Loading...
HomeMy WebLinkAbout0188.03.6TYPICAL FRAME ROOF= 8HINGLF-8 AS SPECIFIED Vib" ROOFING SHEATHING 2x12 RIDGEBOARD 2x6 RAFTERS • 164 o.c. OR AS REQ'D FOR SPAN 2X4 COLLAR TIES * 48' o.c. 2X6 CEILG JOISTS • 16" c.c. OR AS REQ'D FOR SPAN uu/ 2x4 RIBBON TIE R30 BATT INSUL.. MIN. 6 MIL POLY V.B. 1/2' DRYWALL TAPED 4 SANDED TYPICAL 2X4 SIDING EXTER'O"—\ COMPOSITION SIDING 1/16 " WALL SHEATHING 2x4 STUDS 0 16" o.c. R13 BATT INSULATION 6 HIL POLY Y.B. V2" DRYWALL TAPED AND SANDED TYPICAL 2X4 BRICK EXTERIOR WAI BRICK VENEER 1 GAUGE CORRUGATED GALVANIZED METAL BRICK TIES AIR 5r -ACE AS REO'D 112" IN-4UL.. SHEATHING 2X4 STUDS 0 i6" or-. RM BATT INSULATION 6 MIL POLY Y.B. 1/2- DRYWALL TAPED AND SANDED BRICK VENEER W/ I" AIR— SPACE OR HOUSE WRAP, "TYVEK- OR EQUAL, W/ WEEP HOLES 33" O.C. MAX. TYPICAL SILL ASSEMBLY: 112" DIA. XIS" ANCHOR BOLT • 48" o.c. 12" MIN. FROM EA. CORNER 2x4 PRESSURE TREATED SILL PLATE— V4" SILL GASKET BRICK FLASHI STEEL REBAR AS REQUIRED PICAL BASEMENT FLOOR = 4- CONCRETE SLAB c/w FIBRE MESH REINFORCEMENT 6 nll POLY VAPOR BARRIER COMPACTED GRANULAR FILL TYPICAL SECTION SCALE: 1/2" = 1'-0° Q op TYPICAL 8- BASEMENT WALL, TYPICAL WALL 10" IF UNBALANCED BACKFILL ABOVE a ?'AY VARY f -O' LINE ON WALL = i BUILDERS l/2' DRYWALL 'NE' 6 nil POLY VAPOR BARRIER G 21 x 40 STUDS 0 24- ox - VALUES: BATT INSULATION Icz S" CONCRETE FOUNDATION WALL W/ 3 05 BAR RAN HORIZONTAL., SPACED ,G, INSULATION R-38 EQUALLY VERTICALLY, AND VERTICAL 05 BAR AS REQUIRED BY LOCAL CODE DRYWALL R,45 ASPHALT DAMPPROORNG. 2" RIGID FOAM TO BE USED ON >fDE AIR FILM R.68 UNFINISHED INTERIOR CONCRETE. 4 STUD WALL W/ BATT R-13 ' +;IGH R INSUL SHEATHING R4.6 TSIDE AIR FILM R-.17 16" WIDE x 8" EEP LOOD SIDINGS R-.44 CONCRETE FOOTING 2 - RUNS 05 REBAR, TAL R -VALUER -19.34 18" WIDE IF lO" THICK WALL STEEL REBAR AS REQUIRED PICAL BASEMENT FLOOR = 4- CONCRETE SLAB c/w FIBRE MESH REINFORCEMENT 6 nll POLY VAPOR BARRIER COMPACTED GRANULAR FILL TYPICAL SECTION SCALE: 1/2" = 1'-0° Q op 0 4 LA DATE: DRAWN BY: SCALE: REVISIONS: 01-15-02: PRELIMINAR'c 01-22-02: PRINT FINAL SHEET vt U G � .� Icz Q b 0 4 LA DATE: DRAWN BY: SCALE: REVISIONS: 01-15-02: PRELIMINAR'c 01-22-02: PRINT FINAL SHEET