HomeMy WebLinkAboutRieth-Riley Construction, Inc/Eng/CO #4/11,656.10/Spring Mill Road Reconstruction (#16-SW-07)City of Carmel Project 16 -SW -07 Spring Mill Road Reconstruction DCS' CHANGE ORDER #4 Revised Pedestrian Handrail Contract Price prior to this Change Order $8,751,597.56 Contract Price will be increased by this Change Order $11,656.10 New Contract Price including this Change Order $8,763,253.66 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $8,592,091.16 $8,592,091.16 N/A C01 (-333.18) $8,591,757.98 -0.004% CO2 $36,031.35 $8,627,789.33 0.42% CO3 $123,808.23 $8,751,597.56 1.86% C04 $11,656.00 $8,763,253.66 1.99% Page 1 of 2 CITY OF CARMEL TO: Lucas Clark CONTRACT CHANGE ORDER NO.: 4 Rieth-Riley Construction Co., Inc. DATE: 6/2/2017 P.O. Box 276 PROJECT NAME: Spring Mill Road Reconstruction / 1751 W. Minnesota Street Indianapolis, IN 46221 Project #16 -SW -07 CITY REQ. NO.: CITY PO NO.: 100354 CITY PO DATE: 4/13/2017 I. You are directed to make the following changes in this Contract: *All additional work associated with the documents referenced below. *This Change Order will delete Item #165 (-$6960.00) and create two new items, ITEM #216 — REVISED PEDESTRIAN HANDRAIL, Unit of pay for this item will be LFT; ITEM 9217 — CANCELLATION CHARGE (Original Handrail Design), Unit of pay for this item will be LS. II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: *Change Proposal as provided by Rieth-Riley Construction Co., Inc. on 5/15/2017. *Change Order 4 QTY Adjustments Breakdown The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 8,751,597.56 Contract Price will be increased/dec-reased by this Change Order $ 11,656.10 New Contract Price including this Change Order $ 8,763,253.66 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. AR -1 (T Page 2 of 2 The Above Changes Are Recommended: United Consulting ENGINEER 1625 N. Post Road Address Indianapolis, IN 46219 City/State/Zip B�� Phone: 3�--rty-sssz Date: 611sI/7 The Above Changes Are Accepted: Rieth-Riley CONTRACTOR 1751 W. Minnesota Street Address Indianapolis, 46206 Date: Approved: Lori W AT '&, Christine S. PAuley, Clerk - Treasurer m Ka an, P.E. City Engineer Date: �A.lf / �/ IETH! May 15, 2017 Bret Smiley United Consulting Construction Manager 1625 N. Post Road Indianapolis, IN 46219 ZLEY CONSTRUCTION CO., INC. 100% Quality • 100% Employee Owned • Over 100 Years RE: Spring Mill Road Improvements City of Carmel Project No. 16 -SW -07 Rieth-Riley Project No. 3200671 Dear Mr. Smiley, SENT VIA ELECTRONIC MAIL ONLY: Bret.Smiley@ucindy.com Pursuant to the revision of the handrail, Rieth-Riley Construction is requesting the following two additional pay items be added to the contract. Item Description EWA-1 Revised Pedestrian Handrail EWA-2 Cancellation Charge Unit Price Unit Qty Total $312.95 LFT 58 $18,151.10 $465.00 LS 1 $465.00 Total $18,616.10 The approximate cost of this adjustment based on unit prices is $18,151.10. A detailed breakdown of this pricing is attached on the following pages. Please call with any questions. Thanks .4., 1 s crag Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Eric Holmes Mike Jaskela It P.O. Box 276 •1751 W. Minnesota St. •Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com Lucas Clark From: Spencer Storie <spencer.storie@specialtiescompany.com> Sent: Tuesday, May 09, 2017 1:34 PM To: Lucas Clark Subject: Tagged: Re: RE: Change Proposal - Handrail Revision Importance: Low Follow Up Flag: Follow up Flag Status: Flagged Lucas, Please find below our breakdown of pricing for the most recent cost