Loading...
HomeMy WebLinkAbout17070018.21DUCTWORK AND PIPING SYMBOLS AND ACCESSORIES GENERAL DEMOLITION NOTES: 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, LAYOUTS AND DIMENSIONS. EXISTING INFORMATION SHOWN ON PLANS IS TAKEN FROM GENERAL FIELD OBSERVATIONS AND MEASUREMENTS AND MAY NOT BE EXACT. 2. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT REMOVED. COORDINATE WITH OWNER WHICH EQUIPMENT WILL BE SALVAGED. DELIVER EQUIPMENT TO LOCATION ON SITE AS DIRECTED BY OWNER. 3. PRIOR TO STARTING ANY DEMOLITION WORK, CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING ANY BASELINE AIR FLOW AND WATER FLOW MEASUREMENTS NECESSARY TO PROPERLY BALANCE ANY EXISTING SYSTEMS/EQUIPMENT THAT WILL BE AFFECTED BY RENOVATION WORK SHOWN ON THESE PLANS. NEW PIPING NEW DUCT MANUAL FLOW CONTROL VALVE AD EXISTING DUCT TO REMAIN �/1 �- — EXISTING DUCT TO BE REMOVED — — — ABOVE FINISHED FLOOR RETURN OR OUTDOOR AIR DUCT DOWN PIPE EXPANSION JOINT RETURN OR OUTDOOR AIR DUCT UP AIR PRESSURE DROP 0 SUPPLY DUCT DOWN THERMOMETER ® SUPPLY DUCT UP THE ARCHITECT. SUPPLY DIFFUSER WITH FLEXIBLE DUCT BHP BREAK HORSEPOWER FLEXIBLE CONNECTION 4 16 X 8 DUCT DIMENSION IN INCHES BRITISH THERMAL UNIT (FIRST DIMENSION IS SIDE SHOWN) 17. ALL EQUIPMENT SHALL BE OF, AND CONSIST OF, AT LEAST THE MINIMUM 10"s SIGNIFIES ROUND DUCT (SIZE IN INCHES) x Q RECTANGULAR DUCT WITH INSIDE LINING SIZES/CAPACITIES INDICATED, AND SHALL PERFORM TO OR SURPASS THE (DIMENSION INDICATED IS SHEET METAL SIZE) I�I ROUND DUCT WITH INSIDE LINING COOLING COIL PIPE TURNED DOWN (DIMENSION INDICATED IS SHEET METAL SIZE) P/T PLUG CFM VANED 90° ELBOW �C CLG CEILING FLEXIBLE ROUND DUCT (MAX. OF 5 FEET) AIR RELIEF VENT VOLUME DAMPER vl FIRE DAMPER DB DRY BULB PIPE OUT BOTTOM Q THERMOSTAT FULL RADIUS ELBOW IO1 GENERAL DEMOLITION NOTES: 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, LAYOUTS AND DIMENSIONS. EXISTING INFORMATION SHOWN ON PLANS IS TAKEN FROM GENERAL FIELD OBSERVATIONS AND MEASUREMENTS AND MAY NOT BE EXACT. 2. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT REMOVED. COORDINATE WITH OWNER WHICH EQUIPMENT WILL BE SALVAGED. DELIVER EQUIPMENT TO LOCATION ON SITE AS DIRECTED BY OWNER. 