HomeMy WebLinkAboutGlobe Asphalt/Eng/CO #1/20,718/Multi Use Trail Along Towne RoadTO: CITY OF CARMEL H OR (-) DAYS Chris Ogg CONTRACT CHANGE ORDER NO.: 1 N/A DATE: 8/7/17 N/A PROJECT NAME: 16 -ENG -39 106°i St & Towne Rd RAB CITY REQ. NO.: $23.10/LFT ($1155.00) CITY PO NO.: 100179 CITY PO DATE: 2/16/17eg4RO $1536.91/EACH ($1536.91) N/A $2607.65/EACH ($5215.30) N/A You are directed to make the following changes in this Contract: a. Revise pricing for Subgrade Treatment, IB due to switch from lime to cement stabilization b. Add Geogrid, Type IB to the contract due unstable subgrade along the west leg of the project. c. Add items required to complete new lighting for the contract. d. Add a pipe catch basin to alleviate ponding in the west leg of the project on the north side of the pedestrian path e. Add pay items to update the signs in the plans to Carmel Standards. ITEM *Subgrade Treatment, Type IB Geogrid, Type IB 200 AMP Meter Base Conduit, Galvanized Steel, 21N Pipe Catch Basin, 151N Street Signs, Carmel Standards SCHEDULED ADJUSTMENT AMOUNT H OR (-) DAYS +$1.02/SY ($8,125.32) N/A $2.18/SY ($990.20) N/A $550/EACH ($550.00) N/A $23.10/LFT ($1155.00) N/A $1536.91/EACH ($1536.91) N/A $2607.65/EACH ($5215.30) N/A *Subgrade Treatment, Type IB is already in the contract. The listed price is a revised price due to increase in material costs from switching from Lime to Cement Stabilization. II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Change Order I The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,196,604.12 Contract Price will be increased/decreased by this Change Order $ 17,572.73 New Contract Price including this Change Order $ 1,214,176.85 Contract Time Prior to this Change Order Days Completion Date Net increased/decreased resulting from this Change Order Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended Clark Dietz, Inc. ENGINEER 8900 Keystone Crossing Address Suite 900 Indianapolis, IN 46240 City/State/Zip By: Jason Buck Phone: 574-210-2471 Date: 8/7/17 The Above Changes Are Accepted: Rieth Riley Construction Co., Inc. CONTRACTOR 1751 W. Minnesota IndVapolis, IN 46221 City/State/Zip P&L l- -7-4-7-1-:' By: Mi Phone: 317-634-5561 Date: 4///i% Approved: ZA 4-: � ristine S. Paul y, Clerk - Treasurer Date: ') A ppi A Description: Change Order: Status: Type: Summary: Clark Dietz, Inc. Change Order Details 16 -ENG -39 106th Street and Towne Road Roundabout Draft Changed Conditions New and Revised Items on Contract Date Created: Date Approved: 07/31/2017 Change Order Description: This change order accounts for all items that were added or revised on the contract. The first item in this change order is a revision to item No. 15. The Carmel Specifications for this job state lime stabilization is to be utilized. The contract was bid to use 5% lime for subgrade treatment. The contract submitted a sample to Alt & Witzig Engineering for a soil -chemical modification study. The results of this test yielded use of cement stabilization rather than the specified lime stabilization. A meeting was held with Alt & Witzig Engineering to confirm the results. The switch in stabilizing material increased the unit price of Subgrade Treatment, Type IB by $1.02/SY. This was an overall increase of $8,125.32. Attached are the test results from Alt & Witzig Engineering as well as email correspondence with the involved contractors. The second item in this change order is for an item added to the contract. Geogrid was added to the contract where subgrade treatment, type IB could not be utilized. The contractor encountered very soft soils on the north side of 106th Street in the west leg of the project. This method was cheaper than undercutting the area and adding No. 53 Stone. Mainly these areas were around a shallow gas line and where the tiller could not fit to mix the cement stabilizing material. INDOT specs state Subgrade Treatment, IC