proposal for the Hand Rail Change Order on the Spring Mill Road Reconstruction Project. The information below is an indication of our costs for the requested Hand Rail on the Project and is the most detailed we can be on the requested breakdown. The material costs are reflective of new fabrication and black powder coating of the Hand Rail as outlined in the City of Carmel Standard Drawings for the Hand Rail. If you have any questions, concerns or need anything further, please let me know. Thank you for all of your help, Lucas. Materials: $11,895.00 58.0 LFT of City of Carmel Standard Drawing Hand Rail (including Black Powder Coated finish) Labor: $1,377.60 Foreman (1) - 8 HRS @ $53.75/HR Teamster (1) - 8 HRS @ $43.25/HR Laborers (2) - 16 HRS @ $37.60/HR Equipment: $1,380.00 Foreman Truck (1) - 8 HRS Semi Truck (1) - 8 HRS Semi Trailer (1) - 8 HRS Generator (1) - 8 HRS Shown as Mark -Ups: o Materials (12/0): $1,427.40 supporting backup Labor (20%): $275.52 for the $16,501.00 Equipment (12%): $165.60 Price. Total Change Order Amount = $16,521.12 Total Quoted Change Order Amount = $16,501.00 ($284.50/LFT @ 58 LFT) Spencer Storie 9350 East 30th Street Indianapolis, IN 46229 Lucas Clark From: Spencer Storie <spencer.storie@specialtiescompany.com> Sent: Wednesday, May 10, 2017 2:03 PM To: Lucas Clark Subject: Re: Tagged: Fwd: FW: FW: FW: FW: Tagged: Fwd: FW: City of Carmel Railing Project Importance: Low Lucas, Total Change Order Amount = $16,521.12 - This is the ACTUAL amount if you added up all of the costs I showed in the breakdown for our materials, equipment, labor and mark-ups. Total Quoted Change Order Amount = $16,501.00 ($284.50/LFT @ 58 LFT) - This is the cost that we bid to them on our proposal. I just wanted to show the cost we actual quoted to them was below the actual allowable rate. Hope this helps. Please let me know if you need anything else. Spencer Storie 9350 East 30th Street Indianapolis, IN 46229 P: (317)594-0291 F: (317)594-0271 C: (317)450-5407 On Wed, May 10, 2017 at 1:56 PM, Lucas Clark <lclark ,rieth-riley.com> wrote: I'll take a swing with what we have here and see what we end up with. One last thing before I put this all together. At the bottom of your breakdown email you have a $16,521.12 number and a $16,501.00 number. Are am I missing here? Total Change Order Amount = $16,521.12 Total Quoted Change Order Amount = $16,501.00 ($284.50/LFT @ 58 LFT) CoxsrrnaXWN M. /Na Lucas Clark A01 -Ir Afa ly- 1751 west FrStreet tncia�pdIN 462�, IN 46221 Mark (317) 6345561 ext 21M Mobile (317) 775-8426 kimk@viedwieV.com www.rkdwisy.com Cell: 317-775-8426 ( fETH RILEY 100% Employee Owned From: Spencer Storie [mailto:spencer.storie@specialtiescompany.com] Sent: Wednesday, May 10, 2017 11:54 AM To: Lucas Clark <Iclark@rieth-riley.com> Subject: Tagged: Fwd: FW: FW: FW: FW: Tagged: Fwd: FW: City of Carmel Railing Project Importance: Low Lucas, They never actually sent me a price quote for the railing, just an email with the prices per LFT. However, below is the email received from our supplier for the materials to install the railing on the Spring Mill Road Project. I also included a few dollars on my breakdown to you for the grout which will be required for the core drilled holes. If you have any questions or need any further information, please let me know. I hope this helps. Thank you as always for your assistance, Lucas. Spencer Storie 9350 East 30th Street Indianapolis, IN 46229 ii P: (317)594-0291 F: (317)594-0271 C: (317)450-5407 ---------- Forwarded message ---------- From: Roy McDaniel <Roygphdrew.com> Date: Thu, Mar 16, 2017 at 8:48 AM Subject: FW: FW: FW: FW: Tagged: Fwd: FW: City of Carmel Railing Project To: Spencer Storie <spencer. storieAspecialtiescompan .com> Spencer, The price to furnish all new material for the 58' of 9 -line pipe handrail(Galy. & Powder Coate t=nj The price to modify the existing (City of Carmel) panels, remove the existing powder coating and recoat is $182.00/lf. If you have any questions please let me know. Thanks, Roy McDaniel P. H. Drew, Inc. 2450 N. Raceway Road Indianapolis, IN 46234 317-297-5152 ext. 311 9 RAILING NOTES 1) HANDRAIL MATERIALS AND WORK SPECIFICATIONS SHALL BE IN ACCORDANCE WITH THE MOST CURRENT VERSION OF INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND SUPPLEMENTAL SPECIFICATIONS UNLESS OTHERWISE NOTED. 2) ALL PIPE MATERIAL SHALL BE SCHEDULE 40, ASTM A53, GR. B. 3) HANDRAILS SHALL BE GALVANIZED STEEL WITH PRIMER AND BLACK POWDER COATING MATERIALS PER TECHNICAL SPECIFICATIONS. 4) FOOTING AND POST EMBEDMENT TO BE DESIGNED BY THE DESIGNER. THE USE OF THE BASE PLATE/DROP-IN ANCHOR OPTION IS ONLY PERMITTED WHEN EMBEDDING THE POST IS NOT FEASIBLE. THE USE OF THE BASE PLATE/DROP-IN ANCHOR OPTION MAY BE APPROVED BY THE ENGINEER. 1 1/2" SCH. 40 (TYP.) 42" (MIN.) TYP. RAILS FIELD ADJUST MEASUREMENTS TO FIT CONTOURS AND SITE CONDITIONS 72" (TYP.) (MAX.) (SEE NOTE 4) NO SCALE 2 1/2" SCH. 40 (TYP.) 5 1/4" 0.C.(MAX.) TYP. 3/16" POST 4 CLR. (MAX.) 10" x 5" x 1" (SEE DETAIL SHT 10-38B) J" BOLT WITH DR❑P-IN ANCHOR (SEE NOTE 4) Paqe 1 of 5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07 Change Order 84 - Quantity Adjustments ITEM NO. DESCRIPTION UNIT Original Quantity UNIT PRICE Original Total Construction Construction Change Kl Qtys. Change 424tys. New Total QuantityI New Total Dollar Amount 16 -ENG -52 QUANTITIES 1 CONSTRUCTION ENGINEERING LS 1 $160,203.01 $160,203.01 0.113 1.03 $164,290.01 2 MOBILIZATION AND DEMOBILIZATION LS 1 $211,891.55 $211,891.55 1.00 $211,891.55 3 CLEARING RIGHTOF WAY LS 1 $295,223.93 $295,223.93 1.00 $295,223.93 4 PAVEMENT REMOVAL SYS 459 $14.60 $6,701.40 459.00 $6,701.40 5 CENTER CURB, CONCRETE, REMOVE SYS 34 $42.39 $1,441.26 34.00 $1,441.16 6 CURB, CONCRETE, REMOVE LFT 77 $7.82 $602.14 77.00 $602.14 7 CURB AND GUTTER, REMOVE LFT 2,914 $6.05 $17,629.70 2,914.00 $17,629.70 8 PIPE ABANDON GROUT AND FILL EACH 5 $438.20 $2,191.00 5.00 $2,191.00 9 SIDEWALK CONCRETE, REMOVE SYS 223 $16.70 $3,724.10 223.00 $3,724.10 10 INLET, REMOVE EACH 4 $607.04 $21428.16 4.00 $1,428.16 11 FENCE, CHAIN. LINK, REMOVE LFT 492 $4.50 $2,214.00 492.00 $2,214.00 Sla GUARDRAIL, REMOVE LFT 735 $6.50 $4,777.50 735.00 $4,777.50 116 BRIDGE RAILING, REMOVE LFT 248 $18.50 $4,588.00 248.00 $4,588.00 12 MANHOLE, REMOVE EACH 1 $898.30 $898.30 1.00 $898.30 13 CURB TURNOUT, REMOVE EACH 1 $84.36 $84.36 1.00 $84.36 14 CONCRETE WALL, REMOVE LFT 170 $49.07 $8,341.90 170.00 $8,341.90 15 PIPE, REMOVE LFT 832 $38.16 $31,749.12 832.00 $31,749.12 16 FENCE, FARM FIELD, REMOVE LFT 1 1,662 1 $2.75 $4,570.50 1,662.00 $4,570.50 17 EXCAVATION, COMMON CYS 24,762 $5.81 $143,867.22 24,762.00 $143,867.22 18 BORROW CYS 15,953 $0.01 $159.53 15,953.00 $159.53 19 SEDIMENT, REMOVE CYS 63 $38.62 $2,433.06 63.00 $2,433.06 20 TEMPORARY CHECK DAM, REVETMENT RIPRAP TON 8 $57.15 $457.20 8.00 $457.20 21 TEMPORARY INLET PROTECTION EACH 154 $65.00 $10,010.00 154.00 $10,010.00 22 TEMPORARY MULCH TON 29 $450.00 $13,050.00 29.00 $13,050.00 23 TEMPORARY SILT FENCE LFT 12,404 $1.95 $24,187.80 12.404.00 $24,187.80 24 NO. 2 STONE TON 400 $25.25 $10,100.00 400.00 $30,100.00 25 TEMPORARY