3. PRIOR TO STARTING ANY DEMOLITION WORK, CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING ANY BASELINE AIR FLOW AND WATER FLOW MEASUREMENTS NECESSARY TO PROPERLY BALANCE ANY EXISTING SYSTEMS/EQUIPMENT THAT WILL BE AFFECTED BY RENOVATION WORK SHOWN ON THESE PLANS. NEW PIPING :& MANUAL FLOW CONTROL VALVE AD ACCESS DOOR �/1 �- ENGINEER. THE FABRICATION DRAWINGS SHALL INCLUDE ANY CHANGE NOTED AFF ABOVE FINISHED FLOOR EXISTING PIPE TO REMAIN PIPE EXPANSION JOINT APD AIR PRESSURE DROP — EXISTING PIPE TO BE REMOVED 4 THERMOMETER BDD BACKDRAFT DAMPER THE ARCHITECT. BHP BREAK HORSEPOWER DIRECTION OF FLOW 4 TEMPERATURE SENSOR BTU BRITISH THERMAL UNIT DOORS. BEFORE SUBMITTAL, REWORK OF ELECTRICAL, PIPING OR DUCTWORK 17. ALL EQUIPMENT SHALL BE OF, AND CONSIST OF, AT LEAST THE MINIMUM BTUH BRITISH THERMAL UNIT PER HOUR 10 PIPE TURNED UP Q PRESSURE GAUGE SIZES/CAPACITIES INDICATED, AND SHALL PERFORM TO OR SURPASS THE CC COOLING COIL PIPE TURNED DOWN P/T PLUG CFM CUBIC FEET PER MINUTE THESE GENERAL NOTES AND SPECIFICATIONS. CLG CEILING PIPE OUT TOP AIR RELIEF VENT CONT'DCONTINUATION vl DUCTWORK SHOWN AND AVAILABLE CEILING/CHASE SPACE ALLOWS SUCH DB DRY BULB PIPE OUT BOTTOM Q THERMOSTAT DN DOWN LL C DPR DAMPER INDICATES DIRECTION OF SLOPE O TEMPERATURE SENSOR DWG DRAWING THESE DRAWINGS INDICATE REQUIRED SIZE AND POINTS OF TERMINATION FOR UNDER THE SUPERVISION OF AN AABC CERTIFIED TEST AND BALANCE ENGINEER DX DIRECT EXPANSION UNION QQ HUMIDISTAT EAT ENTERING AIR TEMPERATURE � SUGGESTED ROUTING, BUT EDB ENTERING DRY BULB TEMPERATURE 0 ASPIRATING THERMOSTAT EER ENERGY EFFICIENCY RATIO GATE VALVE A \ ELEV ELEVATION BALANCE, ASHRAE - 1984 SYSTEMS HANDBOOK, AND NEBB PROCEDURALrr ®o CO2 SENSOR n� 00 L HEADROOM AND MAINTAIN MAXIMUM CLEARANCE WITHOUT FURTHER STANDARDS FOR TESTING, BALANCING AND ADJUSTING OF ENVIRONMENTAL EQP EQUIPMENT BALL VALVE INSTRUCTION FROM THE ENGINEER OR ADDITIONAL COST TO THE OWNER. SYSTEMS. ADJUST AIR HANDLING SYSTEMS TO PLUS OR MINUS 5 PERCENT FOR ESP EXTERNAL STATIC PRESSURE Z 7 X PLAN NOTE EWB ENTERING WET BULB TEMPERATURE BUTTERFLY VALVE EWT ENTERING WATER TEMPERATURE CONNECT NEW TO EXISTING, 12. CONTRACTOR SHALL BE REQUIRED TO PROVIDE COORDINATION AND RESOLVE VERIFY EXACT SIZE AND LOCATION °F DEGREES FAHRENHEIT 2 -WAY TEMPERATURE CONTROL VALVE FC FORWARD CURVED 13. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL OF REMOVE EXISTING TO THIS POINT, FD FIRE DAMPER 3 -WAY TEMPERATURE CONTROL VALVE , VERIFY EXACT SIZE AND LOCATION FD/SD COMBINATION FIRE/SMOKE DAMPER rn FL FLOOR CHECK VALVE V FT FEET HW HEATING HOT WATER SUPPLY FTR FIN TUBE RADIATION STRAINER ` W HWR HEATING HOT WATER RETURN STRAINER WITH BLOWDOWN 14. ALL DUCTWORK, PIPING AND VALVES SHALL BE CONCEALED ABOVE CEILING OR CWc CHILLED WATER SUPPLY WITHIN WALLS AND BULKHEADS IN FINISHED AREAS UNLESS OTHERWISE AUTOMATIC FLOW CONTROL VALVE C. INDICATED. CWR CHILLED WATER RETURN 15. GENERAL NOTES & SPECIFICATIONS: 1. CONTRACTOR IS URGED TO VISIT THE SITE PRIOR TO BIDDING TO DETERMINE EXISTING CONDITIONS, LAYOUTS, EQUIPMENT SIZES AND CONFIGURATIONS. 