HomeMy WebLinkAbout102,103-00 East 96th St Auto Park Erosion Control.1k EC -2
47
~, w ��or�mmo—vzc
�wo
N
mx7j-5
��o�E�C�` F"�»—
3.2'E m s2' S.
�
UQ ° N
/�J ^
~ �
A, .4+, + w w +' ~ ~ ~ —^
\ ~~* *~ *~ *~ `* \ ° *I;,* ~
��~ N
�������� aNra
01,
Lhi
7.
lit
41
40
4.
�
~ �
' 0 _--. :p
----------- 742 �
SF
140,
SPI
iloK
EC
15
EC—
AJREA 61.� Box PENCE
EC
ot
FUTURE DEVELOP
739
A EC -4
EEC- EC -4
hid
OEM
UL
1-0
I COW
EC -3 L
EC
1 IEC-4� '(E
ALL RLAkriii 6WALL BE 2 V2- CALIPER
MY TWE C_4MITL ZONING 50AAC,
Futu
73
4 eve lent -
Do
EC
j LA 73 _717
IAQ
if
01
W.
EC -5 EC—
EROSION COWROL NOTES-
1. SB SHEET C101 FOR SOILS MAP AND �,OILCHARACTERISTICS.
2. SEI SHEET C205 FOR EROSION CONTROI DETAILS.
J. 5|O FENCE BARRIER TO BE INSTALLED PRIOR TO CONSTRUCTION.
4. EROSION CONTROL MEASURES TO BE MAINTAINED THROUGHOUT THE ENTIRE CONSTRUCTION
PROCESS.
5. STORM WATER DISCHARGE WILL NOT ENTER THE GROUNDWATER FOR THIS PROJECT.
5. S[[ EROSION CONTROL SP[C|RQq|8NS FOR ALL EROSION CONTROL MEASURES SCHEDULES
AND SEQUENCES.
7. CONTRACTOR TO PROVIDE x STABLE TEMPORARY GRAVEL CONSTRUCTION 0/T
CONDITION FROM THE CONSTRUCTION SITE TO KEEP MUD AND SEDIMENT OFF PUBLIC R005.
8. EROSION CONTROL MAINTENANCE — SITE TO BE |N3P[OEU /T LEAST ONCE A WEEK AND WAKE
REPAIRS |uM[DNJ[LY AFTER PERIODS OF RAINFALL.
3 CONTRACTOR TO PROVIDE THE COUNTY 50|L AND WATER CONSERVATION DISTRICT(S) WITH A
NARRA0YE DESCRIBING THE CONSTRUCTION SEQUENCE, INCLUDING START DATES FOR EACH
LAND DISTURBING ACTIVITY.
LEGEND
PROPOSED EROSION CONTROL
—STRAW BALE CURB
INLET BARRIER
M /~—)
— FILTER FABRIC
—SLOTTED BARREL BARRIER
STRAW BALE INLET BARRIER
9— PIPE OUTLET RIP—RAP
RIP RAP d5O=8*
*AREA' Sq YARDS
~
VEC-5)—SWALE SEDIMENT BARRIER
BARRIERS (TYP. 200' O.C]
PERMANENT SEEDING WITH
EROSION CONTROL BLANKET — N.A.G. 575
PERMANENT SEEDING WITH
HYDR0SEED|NG OR EQUIVALENT MULCH
(C[[ LANDSCAPE PLANS FOR EXCLUDED
AREAS SUCH AS PLANTING RFD5,)
TEMPORARY SEEDING WITH MULCH
TEMPORARY
CONSTRUCTION ENTRANCE
12 INCHES OF #2 STONE
(JO'W x 1001) Minimum
8F� SILT FENCE BARRIER
T9— —FENCING FOR TREE PRESERVATION
—CONSTRUCTION LIMITS
'Hou,MOLfY`
F�����'�F �z. �����
LOCATIONS OF ALL Emsnwo uwocn0000wn ununcS
DIG moww ON THIS puw ARE omso opow ABOVE
Bi_IN— GROUND cwoEwm(�u"�� but not limited m.
manholes, inlets, valves, and moa,mode upon
the ground by others) AND ARE SPECULATIVE IN