GEOTEXTILE SYS 940 1 $2.79 $2,622.60 910.00 $2,621.60 26 TEMPORARY SEED MIXTURE LBS 1,740 $0.25 5435.00 1,240.00 $435.00 27 SUBGRADE TREATMENT, TYPE II SYS 960 $22.67 $21,763.20 ,. UUI 925.00 $20,969.75 28 SUBGRADE TREATMENT, TYPE IB SYS 53,215 $6.03 $320,886.45 899.00 54,114.00 $326,307.42 29 STRUCTURE BACKFILL, TYPE I CYS 13,538 $25.66 $347,385.08 3.t1c1 13,541.00 $347,462.06 30 DRYING SOILS FOR EMBANKMENT TON 655 $125.00 $81,875.00 655.00 $81,875.00 31 COMPACTED AGGREGATE NO. 53 BASE TON 3,062 $27.60 $84,511.20 3,015.00 $83,214.00 32 WIDENING WITH HMA, TYPE C TON 11 $183.09 $2,013.99 11.00 $2,013.99 33 MILLING, ASPHALT, 11/2 IN. SYS 381 $12.00 $4,572.00 381.00 $4,572.00 34 MILLING, ASPHALT SYS 488 1 $12.00 $5,856.00 488.00 $5,856.00 36 HMA SURFACE, TYPE C TONS 3,206 $58.59 $187,839.54 48.00 3,254.00 $190,651.86 37 HMA INTERMEDIATE, TYPE C TONS 5,187 $51.56 $267,441.72 79.00 5,266.00 $271,514.96 38 HMA BASE, TYPE C TONS 14,518 549.54 $719,22172 272.00 14,790.00 $732,696.60 39 MMA INTERMEDIATE, OG, TYPE C TONS 6,567 $50.09 $328,941.03 57.00 6,624.00 $331,796.16 40 HMA FOR TEMPORARY PAVEMENT, C (UNDISTRIBUTED) TON 500 $103.00 $51,500.00 500.00 $51,500.00 41 ASPHALT FOR TACK COAT TON 29 $0.01 $0.29 15.00 11.00 $0.44 41 PCCP, 7 IN. SYS 241 $63.87 $15,39267 241.00 $15,392.67 43 GUARDRAIL, WOOD BEAM LFT 725 1 $314.00 $227,650.00 725.00 $227,650.00 43a GUARDRAIL, BURIED END LFT 8 $8,600.00 $68,800.00 8.00 $68,800.00 44 HMA FOR SIDEWALK TON 2,243 $79.93 $179,282.99 2,205.00 $176,245.65 45 SIDEWALK, CONCRETE SYS 391 $43.80 $17,125.80 391.00 $17,125.80 46 CURB RAMP, CONCRETE SYS 440 $155.70 $68,508.00 131, OU 579.00 $90,150.30 47 CURB, INTEGRAL CONCRETE LFT 245 $33.04 $8,094.80 245.00 $8,094.80 48 CURB AND GUTTER, CONCRETE, TYPE It LFT 18,824 $16.04 $301,936.96 18,824.00 $301,936.96 49 CURB AND GUTTER, CONCRETE, TYPE III LFT 13,729 $15.01 $206,072.29 13,666.00 $205,126.66 50 CENTER CURB, O CONCRETE SYS 125 $181.22 $22,652.50 125.00 $22,652.50 51 CURB, TURNOUT EACH 2 $1,183.91 $2,367.82 2.00 $2,367.82 52 CURBANDGUTTER, ROLL CURB LFT 308 $29.50 $9,086.00 308.00 $9,086.00 53 HMA FOR APPROACHES, TYPE C TON 1 681 1 $89.44 $60,908.64 119. 00 800.00 1 $71,552.00 Paqe 2 of 5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07 Change Order N4 - Quantity Adjustments ITEM NO. DESCRIPTION UNIT Original Quantity UNIT PRICE Original Total Construction construction Change bl Qty s. Change #2 Qty'. New Total Own New Total Dollar Amount 54 PCCP FOR APPROACHES, 6 IN. SYS 574 $52.72 $30,261.28 537.OD $28,310.64 55 PCCP FOR APPROACHES, 9 IN. SYS 412 $64.54 $26,590.48 412.00 $26,590.48 56 MAILBOX ASSEMBLY, SINGLE RESET EACH 13 $185.00 $2,405.00 13.00 $2,405.00 57 GEOTEXTILES SYS 68 $1.18 $80.24 11 Ou 1.01) 80.00 $94.40 58 RIPRAP, REVETMENT TON 28 $85.06 $2,381.68 40n 1.00 33.00 $2,806.98 59 MOBILIZATION AND DEMOBILIZATION FOR SEEDING EACH 7 $50.00 $350.00 7.00 $350.00 60 EROSION CONTROL BLANKET SYS 1,016 $1.17 $1,188.72 1,016.00 $1,188.72 61 WATER kGAL 102 $1.00 $102.00 102.OD $102.00 62 SODDING, NURSERY SYS 28,063 $3.25 $91,204.75 28,063.00 $91,204.75 63 IRRIGATION CONTROLLER BOX EACH 1 $8,500.00 $8,500.00 1.00 $8,500.00 64 FIELD OFFICE, 8 MOS 15 $2,286.99 $34,304.85 15.00 $34,304.85 65 TIMBER CURB LFT 124 $196.00 $24,304.00 124.00 $24,304.00 66 PIPE, TYPE 2, CIRCULAR, 361N. LFT 1,415 $95.84 $135,613.60 u,.00 1,431.00 $137,147.04 67 PIPE, TYPE 4, CIRCULAR, 61N. LFT 18,429 $4.35 $80,166.15 18,429.00 $80,166.15 68 1 PIPE, TYPE 4, CIRCULAR, 81N. LFT 54 1 $8.00 $432.00 54.00 $432.00 69 PIPE, TYPE 2, CIRCULAR, 121N. LFT 4,232 $39.45 $166,952.40 16.00 4,208.00 $166,005.60 70 PIPE, TYPE 2, CIRCULAR, 151N. LFT 416 $50.95 $21,195.20 12.00 428.00 $21,806.60 71 PIPE, TYPE 2, CIRCULAR, 181N. LFT 1,099 $46.37 $50,960.63 1,097.00 $50,867.89 72 PIPE, TYPE 2, CIRCULAR, 21 IN. LFT 299 $55.18 $16,498.82 299.00 $16,498.82 73 PIPE, TYPE 2, CIRCULAR, 241N. LFT 670 $60.93 $40,823.10 669.00 $40,762.17 74 PIPE, TYPE 2, CIRCULAR 271N. LFT 25 $123.09 $3,077.25 I S o�� 40.00 $4,923.60 75 PIPE, TYPE 2, CIRCULAR, 301N. LFT 195 $75.60 $14,742.00 195.00 $14,742.00 76 PIPE, TYPE 2, CIRCULAR, 42 IN. LFT 355 $130.20 $46,221.00 355.00 $46,221.00 77 PIPE, TYPE 2, CIRCULAR, 48 IN. LFT 1,590 $151.85 $241,441.50 1,590.00 $241,441.50 77a PIPE, TYPE 2, DEFORMED, MIN. AREA 3.3 SFT LFT 48 $80.30 $3,854.40 21.00 $1,686.30 776 PIPE, TYPE 2, DEFORMED, MIN. AREA 5.1 SFT LFT 546 $107.60 $58,749.60 546.00 $58,749.60 78 STORMWATER TREATMENT SYSTEM, 2.08 CFS EACH 1 $21,280.78 $21,280.78 1.00 $21,280.78 79 STORMWATER TREATMENT SYSTEM, 2.9 CFS EACH 1 $21,280.78 $21,280.78 1.00 $21,280.78 80 STORMWATER TREATMENT SYSTEM, 2.23 CFS EACH 1 $21,280.78 $21,280.78 1.00 $21,280.78 81 STORMWATER TREATMENT SYSTEM, 1.12 CFS EACH 1 $21,280.78 $21,280.78 1.00 $21,280.78 82 STORMWATER TREATMENT SYSTEM, 2.76 CFS EACH 1 $21,280.78 $21,280.78 1.00 $21,280.78 83 STORMWATER TREATMENT SYSTEM, 1.65 CFS EACH 1 $21,280.78 $21,280.78 1.00 $21,280.78 84 VIDEO INSPECTION FOR PIPE LFT 10,325 $1.29 $13,319.25 16.(:c'. 10,314.00K$75,484.50 305.06 85 PIPE END SECTION, DIAMETER 12 IN. EACH 3 $873.60 $2,620.80 2 J -.l 5.00 68.00 86 PIPE END SECTION, DIAMETER 151N, EACH 2 $917.11 $1,834.22 2.00 34.22 87 PIPE END SECTION, DIAMETER 181N. EACH 4 $971.48 $3,885.92 4.00 85.92 88 OUTLET PROTECTOR, 3 EACH 2 $1,050.00 $2,100.00 2.00 100.00 89 VIDEO INSPECTION FOR UNDERDRAINS LFT 3,000 $0.99 $2,970.00 3,000.0070.00 90 AGGREGATE FOR UNDERDRAINS CYS 1,659 $45.50 $75,484.50 1,659.00 484.5091 GEOTEXTILES FOR UNDERDRAIN SYS 16,587 $1.15 $19,075.05 16,587.00075.0592 MANHOLE, J10 EACH 6 $4,602.60 $27,615.60 1.00 7.00 218.2093 CASTING, ADJUST TO GRADE EACH 13 $623.76 $8,108.88 13.00 108.8894 INLET, J10 EACH 46 $2,443.76 $112,412.96 1.00 47.00 ,856.7295 INLET, M10 EACH 5 $2,448.81 $12,244.05 5.00 244.05% CATCH BASIN, K10 EACH 41 $2,601.45 $106,659.45 (1.00) 40.00 ,058.0097 MANHOLE, C4 EACH 30 $2,847.34 $85,420.20 (100 (300) 26.00 030.8498 CATCH BASIN, F7 EACH 1 $1,974.33 $1,974.33 1.00 974.3399 MANHOLE, K4 EACH 17 $8,549.72 $145,345.24 6.00 23.00 ,643.56 100 MANHOLE, J4 EACH 20 $5,140.48 $102,809.60 14.00 $71,966.72 101 CATCH BASIN, M30 EACH 41 $2,617.76 $107,328.16 41.00 $107,328.16 102 DETENTION OUTFALL STRUCTURE, D EACH 5 $8,666.12 $43,330.60 4.00 $34,664.48 103 DETENTION OUTFALL STRUCTURE, E EACH 1 $9,077.18 $9,077.18 1.00 $9,077.18 104 CONSTRUCTION SIGN, C EACH 3 $297.00 $891.00 3.00 $891.00 105 ROAD CLOSURE SIGN ASSEMBLY EACH 6 $507.00 $3,042.00 6.00 $3,042.00 105a TEMPORARY PAVEMENT MARKING, 4IN LFT 6,000 $0.67 1 $4,020.00 6,000.00 $4,020.00 Paae 3 of 5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07 Change Order 84 - Quantity Adjustments REM NO. DESCRIPTION UNIT Original Qwnttty UNIT PRICE gnu Ori (Total Construction Construction Change 41 Qtys. Change k2 Qtys.Qwntl New Total New Total Dollar Amount 105b TEMPORARY PAVEMENT MARKING, REMOVABLE, 41N LFT 2,600 $1.05 $2,730.00 2,600.00 $2,730.00 106 DETOUR ROUTE MARKER ASSEMBLY EACH 22 $152.00 $3,344.00 22.00 $3,344.00 107 CONSTRUCTION SIGN, A EACH 14 $249.00 $3,486.00 14.00 $3,486.00 108 CONSTRUCTION SIGN, B EACH 13 $104.00 $1,352.00 13.00 $1,352.00 109 MAINTAINING TRAFFIC