2. PRIOR TO STARTING ANY WORK ON THIS PROJECT. BALANCING CONTRACTOR SHALL INVESTIGATE THE EXISTING AIR SYSTEMS BEING MODIFIED AND SHALL PERFORM ANY NECESSARY BASELINE TESTS REQUIRED TO MAINTAIN BALANCE OF AIRFLOW TO AREAS OF THE BUILDING NOT BEING RENOVATED/MODIIFIED BUT MAY BE AFFECTED BY THE NEW WORK. 3. ALL SYSTEMS SHALL BE INSTALLED PER APPLICABLE STATE AND LOCAL CODES IN A CRAFTSMANLIKE MANNER. 4. ALL DUCTWORK SHALL BE GALVANIZED METAL INSTALLED PER SMACNA STANDARDS. PROVIDE RADIUSED ELBOWS WHERE FEASIBLE, 90 DEGREE ELBOWS LARGER THAN 12"x12" SHALL BE PROVIDED WITH TURNING VANES OR RADIUSED ELBOWS. ALL BRANCH TAKE -OFFS ON RETURN, SUPPLY AND EXHAUST DUCTS TO GRILLES AND DIFFUSERS SHALL HAVE SINGLE BLADE VOLUME DAMPER UNLESS OTHERWISE NOTED. 5. ALL CONCEALED SUPPLY AIR DUCTWORK (INSTALLED ABOVE CEILING) SHALL BE WRAPPED WITH MINIMUM 1-1/2" THICK BLANKET GLASS FIBER DUCTWRAP INSULATION WITH THERMAL CONDUCTIVITY OF 0.26 AT 75°F DIFFERENTIAL, VAPOR BARRIER SHALL BE COMBINATION ALUMINUM FOIL REINFORCED WITH GLASS FIBER YARN MESH AND LAMINATED TO 40 LB. FLAMES RESISTANT KRAFT PAPER HAVING 2" TAB. 6. ALL RECTANGULAR SHEET METAL DUCT SIZES SHOWN ARE INSIDE DIMENSIONS. ALL ROUND DUCT SIZES SHOWN ARE INSIDE DIAMETERS. ALLOWANCE FOR ACOUSTICAL LINER WHERE REQUIRED ON DRAWINGS MUST BE ADDED TO OBTAIN OUTSIDE SHEET METAL DIMENSION. 7. MAXIMUM FLEX DUCT LENGTH TO GRILLES AND DIFFUSERS SHALL BE 5'-0". 8. ALL DUCTWORK SHALL BE SEALED IN ACCORDANCE WITH LOCAL ENERGY CODES. 9. DUCTS PENETRATING FLOOR SLABS AND/OR WALLS SHALL BE SEALED AS REQUIRED BY CODE. DUCTS PENETRATING FIRE RATED WALLS AND/OR FLOORS SHALL HAVE OPENINGS AROUND DUCT SEALED WITH A MATERIAL HAVING THE SAME FIRE RATING AS THE WALL OR FLOOR. ABBREVIATIONS GALV GALVANIZED GPM GALLONS PER MINUTE GV GRAVITY VENTILATOR HC HEATING COIL HD HEAD HP HORSEPOWER HWR HOT WATER RETURN HWS HOT WATER SUPPLY HZ HERTZ (CYCLES PER SECOND) IN INCHES IN HG INCHES OF MERCURY IN WC INCHES WATER COLUMN L LOUVER LAT LEAVING AIR TEMPERATURE LDB LEAVING DRY BULB TEMPERATURE LWB LEAVING WET BULB TEMPERATURE LWT LEAVING WATER TEMPERATURE MBH THOUSAND BTUH MFR MANUFACTURER MAX. MAXIMUM MIN. MINIMUM OA OUTSIDE AIR OAI OUTDOOR