can be utilized in place of IB at the same price. The contractor attempted this method but the subgrade still did not pass a proofroll. The subgrade was excavated one foot and then Geogrid was placed. A unit price of $2.18 was submitted by Rieth Riley to complete the work. Initially there was approximately 355.33 SYS of subgrade that needed Geogrid but we found more areas after further investigation bringing the total up to 454.22 SYS. The total for this item is $990.20. The next items in the change order are for items relating to the lighting installed on the project. The contract items did not include a new 200 AMP meter base. The existing one of the project was connected to the signal poles that were removed from the project. There also wasn't steel conduit in the contract to connect the new lighting to existing IPL power. The steel conduit is required by IPL before power can be ran to the controller cabinet. The controller cabinet that was existing on the contract was intended to be used for the new lighting setup. Included in this change order to complete the lighting and conduit on the contract are 1 - 200 AMP meter Base and 50 LFT of 2" galvanized steel totaling $1705.00. The next item in this change order is for the addition of a pipe catch basin on the north side of 106th Street on the west leg of the project. It was noticed that Change Order Details: 16 -ENG -39 Page 1 of 3 08/10/2017 Awarded Project Amount: Authorized Project Amount: Change Order Amount: Revised Project Amount: Increases/Decreases at the very end of the project in this area that significant ponding was occurring and causing issues at both the predestrian path and the adjacent property. The solution to this issue was adding a pipe catch basin and approximately 40 LFT of underdrain to structure 71. Additional cost for this work will be $1536.91 for the Pipe Catch Basin. That unit price was taken from the other roundabout project 116th St and Towne Rd. The underdrain, getotextiles, and aggregate for underdrain are included in the original contract items. Since this item already exists in the contract no formal change order is needed. The item will simply be added to the list of pay items in 16 -ENG -39. The final items in this change order are for updated street signs. The original street signs for '106th Street' and 'Towne Road' were per the MUTCD instead of the Carmel Standard Drawings. The cost is to update two signs and posts to the Standard Drawing 10-11A and 10-11B. There is also a cost to pay for the materials of the signs that were installed per the original plans. The cost of the signs is EA 2,607.65/EACH totaling $5,215.30 for the two signs. The grand total for these change order items is $17,572.77 $1,196,604.12 $1,196,604.12 $17,572.73 $1,214,176.85 Line Number Item Unit Unit Price Current Change Re%ised Quantity Amount Quantity Amount Quantity Amount Section: 1 - Default Section 0130 15 SYS $6.400 7,966.00 $50,982.40 -7,966.00 -$50,982.40 SUBGRADE TREATMENT, TYPE IB Reason: Test results yielded cement stabilization - See 013A for revised pricing (1 Item) Totals $50,982.40 -$50,982.40 New Items Line Number Item Unit Proposed Quantity Unit Price Section: 1 - Default Section 0.00 $0.00 $0.00 Dollar Amount 1110 013A SYS 7,966.00 $7.420 $59,107.72 Subgrade Treatment, Type IB - Revised to use 4% cement stabilization Reason: Test Results yielded use of cement stabilization 1120 0135 SYS 454.22 $2.180 $990.20 Geogrid, Type 113 Reason: Unstable subgrade 1130 0136 EACH 1.00 $550.000 $550.00 200 AMP Meter Base Reason: Revised lighting plan Change Order Details: 16 -ENG -39 Page 2 of 3 08/10/2017 Line Number Item Unit Proposed Quantity 1140 0137 LFT 50.00 Conduit, Glavanized Steel, 2 IN Reason: Revised lighting plan 1150 0139 EACH 1.00 Pipe Catch Basin, 15 IN Reason: Significant ponding issue on project and adjacent property 1160 0140 EACH 2.00 Street