LS 1 $153,029.18 $153,029.18 1.00 $153,029.18 110 BARRICADE, 1148 LFT 264 $30.00 $7,920.00 264.00 $7,920.00 111 STREET SIGN POST EACH 6 $1,850.00 $11,100.00 6.00 $11,100.00 111 SIGN, SHEET, AND SUPPORTS, REMOVE EACH 33 $25.00 $825.00 33.00 $825.00 113 BGSEPOST, SQUARE TYPE IUNREINFORCED ANCHOR LFT 425 $14.00 $5,950.00 425.00 $5,950.00 114 SIGN, SHEET, WITH LEGEND, 0.080 IN. SFT 184 $17.00 $3,128.00 38.00 222.00 $3,774.00 115 SIGN, SHEET, WITH LEGEND, 0.100 IN. SFT 117 $19.00 $2,223.00 72.00 189.00 $3,591.00 116 CONDUIT, PVC, 2 IN. SCHEDULE 40 LFT 493 $8.D0 $3,944.00 493.00 $3,944.00 117 CONDUIT, HDPE, 2 IN. SCHEDULE 80 LFT 162 $12.00 $1,944.00 162.00 $1,944.00 118 ORNAMENTAL LIGHT POLE, FOUNDATION, LUMINARIES EACH 6 $8,900.00 $53,400.00 6.00 $53,400.00 119 HANDHOLE, FOR INTERDUCT EACH 31 $975.00 $30,225.00 31.00 $30,225.00 120 PVC SCHEDULE 40-4" LFT 9,502 $5.00 $47,510.00 9,502.00 $47,510.00 121 PVC SCHEDULE 40.4"INTERDUCT LFT 9,502 $9.00 $85,518.00 9,502.00 $85,518.00 122 PVC SCHEDULE 80-4" LFT 205 $7,00 $1,435.00 205.00 $1,435.00 123 PVC SCHEDULE 8G-4" INTERDUCT LFT 205 $20.00 $4,100.00 205.00 $4,100.00 124 HANDHOLE LIGHTING EACH 4 $650.00 $2,600.00 4.00 $2,600.00 POINT II MODIFIED EACH 1 $5,500.00 $5,500.00 1.00 $5,500.00 WIRE, NO. 6 COPPER, IN PLASTICC DUCT, 41/C LFT 162 $8.00 $1,296.00 162.00 $1,296.00 uICRE, NO. 6 COPPER, IN PLASTIC DUCT, IN TRENCH, 4 LFT 493 $8.00 $3,944.00 493.00 $3,944.00 K12SSERVICE CONNECTOR KR, UNFUSED EACH 6 $37.00 $222.00 6.00 $222.00 CONNECTOR KIT, FUSED EACH 6 $35.00 $210.00 6.00 $210.00 MULTIPLE COMPRESSION FITTING, WATERPROOFED EACH 17 $21.00 $357.00 17.00 $357.00 INSULATION LINK, WATERPROOFED EACH 28 $15.00 $420.00 28.00 $420.00 132 WIRE, TW/THW, NO. 10 COPPER, STRANDED LFT 471 $1.00 $471.00 471.00 $471.00 133 TRANSVERSE MARKING, THERMOPLASTIC, CROSSWALK LINE, WHITE, 241N. LFT 928 $5.65 $5,243.20 928.00 $5,243.20 134 LINE, THERMOPLASTIC, BROKEN, WHITE, 41N. LFT 592 $1.95 $1,154.40 592.00 $1,154.40 135 LINE, THERMOPLASTIC, SOLID, WHITE, 41N, LFT 21050 $0.73 $1,496.50 149.00 2,399.00 $1,751.27 136 LINE, THERMOPLASTIC, DOTTED, WHITE, 8 IN. LFT 116 $3.15 $365.40 116.00 $365.40 137 TRANSVERSE MARKING, THERMOPLASTIC, YIELD LINE, WHITE, 361N. LFT 47 $12.20 $573.40 47.00 $573.40 138 LINE, THERMOPLASTIC, SOLID, YELLOW, 41N. LFT 3,449 $0.73 $2,517.77 275.00 3,724.00 $2,718.52 139 TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 241N. LFT 117 $5.65 $661.05 1.00 118.00 $666.70 140 PAVEMENT MESSAGE MARKING, THERMOPLASTIC LANE INDICATION ARROW EACH 26 $109.00 $2,834.00 8.00 34.00 $3,706.00 141 SNOWPLOWABLE RAISED PAVEMENT MARKER EACH 155 $25.00 $3,875.00 155.00 $3,875.00 142 LINE, THERMOPLASTIC, SOLID, YELLOW, 81N. LFT 2,269 $1.90 $4,311.10 55.00 2,324.00 $4,415.60 143 UNE, THERMOPLASTIC, SOLID, YELLOW, 12 IN. LFT 460 $2.85 $1,311.00 17.00 477.00 $1,359.45 143a 2W DUCTILE IRON WATER MAIN LFT 1,520 $109.72 $166,774.40 1,520.00 $166,774.40 143b 8" DUCTILE IRON WATER MAIN LFT 80 $90.20 $7,216.00 80.00 $7,216.00 143c 8" GATE VALVE EACH 1 $1,477.28 $1,477.28 1.00 $1,477.28 143d 20" X 8" STAINLESS TAPPING SADDLE AND VALVE EACH 1 $8,354.44 $8,354.44 1.00 $8,354.44 143e 8" WATER MAIN LOWERING EACH 1 $5,599.00 $5,599.00 1.00 $5,599.00 143f 10" WATER MAIN LOWERING EACH 1 1 $6,260.48 $6,260.48 1.00 $6,260.48 143 16" WATER MAIN LOWERING EACH 1 1$10,776.14 $10,776.14 1.00 $10,776.14 143h 20" WATER MAIN LOWERING EACH 6 $13,814.76 $82,888.56 6.00 $82,888.56 1431 8" WATER MAIN CONNECTION EACH 2 $3,475.74 $6,951.48 2.00 $6,951.48 143 20" WATER MAIN CONNECTION EACH 4 $4,486.76 1 $17,947.04 