AIR INTAKE OBD OPPOSED BLADE DAMPER OD OUTSIDE DIAMETER/ DIMENSION PD PRESSURE DROP PH PHASE O PSI POUNDS PER SQUARE INCH PSIA POUNDS PER SQUARE INCH ABSOLUTE PSIG POUNDS PER SQUARE INCH GAUGE RET RETURN RG RETURN GRILLE OR REGISTER RPM REVOLUTIONS PER MINUTE RV RELIEF VENT SD SUPPLY DIFFUSER OR SMOKE DAMPER SP STATIC PRESSURE SPEC SPECIFICATION TC TEMPERATURE CONTROL TD TEMPERATURE DROP OR DIFFERENCE TEMP TEMPERATURE TSP TOTAL STATIC PRESSURE TYP TYPICAL UV UNIT VENTILATOR V VENT, VOLTS VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE VUV VERTICAL UNIT VENTILATOR W/ WITH WB WET BULB WPD WATER PRESSURE DROP 0 ROUND OR DIAMETER OVAL NOTE DESIGNATION PLAN NOTE: SPECIFIC INFORMATION AS INDICATED ON A DRAWING `— LEADER LINE OF PLAN NOTE REFERENCED DIRECTED TO ITEM OF PLAN NOTE REFERENCED 1 CIRCLE WITH NUMBER INDICATES A PLAN NOTE REFERENCED, WITH THE NUMBER INDICATING THE ITEM NUMBER OF THE PLAN NOTE REFERENCED. (HEXAGON INDICATES HVAC DEMOLITION PLAN NOTE) DRAWING SYMBOLS DENOTES MECHANICAL DETAIL M0 1 DETAIL NUMBER M3.2 SHEET WHERE DETAIL IS SHOWN SECTION DIRECTION - SECTION NUMBER MS 1 M3.2 DENOTES MECHANICAL SECTION SHEET WHERE SECTION IS SHOWN DIFFUSER AND GRILLE NOTATION (1)S 1-10G DESIGN CFM MARK (REFER TO DIFFUSER AND GRILLE SCHEDULE) QUANTITY OF UNITS IN ROOM `. I WOOL[ Architecture I Engine 7635 Interactive Suite 100 Indianapolis, IN 317.299.7500 �OE'4E1L0PM Q A Public / P mak=" Partnersi v City of Cr lndiar oOl At � fQ� = No. AR 19600 * STATE ( �R&A—M 10. SHEET METAL FABRICATION DRAWINGS ARE TO BE SUBMITTED TO THE 16. ALL WALL THERMOSTATS, TEMPERATURE SENSORS, AND/OR HUMIDISTATS SHALL FLOOR TO BOTTOM AND LINED UP �/1 �- ENGINEER. THE FABRICATION DRAWINGS SHALL INCLUDE ANY CHANGE NOTED BE APPROXIMATELY 4'-7" ABOVE FINISHED AND APPROVED BY THE ARCHITECT/ENGINEER. THE FABRICATION OF DRAWINGS VERTICALLY WITH LIGHT SWITCHES UNLESS OTHERWISE NOTED OR DIRECTED BY -� Q SHALL BE COORDINATED WITH THE ELECTRICAL, STRUCTURAL, PLUMBING, THE ARCHITECT. REFRIGERATION, SPRINKLER AND PIPING WORK INCLUDING CEILING HEIGHT AND z t DOORS. BEFORE SUBMITTAL, REWORK OF ELECTRICAL, PIPING OR DUCTWORK 17. ALL EQUIPMENT SHALL BE OF, AND CONSIST OF, AT LEAST THE MINIMUM O (BECAUSE OF CONFLICTS) WILL BE CONSIDERED AS A PART OF THIS CONTRACT SIZES/CAPACITIES INDICATED, AND SHALL PERFORM TO OR SURPASS THE WITHOUT ADDITIONAL COST TO THE OWNER. ROUND DUCTWORK SUBSTITUTION MINIMUM REQUIREMENTS INDICATED IN SCHEDULES, AS NOTED AND WITHIN _ U) OF RECTANGULAR