Signs - Carmel Standards Reason: Update existing signs to Carmel Standard Drawing 10-11A & 10-11B (6 Items) Unit Price Dollar Amount $23.100 $1,155.00 $1,536.910 $1,536.91 $2,607.650 $5,215.30 Total: +$68,555.13 Change Order Details: 16 -ENG -39 Page 3 of 3 08/10/2017 '10013. &nplottrr (Arned- POST OFFICE 13OX 276 - INDIANAPOLIS, A'WDIANA 46206 - WWWRIETHRILEY.CON1 LETTER OF TRANSMITTAL TO: Clark Dietz DATE: 6121/17 8900 Keystone Crossing, Suite 900 Indianapolis, IN 46240 PROJECT: 16 -ENG -39:1061h 8 Towne Rd. RAB JOB #: 3200698 ATTN: Jason M. Buck RE: 4% Cement Stabilization We Are Sending: Submitted For: Action Taken: Shop Drawings X Approval Approved as Submitted Letter Your Use Approved as Noted Prints/Mans As Requested Returned After Loan X Change Order Review and Comment Resubmit Copies Samples Submit Copies Specifications Sent Via: Email Returned Other. X Attached Returned for Corrections Separate Cover Via: Due Date: Notes/Remarks: Jason, Rieth-Riley Construction Company, Inc. respectfully submits for your approval a price to perform 4% Cement Stabilization at 14" rather than 5% Kiln Dust. The price increase is for material difference only. Existing item #15 would be deleted. The overall price Increase to perform 7,966 SY is $8,115.32. Item Description Quantity Unit Unit Price Extension EWA Subgrade Treatment, IB (4% Cement) 7966 SY $7.42 $59,107_72 TOTAL CC: 3200698 - Job File John Tuddy - RR General Superintendent Paul Ruschmeier - RR Superintendent $59,107.72 Signed: Michael Corn -Aon - Projeet Manager 1751 W. IMINNESO'I'A - INDIANAPOLIS. INDIANA 46221 - TELEPHONE: (317) 634-5561 • FAX: (317) 631-6423 !f/��f / / 'AN Es OAM Ori>�RIUHh 'Y RAPLOtER. tfQl1[Illlthq . As-WRANCG CSF SP:I1t 4 It-TmRiTV • RE PotgsimvTy •;IN CONStRUCtION RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 6/21/17 Work Performed: 4% Cement Stabilization occurred 6/19/17 CONTRACT: 16 -ENG -39 PROJECT: 106th St. & Towne Rd. Roundabout FORCE ACCOUNT/EXTRA WORK FOR: Soil sample analysis from All & W itziq recommend that 4% cement be utilized to stablize the subgrsde at 106th &_Towne Rd. Additional price is to utilize 4% cement rather than kiln dust. Specialties Company to perform the work. Price provided is for the material cost difference only. LABOR 109.05 (b)(1) HOURS EMPLOYEE Regular Overtime Doublelime TOTAL RATE I EXTENSION CARPENTER 0.00 $27.491 $0.00 _ CARPENTER FOREMAN 0.00 $28.99 $0.00 COMBINAT,ON 0.00 $29.76 $0.00 FINISHER 0.00 $25.72 $0.00 FOREMAN 0.00 $35.05 $0.00 LABORER 0.00 $24.72$0-00 X MECHANIC _ 0.00 $35.05 _ $0.00 OPERATOR (103) 0.00 $34.05 $0.00 OPERATOR (841) 0.00 $32.55 $0.00 OPERATOR OILER (103) 0.00 $29.91 $0.00 OA TECH 0.00 $24.72 _ $0.00 SUP ERI NTENDENTIPROJECT MANAGER 0.00 S44051 $0.00 TEAMSTER 0.00 1 $26.411 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.50 % x LINE (2) $0.00 (3) EMPLOYEE HOURS % X UNE (2) RATE EXTENSION CARPENTER 0.00 X $21.25 = $0.00 CARPENTER FOREMAN 000 X $21.25 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 X $13.96 = $0.00 FOREMAN 0.00 X $17.66 = $0.00 LABORER 0.00 X $13.96 = $0.00 MECHANIC 0.00 X $17.66 = $0.00 OPERATOR 0031 0.00 X $17.66 = $0.00 OPERATOR (841) 000 X $20.51 = $0.00 OPERATOR OILER (103) 0.00 X $17.66 = $0.00 OA TECH 000 X $1:1.96 = $0.00 SUP ERI NTENDENTIPROJECT MAN 0.00 X $17.66 = $0.00 TEAMSTER 0.00 X $14.91 = $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 4,70 % X UNE (2) $0.00 (5) BODILY INJURY/ PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4. 