4.00 $17,947.04 Paae 4 of 5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07 Change Order R4 - Quantity Adjustments ITEM NO. DESCRIPTION UNIT Original Quantity UNIT PRICE ONglml Total Construction Construction Change 41 Qtys. Change p2 Qtys. New Total Quantity New Total Dollar Amount 143k LONG SIDE SERVICE EACH 1 $3,882.93 $3,882.93 1.00 $3,882.93 1431 METER PIT RELOCATION EACH 1 $1,327.05 $11327.05 1.00 $1,327.05 143. BACKFLOW RELOCATION EACH 1 $525.38 $525.38 1.00 $525.38 143n RELOCATE SAMPLING STATION EACH 1 $1,518.42 $1,518.42 1.00 $1,518.42 1430 ADJUST VAVLE TO GRADE REMOVE & REPLACE HYDRANT & ADJUST TO GRADE EACH 17 $4,476.55 $76,101.35 17.00 $76,101.35 143p NEW HYDRANT ASSEMBLY EACH 5 $6,016.55 $30,082.75 5.00 $30,082.75 1434 REMOVE AND RETIRE HYDRANT EACH 3 $626.30 $1,878.90 3.00 $1,878.90 143r ADJUST VALVE TO GRADE EACH 18 $321.44 $5,785.92 18.00 $5,785.92 143s VALVE RETIREMENT EACH 3 $585.16 $1,755.48 3.00 $1,755.48 143t LINE STOPS 20"(UNDISTRIBUT t O) EACH 4 $17268.55 $69,074.20 4.00 $69,074.20 - ION OUTFA URE, .�. ,. . a " •:�. J4 $0.00 1.Oi1 1.00 $8,332.94 143v SEPTIC REPLACEMENT- per Change Order 12 1 1S 11 $36,031.35 $0.00 1.00 $36,031.35 143w DECORATIVE SOLAR FLASHER- per Change Order 43 I EACH 0 $7,806.66 $0.00 6.00 6.00 $46,839.96 W -F ANTITIES COMMON CYS 883 $3500 $30,905.00 883.00 $30,905.00 BORROW CYS 2,782 $0.01 $27.82 2,782.00 $27.82 SEDIMENT, REMOVE CYS 10 $33.74 $337.40 10.00 $337.40 M144EXCAVATION, TEMPORARY INLET PROTECTION EACH 14 $65.00 $910.00 14.00 $910.00 TEMPORARY SILT FENCE LFT 2,105 $1.79 $3,767.95 2,105.00 $3,767.95TEMPORARY SEED MIXTURE LBS 48 $0.25 $12.00 48.00 $12.00 SUBGRADE TREATMENT, TYPE 11 SYS 59 $24.80 $1,463.20 59.00 $1,463.20 151 SUBGRADE TREATMENT, TYPE Ill SYS 1,597 $1.83 $2,922.51 1,597.00 $2,922.51 152 SUBGRADE TREATMENT, TYPE IB SYS 4,596 1 $6.73 $30,931.08 4,596.00 $30,931.08 153 STRUCTURE BACKFILL, TYPE 1 CYS 177 $25.66 $4,541.82 177.00 $4,541.82 154 STRUCTURE BACKFILL, TYPE 2 CYS 266 $92.94 $24,722.04 266.00 $24,722.04 155 STRUCTURE BACKFILL, TYPE 5 CYS 36 $73.45 $2,644.20 36.00 $2,644.20 156 COMPACTED AGGREGATE NO. 53 BASE TON 295 $32.87 $9,696.65 295.00 $9,696.65 157 HMA SURFACE, TYPE C TON 292 $71.46 $20,866.32 292.00 $20,866.32 158 HMA INTERMEDIATE, TYPE C TON 487 $56.71 $27,617.77 487.00 $27,617.77 158a HMA INTERMEDIATE, OG, TYPE C TON 641 $54.13 $34,697.33 641.00 $34,697.33 159 HMA BASE, TYPE C TON 1,207 $51.90 $62,643.30 1,207.00 $62,643.30 160 ASPHALT FOR TACK COAT TON 4 $O.Ol $0.04 4.00 $0.04 161 HMA FOR SIDEWALKS TON 221 $87.33 $19,299.93 221.00 $19,299.93 162 SIDEWALK, CONCRETE, 4" SYS 39 1 $51.81 $2,020.59 39.00 $2,020.59 163 CURB RAMP, CONCRETE SYS 25 1 $175.41 $4,385.25 25.00 $4,385.25 164 DETECTABLE WARNING SURFACES SYS 5 $326.25 $1,631.25 5.00 $1,631.25 165 HANDRAIL, 481N. ITEM DELETED per CHANGE ORDER 84 LFT 58 $120.00 $6,960.00 0.00 $0.00 166 CURB AND GUTTER CONCRETE, TYPE II LFT 1,830 $19.05 $34,861.50 1,830.00 $34,861.50 167 CURB AND GUTTER, TURNOUT CONCRETE LFT 6 $469.97 $2,819.82 6.00 $2,819.82 168 CONCRETE ROLL CURB &GUTTER LFT 262 $48.66 $12,748.92 262.00 $12,748.92 169 PCCP FOR APPROACHES, 61N. SYS 59 $60.95 $3,596.05 59.00 $3,596.05 170 MAILBOX ASSEMBLY, TRIPLE EACH 1 $225.00 $225.00 1.00 $225.00 171 GEOTEXTILES SYS 1,140 1 $0.99 $1,128.60 1,140.00 $1,128.60 172 RIPRAP, CLASS 1 TON 1,070 $46.35 $49,594.50 1,070.00 $49,594.50 173 RIPRAP, REVETMENT TON 260 $23.16 $6,021.60 260.00 $6,021.60 174 RIPRAP, UNIFORM HAND LAID) TON 4 $95.96 $383.84 4.00 $383.84 175 MOBILIZATION AND DEMOBILIZATION FOR SEEDING EACH 2 $50.00 $100.00 