DUCTWORK IS ACCEPTABLE AS LONG AS ROUND DUCTWORK THESE GENERAL NOTES AND SPECIFICATIONS. AREA IS EQUAL TO OR LARGER THAN THE AREA OF THE RECTANGULAR vl DUCTWORK SHOWN AND AVAILABLE CEILING/CHASE SPACE ALLOWS SUCH 18. AIR SYSTEM SHALL BE BALANCED BY A COMPANY SPECIALIZING IN THE W SUBSTITUTION. ADJUSTING AND BALANCING OF AIR SYSTEMS WITH A MINIMUM 3 YEARS LL C DOCUMENTED EXPERIENCE CERTIFIED BY AABC. WORK SHALL BE PERFORMED 99 O 11. THESE DRAWINGS INDICATE REQUIRED SIZE AND POINTS OF TERMINATION FOR UNDER THE SUPERVISION OF AN AABC CERTIFIED TEST AND BALANCE ENGINEER � PIPING, DUCTWORK, CONDUIT, ETC. THE EQUIPMENT SHOWN ILLUSTRATES ALL NECESSARY OFFSETS MAY NOT BE SHOWN. OR A NEBB CERTIFIED TESTING, BALANCING AND ADJUSTING SUPERVISOR. TOTAL NATIONAL � SUGGESTED ROUTING, BUT SYSTEM BALANCE SHALL BE PERFORMED IN ACCORDANCE WITH AABC CONTRACTOR SHALL INSTALL HIS WORK IN A MANNER THAT WILL CONFORM WITH STANDARDS FOR FIELD MEASUREMENT AND INSTRUMENTATION, TOTAL SYSTEM \ THE STRUCTURE. CONTRACTOR SHALL AVOID OBSTRUCTIONS, PRESERVE BALANCE, ASHRAE - 1984 SYSTEMS HANDBOOK, AND NEBB PROCEDURALrr n� 00 L HEADROOM AND MAINTAIN MAXIMUM CLEARANCE WITHOUT FURTHER STANDARDS FOR TESTING, BALANCING AND ADJUSTING OF ENVIRONMENTAL V INSTRUCTION FROM THE ENGINEER OR ADDITIONAL COST TO THE OWNER. SYSTEMS. ADJUST AIR HANDLING SYSTEMS TO PLUS OR MINUS 5 PERCENT FOR Z 7 SUPPLY SYSTEMS AND PLUS OR MINUS 10 PERCENT FOR RETURN AND EXHAUST SYSTEMS. ry 12. CONTRACTOR SHALL BE REQUIRED TO PROVIDE COORDINATION AND RESOLVE W L CONFLICTS OF INSTALLATION BETWEEN TRADES. W 1. 13. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL OF Z HIS WORK TO BE INSTALLED WITH ANY AND ALL OTHER CONTRACTORS TO BE rn AFFECTED BY SUCH WORK, PRIOR TO ORDERING ANY OF THE EQUIPMENT. THIS V SHALL INCLUDE, BUT NOT BE LIMITED TO, ELECTRICAL CHARACTERISTICS, Z CONNECTIONS REQUIRED, PHYSICAL SIZE, COLOR AND FIT. ` W � 14. ALL DUCTWORK, PIPING AND VALVES SHALL BE CONCEALED ABOVE CEILING OR W WITHIN WALLS AND BULKHEADS IN FINISHED AREAS UNLESS OTHERWISE C. INDICATED. 15. ALL VALVES, COILS, DAMPERS, ETC., SHALL BE INSTALLED ALLOWING EASY ACCESS TO THEM. AREAS ADJACENT TO ACCESS PANELS SHALL BE CLEAR OF 0. / ANY OBSTRUCTIONS. PROVIDE CEILING TAGS ON LAY -IN CEILING T -BARS LL. IDENTIFING UNITS & EQUIPMENT LOCATED ABOVE CEILINGS. Uj U) REV DATE DESI 02/28/2017 60% OWN 03/13/2017 75% PREI 04/04/2017 BID AND I A a wA-A mw A■!% A !%r■1mMOM" ArT Proj. No.: r-%-_ ( L__i\1____- MtUHANIt GENERAL SPECIFIC)