5, 6, 7, 8 & 9 $0.00(10) 20%xLINE (10) $0.00 (11) GRAND TOTAL LABOR LINES (10) * (11) $0.00 (12) Page 1 of 2 6TERIAL 109.05 [b Fucriasea or Manufactured Description Ouanlity UNt Unit Price Extenstlon S S S $ S S S S S i S S MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL LINE (111))+ (19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) f � �1�JZi-�itiT�d�3C7: X11 $0.00 (1a) $0 00 (19) $0.00 (20) $0.00 (21) 50.00 (22) Equipment# CONTRACTOR OWNEDEOUIPMENT FHWA HOURLY RATE HOURS EXTENSION 50.00 $0.00 $0.00 50.00 so.00 $000 $0.00 $0.00 $0.00 $0.00 so.00 $0.00 $0.00 $0.00 $000 50.00 $0.00 50.00 Tusking - Sina¢m Time $0.00 Trucking • Over Time $0.00 �• Trucking - Double Time i0 00 TOTAL EQUIPAIlENT $0.00 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0,00 (25) TOTAL LUES (23) + (24) + (25) (28) 12 %x LINE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (28) SUBCONTRACTORS 109.051bxB1 TOTAL SUBCONTRACT WEEK ENDING $0.93 (29) 10 % x LINE (30) $3.000.00 OR LESS $0.09 (31) 7 % x LINE (30) OVER $3.000.OD $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) 51.02 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12). (17). (22), (28) 9 (33) $1.02 (34) % OF BOND RATE BASED UPON LINE (34) $0.00 (35) 10 % x LINE (35) $0.00 (36) TOTAL EXTRA WORK LUES: (34) + (35) + (36) $1.02 (371 Page 2 0( 2 Alt i& Witzig Engineering, Inc. 410-; 1Ve,,t 91Icl' Stivet • C'artncl. Indiana 46()3' i i 1 r) S 75 ;{lo) . Ftix f 1 7) 8-0-37i)5 Tested For: Date: 06-16-17 Mr. Joe Hite, PE Specialties Company, LLC Our Project No.: TZ 17057 -LTR 9350 East 30'' Street Indianapolis, IN 46229 Project: 106'' St. & Towne Rd. Intersection Improvements Project No. 16 -ENG -39 Carmel, IN Hamilton County Executive Summary Per your request, Alt & Witzig Engineering has performed a soil -chemical modification study on the soil types obtained from the above referenced project to be utilized at subgrade elevation per project specifications. The chemical modifier utilized in the testing procedures is listed below: • Cement - Essroc Materials, Inc — Logansport, IN Subgrade Treatment Depth Recommendation —14" % Chemical Recommended — 4% Cement Sample Sample Spread Optimum As Received Identification Classification Rate Moisture Moisture Lb/yd ^2 Content (%) Content Sample #1 A-4 t) CLAY LOAM 52.0 12.1% 14.5% Sample #2 A-4 (0) LOAM 52.9 11.3% 12.5% Uffic,•c; Sid"it4tuer /►ncaci•�r�rfnn niid Fun►tdurion Cngiiaec•rin;,• i'h! xm:,u. t:, i • t):r,t,•„ 1! .• Cor"traction Alc►leriuls 7'e.stin, card A►spertion Il d!:x:a:,•s:, • i Enriro►ane►tlof Serrhvc % 106th St. & Towne Rd. Intersection Improvements Specialties Company LLC June 16, 2017 Page 2 Project Description According to the contractor, this project includes intersection improvements of 1061' St. & Towne Rd. located in Carmel, IN Hamilton County. The following soil -chemical modification study was conducted for soils being utilized at the design subgrade elevation in accordance with project specifications. Sample Collection Two (2) soil samples were collected and delivered to our laboratory by a Specialties Company LLC representative. According to the contractor, the samples collected are representative of the soils to be utilized at the design subgrade elevation. The samples did not have identification or reference locations and were identified only as Sample #I & Sample #2. Laboratory Testing By request of the contractor, laboratory testing was performed in accordance with INDOT's most recent publication of their "Design Procedures for Soil Modification or Stabilization". Soluble sulfate contents were below 1,000 ppm, and Loss on Ignition (LOI) was not necessary based upon visual examination. Based on the low plasticity of the samples received, only cement was utilized in the testing procedures. Moisture density relationships and unconfined compressive strength testing were performed in accordance with INDOT guidelines using a minimum of 4% Cement by dry unit weight. Subgrade Treatment Recommendations Based on the laboratory results, the soils represented met the 100 psi strength gain requirement with the use of 4% Cement by dry unit weight. Therefore, we recommend 4% Cement by dry unit weight be used for the subgrade treatment of this project. 