HomeMy WebLinkAboutRieth-Riley Construction, Inc/Eng/CO #4/3,865/136th & Gray Road RAB ProjectCity of Carmel Project 16 -ENG -54
136th Street and Gray Road RAB
CHANGE ORDER #4
Additional common excavation and areas of undercut due to wet soil conditions.
Contract Price prior to this Change Order
Contract Price will be increased by this Change Order
New Contract Price including this Change Order
$3,306,200.33
$3,865.00
$3,310,065.83
Amount
Adjusted Contract
Price
Cumulative % Change
from Original Contract
Original Contract
$3,205,200.00
$3,205,200.00
N/A
C01
$87,364.65
$3,292,564.65
2.73%
CO2
$14,870.68
$3,307,435.33
3.19%
CO3
<$1,235.00>
$3,306,200.33
3.06%
C04
$3,865.00
$3,310,065.83
3.17%
Ww""wDL,Z
ancnZee Ioae,eN 1W AIN(c•a+<NNN+o
sonverir,G • CONerroCriON srv�lcr.s
August 10, 2017
Mr. Jeremy Kashman
City Engineer
City of Carmel
One Civic Square
Carmel, IN 46032
IWI( RIIVC-: ;')PPS
t:XC -iiONA, f)f "I(iN
IJNMA`rC it o Ct.wILT S4 RvICF.
RE: Contract Change Order #4
16 -ENG -16, 126th St and Gray Road Roundabout — PO# 100148
16 -ENG -54, 136th St and Gray Road Roundabout — PO# 100148
16 -SW -107, Gray Road Culvert Replacement (Culvert #165) — PO# 100149
Dear Mr. Kashman,
Please find the enclosed Change Order #3 for work associated with the 1361h and Gray Rd
Roundabout project, PO# 100148. Below is a quick summary of the entire contract to date:
A more complete Change Order Summary is included in these change order documents. Please
contact me if you need more information or have questions.
I
servation Manager
CC: Chris Ogg, American Structurepoint
757 E Maryland Sl, Indianapolis, IN Af2+)=S•3GOsi I OFFICE 317.633.412(7 I ONLINE WWWXt.Z.CUM
Alfrnn tLlrn.tlnrhor Chicago Chtcinn:+ti clevilaNd Colun+bus Uet,roit I-,1I1W.3y1Ie Ft;,I1kiv+1 Indiamvtpolis )Ohm Kalamazoo Lansing
?,oid„vtlln Madison Melvindnia Munetc,r ^ittsbutyh Saint Jmor)h South 14"Ad Tcie:Jo
AMOUNT
% of ORIGINAL CONTRACT
Original Contract
$3,205,200.00
Change Order #1
$87,364.65
2.73%
Change Order #2
$14,870.68
3.19%
Change Order#3
<$1,235.00>
3.06%
Change Order #4
$3,865.00
3.17%
A more complete Change Order Summary is included in these change order documents. Please
contact me if you need more information or have questions.
I
servation Manager
CC: Chris Ogg, American Structurepoint
757 E Maryland Sl, Indianapolis, IN Af2+)=S•3GOsi I OFFICE 317.633.412(7 I ONLINE WWWXt.Z.CUM
Alfrnn tLlrn.tlnrhor Chicago Chtcinn:+ti clevilaNd Colun+bus Uet,roit I-,1I1W.3y1Ie Ft;,I1kiv+1 Indiamvtpolis )Ohm Kalamazoo Lansing
?,oid„vtlln Madison Melvindnia Munetc,r ^ittsbutyh Saint Jmor)h South 14"Ad Tcie:Jo
CITY OF CARMEL
TO: Rieth Riley Construction Co. CONTRACT CHANGE ORDER NO.: 4
1751 W. Minnesota St. DATE: July 25, 2017
Indianapolis, IN 46221 PROJECT NAME: 126`1i St and Gray Road Roundabout
136'h St and Gray Road Roundabout
Gray Rd Culvert Replacement, Culvert 165
CITY P.O. NO.: 100148 and 100149
CITY P.O. DATE: March 1, 2017
1. You are directed to make the following changes in this Contract:
For Project 16 -ENG -54, 136'' and Gray Rd Roundabout, PO #100148, Undercut soft and very wet
areas of subWade prior to placement of Special Subgrade Treatment IB on Gray Rd mainline and
replace with 12" of Compacted Aggregate No 53 Base. Additionally, soft and very wet areas of
subgrade on the trail are necessary to remove and replace with 6" of Compacted Aggregate No 53 Base.
As the mainline subrgrade was being prepared for Special Subgrade Treatment IB, areas of very wet and
yielding soils were encountered. During subgradc preparation for the trail, very wet and unstable soils
were encountered as well.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+1 OR (-) DAYS
006, Common Excavation $1,008.00 0
021, Compacted Aggregate, No 53, Base $2,857.50 0
II. The following referenced documents further describe the changes outlined in Paragraph 1, and are to be
considered a part of this Change Order:
R.F.P.: W.D.C.:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Sum prior to this Change Order $3.306.200.31
Contract Sum will be increasedNeer wed by this Change Order $3.865.50
New Contract Sum including this Change Order $3.310.065.83
Contract Time Prior to this Change Order 512 12017 Substantial Completion Date Days
diet increased/decreased resulting from this Change Order
Current Contract Time including this Change Order
6/20/2017 Final Completion Date Days
0 Days
5!')_0/)017 Substantial Completion Date Days
6/201201 Final Completion Date ___Days
This Change Order is for fltll and final settlement of all direct, indirect, impact costs and time extension incurred at
any time resulting from the performance of the changed work.
