIDE DIAMETER D - INSIDE DIAMETER Nc d MASL1�F8ELOwl PIPE (1) REGULAR BACKFILL NOTE: ALL BEDDING do INITIAL BACKFILL SHAD, BE INSTALLED IN 6 TO 12' BALANCED LIFTS A MIN. 9' CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE 08" BORROW OR EQUIV. GRANULAR MATERIAL COMPACTED TO 95X STANNS D PROCTOR DE (NO SCALE) A $ 1.25 Bc (MIN.) T 5 1 4 1 3 1 2 1 1 (2) "B" BORROW OR EQUIV. 8 COMPACTED`CTMTO 95X -�_ STANDARD PROCTOR DENSITY E BEDDING SECTION RCP PIPE (NO SCALE) d D d MIN. 27 do SMALLER 30 TO 80 660 do LARGER PLAN NOTES O DRAINAGE STRUCTURE TYPE 1 RIM ELEV, 820.50 INVERT ELEV, 818.50 Q 10' OF 12' RCP AT LOX Q3 CONNECT 12' RCP TO EXISTING STRUCTURE AT 818.4± ® CONNECT BUILDING SANITARY LATERAL TO EXISTING LATERAL, COORDINATE CONNECTION WITH PLUMBING DRAWINGS AND ACTUAL L❑CATION OF LATERAL, ADJUST AS REQUIRED. PROVIDE 85' OF 6' PVC. O CLEANOUT © CONNECT BUILDING WATER SERVICE LINE TO EXISTING WATER MAIN. COORDINATE CONNECTION WITH PLUMBING DRAWINGS AND ACTUAL LOCATION OF WATER MAIN. ADJUST AS REQUIRED• PROVIDE 85' OF 1' COPPER. PROVIDE CONNECTION TO MAIN AS APPROVED BY WATER COMPANY, GENERAL NOTES 1. THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES. 2. PROVIDE THRUST BLOCKS FOR ALL WATER LINE BENDS AND TEES, INCLUDING TAP CONNECTION• 3, CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR DOMESTIC SERVICE, CONNECT TO BUILDING DOMESTIC LINE. COORDINATE WITH PLUMBING DRAWINGS. 4. COORDINATE LOCATION OF ELECTRICAL AND TELEPHONE LINES WITH LOCAL UTILITES AND ELECTRICAL DRAWINGS. 5. COORDINATE LOCATION AND SIZE OF GAS SERVICE CONNECTION AND INSTALLATION OF SERVICE LINE AND METER WITH GAS COMPANY AND MECHANICAL DRAWINGS. 6. COORDINATE LOCATIONS AND CONNECTIONS OF DOWNSPOUTS WITH ARCHITECTURAL DRAWINGS. 7. VERIFY EXISTING INVERTS OF STORM SEWER AND SANITARY SEWER, ADJUST INVERTS AS REQUIRED. DOCUMENT ANY CHANGES, 8, MAINTAIN 10' CLEARANCE BETWEEN SANITARY LATERAL LINE AND DOMESTIC LINE SERVICE. 9. FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO DOMESTIC LINE INSTALLATION AND SANITARY LATERAL INSTALLATION. SCALE 1" = 30' sHM NO.