Loading...
HomeMy WebLinkAbout44-98 ADLS Blockbuster Large Format.110 I m G 0 U) T m IQ a" 0 31 GJ I STEEL COLUMN (SEE FRAMING PLAN) GONG. MASONRY AN;� FACE BRICK WALL 0 ALUM I NUM 5TORE9RONT 5Y5TEM LINE OF AWNING (ABOVE) D C 12" SPLIT -FACED CONCRETE MA50NRY GONG. MASONRY AND FACE BRICK WALL 3 TON HVAC i RTU --- ---- ---- GJ 6" 20 6A. METAL STUD AND FACE BRICK WALL ALUMINUM � STOREFRONT 5Y5TEM -------------- - ------ ---- 20'-0" 0 STEEL COLUMN (SEE FRAMING PLAN) 12" SPLIT -FADED CONCRETE MASONRY GA5 METER 7— v z4" GONG SLAB OVER 6 MIL VAPOR BARRIER ON 4" MIN. C -ANULAR FILL f 00'-0 TOP Of 5LAB 6" 20 6A. METAL STUD ALUMINUM - AND FACE BRICK WALL 1 STOREFRONT 5Y5. 24'-0' 3 TON HVAC RTU GJ 3 STEEL COLUMN (SEE FRAMING PLAN) '-8 15'-70 1 _ � 4'-10" 15'-7" o J------ .. 20'-0" 20'-0" LINE OF BULKHEAD (ABOVE) LINE OF AWNINGS a(ABOVE) 4 v LINE OF AWNING (ABOVE) 6" 20 6A. METAL STUD AND FACE BRICK WALL ALUMINUM STOREFRONT SYS. W-4" 51 16 FLOOR PLAN 50ALE: Va" = P-OII GENERAL NOTES I. ALL DEMENSION5 SHOWN PERTAINING TO EXI5TIN6 CONDITIONS SHALL BE VERIFIED IN THE FIELD. 2. IN THE CASE OF ANY DISCREPENCIES BETWEEN THE DRAWI1465 AND THE EXI5TIN6 CONDITION5, THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY. DOOR 50HEDULE # NEW COLUMN LINE 2 DOOR MATERIAL FRAME MATERIAL EXI5TING WALL WITH NEW FACE BRICK +ice •+• NEH METAL 5TUD AND FACE BRICK HALL DOOR DOOR 51 Z o RECE55ED METAL HALIDE CANOPY LIGHT HARDWARE FI EV. REMARKS HDL. ALUM. HDL. ALUM. ABOVE. RUN TO EXISTING TENANT PANEL METAL 5TRFRT. METAL 5TRFRT. 24" X 24" CANOPY ACCESS HATCH GJ GONG. SLAB CONTROL JOINT 1 3'-0" X 7'-0" X 1 3/4" os, • • 1 A 2 3'-O" X 7'-0" X 1 3/4" is, • 2 B HARDWARE SET #1 HARDWARE SET #2 1 1/2 PR. HI N6E5 BY 1 1/2 PR. HI N&E5 BY DOOR MANUFACTURER DOOR MANUFACTURER I OL05ER - g0" I OL05ER - g0' I SET WEATHERSTRIP I SET WEATHERSTRIP _ _ ]THRESHOLD ITHRE75HOLD 4 4 1 DRIP GAP i- j- 1 5ECURITY BAR NOTE: ALL EXTERIOR DOOR LOCKS TO BE IN ACCORDANCE WITH IgGI ►BG AND ALL HARDWARE SHALL MEET REG UIREMENT5 ELEVATION "A" ELEVATION "B" OF THE AMERICANS WITH P15ABILITIES ACT. 24'-0' 3 TON HVAC RTU GJ 3 STEEL COLUMN (SEE FRAMING PLAN) '-8 15'-70 1 _ � 4'-10" 15'-7" o J------ .. 20'-0" 20'-0" LINE OF BULKHEAD (ABOVE) LINE OF AWNINGS a(ABOVE) 4 v LINE OF AWNING (ABOVE) 6" 20 6A. METAL STUD AND FACE BRICK WALL ALUMINUM STOREFRONT SYS. W-4" 51 16 FLOOR PLAN 50ALE: Va" = P-OII GENERAL NOTES I. ALL DEMENSION5 SHOWN PERTAINING TO EXI5TIN6 CONDITIONS SHALL BE VERIFIED IN THE FIELD. 2. IN THE CASE OF ANY DISCREPENCIES BETWEEN THE DRAWI1465 AND THE EXI5TIN6 CONDITION5, THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY. � QL AR19400124 STATE OF Tv` , G pCH IT�E CERTIFIED BYI LEGEND # NEW COLUMN LINE 2 EXISTING WALL TO REMAIN 3 EXI5TING WALL WITH NEW FACE BRICK +ice •+• NEH METAL 5TUD AND FACE BRICK HALL BIRDM AGENCY SL NEA MASONRY WALL o RECE55ED METAL HALIDE CANOPY LIGHT FIXTURE. WIRE TO EXI5TING CANOPY LIGHT CIRGUIT5 AND HOUSE PANEL. REVISIONS JUNCTION BOX FOR 516NA&E IN CANOPY f ---•----------- -- f ABOVE. RUN TO EXISTING TENANT PANEL AND TIME CLOCK. FILE - WE -TH > 24" X 24" CANOPY ACCESS HATCH GJ GONG. SLAB CONTROL JOINT EJ MA50NRY WALL EXPAN51 ON JOINT os, DOWNSPOUT LOCATION � QL AR19400124 STATE OF Tv` , G pCH IT�E CERTIFIED BYI PROJECT NO SOa7 DRAWM REVEW MAY 4, 1448 2 f 3 f < f BIRDM AGENCY SL MAY 4, IQGB REVISIONS ----- --------------------------------- 3-------------------------•---------------- --- -------------------------------------------------- f ---•----------- -- f FILE - WE -TH g8rW-4 5✓4ft 09,j PLOT SGItP 1 ve " 1'-C PROJECT NO SOa7