The Above Changes Are
Recommended:
DLZ Indiana, LLC,
Engineer
157 E. Maryland St.
Indianapolis, IN 46204
Date IA d -a&-7
The Above Changes Are
Accepted:
Rieth-Riley Construction
Company, Inc
1751 W. Minnesota St.
hidianapolis, IN 46221
By�
Phan
Date'
Approved:
aiwrd, Mayor
ary�ii Burke, Member
, Member
J r Kash an, PE, City
Engineer
ATTEST:
4Chlistine. Paule , Clcrk ��
Y
Treasurer
Date: --,?-6 —6 —/,- 7—
` D L Z CUENT Dir i�/1 rrG PROJECT NO. ll�G ' AFiVG —,4, 7
PROJECT / ��TSr.�G�a,,
/F'� !� j{% SHEET NO OF
ARCHITECTURE• RNGINEERI 11. - KAHNING
SURVEYING • CONSTRUCTION SRRVICES SUBJECT CARO fCOMP. BY DATE
GE A'. i-4 -4. CHECKED BY DATE
r1d 4 `�-o hdtfl 1ctL,E�c cv rJA ', 1 ti
SYA /613,t2S" Tb 57-A /o 3,-�4j* / lr- L/N t
r—(c (o , d i� /D r) X /Z '- 1 77
rq I�3f7` �"a S'rR �0�'GGi" ��N� F�n�2•�r
t i i
Lip To 1,4142Z <7—&A-(,L� �' %�2� � tr
(//�` Z X / /)X
zz
J
,� .. �'-- �-� % � 5� 5r� �v .Sr,� /U 6;x,2 ► �..,f I� .� - �
1. n
t ,�� r , �y, y� tis.
�.DLZ CLIENT �"' �` / e�� PROJECT NO.
PROJECT .3 ,7 S% 41214 RAg SHEET NO. OF—
ARCHITECTURE
• ENO INEERING • PLANNING
EU RVEYINO • CONST RUCTION EERVICEE SUBJECT ,UN,� f' l2of COMP. BY DATE
�H/1 NG/r CHECKED BY DATE
,57,E /a SI-Zr -T S7-lq /o fs� �T Zl of p,,z- d Z
( �,a x /o;) ; } = X8.8 gs7s x c�,�G7/4j 1- 19,Z776s
6 ,S7A 16.3-r7S To sTA lo34-I-r Lrrv/F !z-Z^1�
sys x D/3 T/�, 9s-1otiS
0/0 s7A
5/r: /05tS.O ro S A /66-2)lr��.L�
_ r {
75 f
"•1 � 5 • -1rc) , �
I
f
t
f
"•1 � 5 • -1rc) , �
An
Item Unit Price Planned Otv Revised Qty Difference Cost
006, Common Excavation
021, Compacted Aggregate,
No. 53, Base
$28.00/CYS 2,575.0 2,611.0
$45.00/TON 611.0 674.5
36.0 $1,008.00
63.5 $2,857.50
TOTAL $3,865.50
PROJECT NO: 16 -ENG -16,16 -ENG -54. 16 -SW -107
CONTRACTOR: Rieth RJey Construction Co.
INSPECTION CONSULTANT: DLZ Indiana
BID AMOUNT 53.205.200.00
BID DATE:
02/01/17
CONTRACT
FORESEEN
TOTAL
TOTAL
RUNNING
DESCRIPTION OF
DATE
NEW
% CHANGE
% CHANGE
CHANGE ORDER
OR
FORESEEN
UNFORESEEN
TOTAL OF
CHANGE ORDER
BOARD
CONTRACT
ORDER
ORDER
NUMBER
UNFORESEEN
AMOUNT
AMOUNT
CHANGE ORDERS
APPROVED
AMOUNT
FORESEEN
UNFORESEEN
Owner directed changes at
001
FORESEEN
$87,364.65
$87,364.65
Get_N_Go, Project 16 -SW-
05/17/17
$3,292,564.65
2.73%
107, POO 100149
Replace 10" walemkon
2
UNFORESEEN
$14,870.68
$102,235.33
relocation Items with 12"
Kerns, Project 16 -ENG -54,
$3,307,435.33
0.46%
POO 100148
Replace 3" steel galvanized
3
FORESEEN
41,235.00>
$101,000.33
pipe for electrical with 2"
$3,306,200.33
2.60%
steel galvanized pipe.
4
UNFORESEEN
$3,86550
$164,865.83
Compensate Undercut
$3,310,065.83
$86,129.65 $18,736.18 $104,865.83 $3.310,065.83 2.60% 0.57%
Original Bid Amount
$3,205,200.00
Total Change Order(s) Amount
$104,865.83
Total Foreseen Change Orders
$66,129 65
Total Unforeseen Change Orders
$18,736.18
Total % Change Orders vs Bid Amt
3.17