2.00 $100.00 176 EROSION CONTROL BLANKET SYS 1,375 $1.17 $1,608.75 1,375.00 $1,608.75 177 WATER M.G. 25 $1.00 $25.00 25.00 525.00 178 TOPSOIL CYS 1,169 $45.64 $53,353.16 1,169.00 $53,353.16 179 SODDING, NURSERY SYS 1 3,540 1 $3.25 1 $11,505.00 3,540.00 $11,505.00 Paae 5 of 5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07 Change Order #4 - Quantity Adjustments ITEM NO. DESCRIPTION UNIT Original Quantity UNIT PRICE Original Total Construction Construction Change 41 Qtys. Change p2 Drys. New Total Quantity New Total Dollar Amount 180 CONCRETE, CLASS, A CYS 17 $252.59 $4,294.03 17.00 $4,294.03 181 241N. SDR 11 HDPE WATER MAIN LFT 176 $305.36 $53,743.36 176.00 $53,743.36 182 1A 201N. RESTRAINED JOINT DUCTILE IRON LFT 25 $724.08 $18,102.00 25.00 $18,102.00 183 20" LINE STOP EACH 2 $17,268.55 $34,537.10 2.00 $34,537.10 184 201N. CONNECTION EACH 2 $6,202.22 $12,404.44 2.00 $12,404.44 185 REMOVE, REPLACE AND RELOCATE FIRE HYDRANT REMOVE, EACH 1 $5,261.37 $5,261.37 1.00 $5,261.37 186 BOX TO GRADE EACH 3 $468.43 $1,405.29 3.00 $1,405.29 187 PIPE, TYPE 4, CIRCULAR, 61N. LFT 2,274 $4.75 $10,801.50 2,274.00 $10,801.50 188 PIPE, UNDERDRAIN, OUTLET 6 IN. LFT 191 $14.50 $2,769.50 191.00 $2,769.50 189 PIPE, TYPE 2, CIRCULAR, 12 IN. LFT 642 $42.68 $27,400.56 642.00 $27,400.56 190 PIPE, TYPE 2, CIRCULAR, 151N. LFT 15 $235.30 $3,529.50 15.00 $3,529.50 191 VIDEO INSPECTION FOR PIPE LFT 65S $2.39 $1,565.45 655.00 $1,565.45 192 PIPE END SECTION, DIAMETER 12 IN. EACH 1 $873.58 $873.58 1.00 $873.58 193 VIDEO INSPECTION FOR UNDERDRAINS LFT 3,000 $0.99 $2,970.00 3,000.00 $2,970.00 194 AGGREGATE FOR UNDFRDRAINS CYS 94 $50.00 $4,700.00 94.00 $4,700.00 195 GEOTEXTILES FOR UNDERDRAIN SYS 1,076 $2.40 $2,582.40 1,076.00 $2,582.40 196 YARD LIGHTS, ADJUST TO GRADE EACH 7 $250.00 $1,750.00 7.00 $1,750.00 197 CASTING, ADJUST TO GRADE EACH 6 $866.87 $5,201.22 6.00 $5,201.22 198 INLET, E7 EACH 1 $1,881.90 $1,881.90 1.00 $1,881.90 199 INLET, M30 EACH 9 $2,448.81 $22,039.29 9.00 $22,039.29 200 PIPE CATCH BASIN, SB IN. EACH 1 $1,314.06 $1,314.06 1.00 $1,314.06 201 MANHOLE, C4 EACH 3 $2,951.74 $8,855.22 3.00 $8,855.22 202 INLET, AR EACH 3 $2,186.40 $6,559.20 3.00 $6,559.20 203 REINFORCED CONCRETE ARCH (MIN AREA 105.0 SFT.) LFT 64 $3,216.76 $205,872.64 64.00 $205,872.64 204 DETOUR ROUTE MARKER ASSEMBLY EACH 19 $146.00 $2,774.00 19.00 $2,774.00 205 CONSTRUCTION SIGN, A EACH 17 $244.00 $4,149.00 17.00 $4,148.00 206 CONSTRUCTION SIGN, B EACH 2 $105.00 $210.00 2.00 $210.00 207 BARRICADE, III -B LFT 50 $30.00 $1,500.00 50.00 $1,500.00 208 SIGN POST, SQUARE TYPE 1 REINFORCED ANCHOR BASE LFT 81 $14.00 $1,134.00 81.00 $1,134.00 209 SIGN GROUND MOUNTED RESET EACH 8 $20.00 $160.00 8.00 $160.00 210 LINE, THERMOPLASTIC, SOLID, WHITE, 41N. LFT 209 $0.73 $152.57 209.00 $152.57 211 LINE, THERMOPLASTIC, SOLID, YELLOW, 41N. LFT 2,073 $0.73 $1,513.29 2,073.00 $1,513.29 212 TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 241N. LFT 15 $5.65 $84.75 15.00 $84.75 213 TRANSVERSE MARKING, THERMOPLASTIC, CROSSWALK LINE, WHITE, 61N. LFT 103 $1.40 $144.20 103.00 $144.20 214 PAVEMENT MESSAGE MARKING, THERMOPLASTIC LANE INDICATION ARROW EACH 1 $109.00 $109.00 1.00 $109.00 215 PAVEMENT MESSAGE MARKING, THERMOPLASTIC ONLY EACH 1 $147.00 $147.00 1.00 $147.00 216 REVISED PEDESTRIAN HANDRAIL - per Change Order #4 LFT 0 $312.95 $0.00 58.00 $18,151.10 217 CANCELLATION CHARGE (Original Handrail Design) - per Change Order #4 LS 0 $465.00 $0.00 1.00 $465.00 = Adjusted Quantities (as of this Change Order) = New Items ORIGINAL TOTAL= $8,592,091.16 NEW TOTAL= $8,763,253.66