Loading...
HomeMy WebLinkAboutMillennium Contractors/Eng/CO #1/26,704.90/Multi Use Path Along Ditch RoadCity of Carmel Project 16 -ENG -20 Multi Use Path along Ditch Road CHANGE ORDER #1 Extra work for Subgrade Treatment for new multi -use path. Contract Price prior to this Change Order ------------------------------------------------------------------------------------------ Contract Price will be increased/decreased by this Change Order ------------------------------------------------------------------------------------------. New Contract Price including this Change Order ------------------------------------------------------------------------------------- $1,205,628.00 $26,704.90 $1,232,332.90 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $1,205,628.00 $1,205,628.00 N/A C01 $26,704.90 $1,232,332.90 2.22% CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 1 DATE: 6/28/2017 Millennium Contractors PROJECT NAME: Ditch Road Path 1401 South Holt Road CITY REQ. NO.: Indianapolis, IN 46241 CITY PO NO.: 100284 ATTN: Andrew Closser CITY PO DATE: April 5, 2017 _ You are directed to snake the following changes in this Contract: I. Where subgrade is not suitable to construct the trail, remove unsuitable material and install geogrid with No. 53 compacted aggregate. ITEM 5 - Excavation, Common 21 - Compacted Aggregate No. 53 Base 49 - Geogrid for Subgrade Stabilization SCHEDULED ADJUSTMENT AMOUNT (+) OR (-) DAYS $15,183.00 + 7 Day 56,575.40 + 7 Day $4,946.50 + 7 Day The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,205,628.00 Contract Price will be increased/decreased by this Change Order $ 26 704.90 New Contract Price including this Change Order $ 1,232,332.90 Contract Time Prior to this Change Order 100 Days 7/14/2017 Completion Date � Net increased/deed-resulting from this Change Order 14 Days Current Contract Time including this Change Order 114 Days 7/28/2017 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended: USI Consultants, Inc. ENGINEER 8415 East 56` Street Indianapolis, IN 46216 City/State/Zip By: Phone: 3 1-7-Ycf f- 3 7 sl Date: (0/V- 13 Zol The Above Changes Are Accepted: Millennium Contractors CONTRACTOR 1401 South Holt Road Indianapolis, IN 46241 Cit tate/Zip 133t Phone: 3 07 S - rr - I Date: (e I ag I n Approved: Treasurer Date: 1 P Ed, a � ar USI Consultants, Inc. 4W1W [J Change Order Details c-onsultants Ditch Road Path Description: City of Carmel Project No. 16 -ENG -20 Multi Use Path Along Ditch Road Change Order: 1 Date Created: 06/28/2017 Status: Pending Approval Date Approved: Type: Changed Conditions Summary: Subgrade Treatment for Trail Subgrade Change Order Description: The subgrade for the path on Ditch Road was proofrolled, and extra work will be required from STA 25+00 to the South (BOP). Geogrid for the area from the first drive south, and 6" to 12" of undercutting from the 5 Aces drive to STA 25+00 just north of the two structures, along with geogrid and No. 53 compacted aggregate. This is an unforeseen site condition, and will be completed using existing pay items with the exception of a new item for geogrid. Awarded Project Amount: $1,205,628.00 Authorized Project Amount: $1,205,628.00 Change Order Amount: $26,704.90 Revised Project Amount: $1,232,332,90 Increases/Decreases Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount Section: 1 - Default Section 5 Ditch Rd Path 5 CYS $70.000 960.00 $67,200.00 216.90 $15,183.00 1,176.90 $82,383.00 EXCAVATION, COMMON Reason: Stabilize Subgrade for Trail 21 Ditch Rd Path 21 TON COMPACTED AGGREGATE NO. 53 BASE Reason: Stabilize Subgrade for Trail (2 Items) $42.340 1,940.00 $82,139.60 155.30 $6,575.40 2,095.30 $88,715.00 Totals $149,339.60 $21,758.40 $171,098.00 Change Order Details: Ditch Road Path Page 1 of 2 06/28/2017 New Items Line Number item Section: 1 • Default Section 0920 Ditch Road Path 92 Geogrid for Subgrade Treatment Reason: Stabilize Subgrade for Trail (1 Item) Time Limits "Type Original Deadline Completion Date 07/14/2017 Substantial Completion Reason: Additional Work Added (1 Tlnae Limit) Unit Pending Quantity Unit Price SYS 11522.00 $3.250 Total: Authorized Deadline 07/14/2017 This change order is approved for construction, Dollar Amount $4,946.50 +54,946.50 Pending'Extension Pending Deadline! 14 Days 07/28/2017 20 i v Scott Dick - USI Consultants Inc. Date & "'N. (a eZ3 -71911% Millennium Co actors, LLC Date City of Carmel Date Change Order Details: Ditch Road Path Page 2 of 2 07/05/2017