Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
17070018.23
YC. TD D.2 'D'.3 D.9 E oc' ' 8x8 2 2 �� I s x 4 Iri 4 3 E -1 _{ ------I---------8x i 4 /� i I �i�_8_xb _ _ 3 L�L i L- - - -- -- �=.moo h rt- ----- 5 F 7 2 8x8 Tl 3 YE.5 F.1 FA F.8 .4 .� r�-.- ILII --ISI I�����I IL-1 1���� r� �� � e -.Sr EULE- (OPEN TO BELOW' IWI 11 0111111111, wrAMMENJUA !_ '© © - 3 THEATER MECHANICAL ROOM o 'i 5 I 51 A T S CD 1 x]2-- 7 ELEVATOR1j1 11 41 ELEVATOR 16 S -280 2 0 G 240 T SD -165 SD -165 20 WOMEN'S �R9OM - - 21) 5. 411 SECOND FLOOR PLAN - HVAC DEMOLITION MD101 1/8" = V-0" 0' 4' 8' 16' DEMOLITION PLAN NOTES DATE DES& 02/28/2017 60% OWN e WOOLI EXISTING DUCTWORK, DIFFUSERS, DUCTWORK ACCESSORIES, ETC. c Architecture I Engin( BACK TO THIS LOCATION AND PATCH/SEAL DUCTWORK AIRTIGHT. INSULATE TOL 7635 Interactivi MATCH EXISTING. vJ J Suite 100 EXISTING DUCTWORK, DIFFUSERS, DUCTWORK ACCESSORIES, ETC. Q Indianapolis, IN BACK TO THIS LOCATION AND PREPARE DUCT FOR DUCTWORK CONNECTION. 317.299.7500 REFER TO SHEET M-101 FOR NEW DUCTWORK CONNECTION. z OREMOVE EXISTING RETURN GRILLE AND ASSOCIATED LINED SOUND ELBOW GENERAL DEMOLITION NOTES: E�titoPa ABOVE GRILLE. .��° A Public /! O4 REMOVE EXISTING THERMOSTAT FOR VAV TERMINAL UNIT SERVING AND div Partner. 1. VERIFY ALL EXISTING CONDITIONS, LAYOUTS AND DIMENSIONS. LAYOUTS AND i 1 DIMENSIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS, FIELD `t v , — 0 s MEASUREMENTS AND GENERAL INSPECTION AND MAY NOT BE EXACT. ' I.L 18 2. REMOVE ANY ITEMS NOT SPECIFICALLY IDENTIFIED TO BE REMOVED WHICH City of C — NEW DUCT CONNECTION. REFER TO SHEET M-101 FOR NEW DUCT CONNECTION. MUST OBVIOUSLY BE DEMOLISHED FOR CONSTRUCTION AND REMODELING TO India 7.9 CEILING DIFFUSERS, ASSOCIATED DUCTWORK, DUCTWORK TAKE PLACE. z L ACCESSORIES, VAV TERMINAL UNIT, ETC. SERVING THIS AREA AS NECESSARY TO ACCOMMODATE NEW WORK IN THIS AREA. FIELD VERIFY EXACT LAYOUT y� ABOVE CEILING. CAP DUCTWORK FROM MAIN SUPPLY AIR DUCT TO TERMINAL 3. DASHED LINES TYPICALLY INDICATE ITEMS TO BE REMOVED. .. 4. WHERE DEMOLITION IS REQUIRED, THE CONTRACTOR SHALL REMOVE ITEMS N1. A! COMPLETE WITH FASTENERS. ANCHORS, SEALANTS, CAULKING, ADHESIVES, - ETC. ADJACENT REMAINING CONSTRUCTION SHALL BE PATCHED/REPAIRED V C IN WORKMANLIKE CONDITION AND PREPARED TO RECEIVE NEW FINISH AS Q NO. W PER ROOM FINISH SCHEDULE. t * ARI 960( w STATE 5. DEMOLITION SHALL BE CAREFULLY COORDINATED WITH THE PLANS, SECTIONS, Q L SCHEDULES THE DCCONSTRUCTION NO �RCHIT OF THEDEMOLITTIONTDRAWINGS DELINEATE OR ITEMS BE REMOVED/REWORKED. NEW CONSTRUCTION REQUIRED. AND EXTENT OF W LL DEMOLITION REQUIRED IS DELINEATED FURTHER IN THE CONTRACT DOCUMENTS. L 6. DEMOLITION WORK TO BE COMPLETED BY OTHER TRADES IS SHOWN ON OTHER SHEETS OF THIS SET OF CONTRACT DOCUMENTS. THIS CONTRACTOR SHALL REVIEW THE DEMOLITION WORK OF OTHER TRADES TO ASCERTAIN WHERE SUCH WORK COULD AFFECT HIS WORK. HE SHALL ALSO COORDINATE HIS WORK WITH THE OTHER TRADES. 7, OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT REMOVED. COORDINATE WITH OWNER WHICH EQUIPMENT WILL BE SALVAGED. DELIVER EQUIPMENT TO LOCATION ON SITE AS DIRECTED BY OWNER. _ 16 S -280 2 0 G 240 T SD -165 SD -165 20 WOMEN'S �R9OM - - 21) 5. 411 SECOND FLOOR PLAN - HVAC DEMOLITION MD101 1/8" = V-0" 0' 4' 8' 16' DEMOLITION PLAN NOTES DATE DES& 02/28/2017 60% OWN e OREMOVE EXISTING DUCTWORK, DIFFUSERS, DUCTWORK ACCESSORIES, ETC. c 1 BID AND I BACK TO THIS LOCATION AND PATCH/SEAL DUCTWORK AIRTIGHT. INSULATE TOL MATCH EXISTING. vJ J OREMOVE EXISTING DUCTWORK, DIFFUSERS, DUCTWORK ACCESSORIES, ETC. Q BACK TO THIS LOCATION AND PREPARE DUCT FOR DUCTWORK CONNECTION. REFER TO SHEET M-101 FOR NEW DUCTWORK CONNECTION. z OREMOVE EXISTING RETURN GRILLE AND ASSOCIATED LINED SOUND ELBOW s 0 ABOVE GRILLE. w - �/ J s O4 REMOVE EXISTING THERMOSTAT FOR VAV TERMINAL UNIT SERVING AND V! RELOCATE TO NEW LOCATION SHOWN ON M-101 FOR ASSOCIATED VAV i TERMINAL UNIT. u- OREMOVE EXISTING DIFFUSER(S) AND GRILLE(S), ASSOCIATED DUCTWORK AND 0 s DUCTWORK ACCESSORIES AS SHOWN. I.L OREMOVE EXPANDED METAL GRILLE FROM RETURN DUCT AND PREPARE FOR 0- 00 NEW DUCT CONNECTION. REFER TO SHEET M-101 FOR NEW DUCT CONNECTION. 00 L OREMOVE CEILING DIFFUSERS, ASSOCIATED DUCTWORK, DUCTWORK z L ACCESSORIES, VAV TERMINAL UNIT, ETC. SERVING THIS AREA AS NECESSARY TO ACCOMMODATE NEW WORK IN THIS AREA. FIELD VERIFY EXACT LAYOUT ABOVE CEILING. CAP DUCTWORK FROM MAIN SUPPLY AIR DUCT TO TERMINAL W i UNIT, CLOSE HOT WATER VALVES AND CAP PIPING AS NECESSARY. REMOVE AND THERMOSTAT UJ L THERMOSTAT. RETURN VAV TERMINAL UNIT TO OWNER. z V C z W w Q L W LL L � �0nn V) REV DATE DES& 02/28/2017 60% OWN 03/13/2017 75% PRET 04/04/2017 1 BID AND I Proj. No.: Date: Sheet Name: SECOND F HVAC DEMOLITH MDM0 m An dIlk dilk A ■■� A �