14" Chemical Soil Modification — 4% Cement Sample Sample Spread Optimum As Received Identification Classification Rate Moisture `loisturc Lb/yd ^2 Content %) Content %) Sample #1 A -4_(I) CLAY LOAM 52.0 12.1% 14.5% Sam le #2 A-4 0 LOAM 52.9 11.3% 12.5% 1060' St. & Towne Rd. Intersection Improvements Specialties Company LLC June 16, 2017 Page 2 Final Considerations Chemically treated soils must be at or above the optimum moisture content as determined by the soil -chemical mixture. Site specific conditions, including anticipated weather during treatment, stability of foundation soils, and in-situ moisture contents must be considered prior to subgrade treatment. Site conditions that would adversely affect the chemical treatment should be brought to the immediate attention of the project manager. Approved chemicals to be incorporated in the field for stabilization or modification of the subgrade shall be accomplished per project specifications. The contractor shall account and correct for all losses and equipment efficiencies that occur in the field to assure that the proper chemical percentage is achieved. Please find a copy of our test results enclosed with this letter. Sincerely, .7J3a�� ,✓Gi51 E�4N�., �%�� v / g4. , Na. Joshua W. Tinkle, E.I.T. ;� Q f STAT; wF• ,F Ellen Anne W. Wilkinson, P.E. "10045 Emphi.rra Owned' POST OFFICE BOX 276 • INDIANAPOLIS, INDIANA 46206 • WWW.RIETHRr1-FYCOM Notes/Remarks: Jason, Rleth-Riley Construction Company, Inc. respectfully submits, for your approval, a price to install geogrid. Installation of geogrid is to stabilize subgrade. Gradex, Inc. is setup to perform the work. Item LETTER OF TRANSMITTAL TO: Clark Dietz DATE: 6/28/17 8900 Keystone Crossing, Suite 900 EWA Indianapolis, IN 46240 PROJECT: 16 -ENG -39:1061t, & Towne Rd. RAB $2.18 JOB #: 3200698 ATTN: Jason M. Buck RE: Geogrid We Are Sending: Submitted For: Action Taken: Shop Drawings X Approval Approved as Submitted Letter Your Use Approved as Noted Prints/Plans As Requested Returned After Loan X Change Order Review and Comment Resubmit Copies Samples Submit Copies Specifications Sent Via: Email Returned Other X Attached Returned for Corrections Separate Cover Via: Due Date: Notes/Remarks: Jason, Rleth-Riley Construction Company, Inc. respectfully submits, for your approval, a price to install geogrid. Installation of geogrid is to stabilize subgrade. Gradex, Inc. is setup to perform the work. Item Description Quantity Unit Unit Price Extension EWA Geogrid, Type IB 355.33 SY $2.18 $774.62 TOTAL CC: 3200698 - Job File John Tuddy - RR General Superintendent Paul Ruschmeier - RR Superintendent $774.62 Signed: Michael Compt - Project anager 1751 W. MINNESOTA - INDIANAPOLIS, INDIANA 4622 i - "TLLLPHONE: (317) 634-5501 - FAX: (317) 631-6423 (?(,n ltnIMC7 . . . As5URANCE OF SP -Al 0 IMM-RITY ♦ RESPONSIL5 AVe * ird CON`:IPUL1164 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 5128/17 Work Performed: Work has been completed to date. CONTRACT: 16 -ENG -39 PROJECT: 106th St. 8 Towne Rd. Roundabout FORCE ACCOUNT/EXTRA WORK FOR. Installation of geoorid to stablize yeilding subgrade, ES travel lanes on west lag of roundabout. Gradex. Inc. to perform the work Approximate quantity to be performed is 355.33 SY Proposal price $774.40/355.33SY = $2.181SY. LABOR 109.05 (6)(1) HOURS EMPLOYEE Regular Overtime Doublelime TOTAL RATE EXTENSION CARPENTER 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 $28.99 $0.00 COM13INATION 0.00 $29.76 $0.00 FINISHER 0.00 $25.72 $0.00 FOREMAN 0.00 $35.05 $0.00 LABORER 0.00 $24.72 $0.00 MECHANIC 0.00 $35.05 $0.00 _ OPERATOR (103)0.00 $13.96 = $34.05 $0.00 OPERATOR (641) - -+ _ 0.00 $32.55 $0.00 OPERATOR OILER (103) 0.00 $29.91 $0.00 OA TECH 0.00 $24.72 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $44.05 $0.00 TEAMSTER 0.00 $28.41 $0.00 FRINGE'S TOTAL LA50R FICA 7.50 % x LINE (2) 50.00 (2) $0.00 (3) EMPLOYEE HOURS $0.00 (4) RATE EXTENSION CARPENTER 0.00 x $21.251 $0.00 CARPENTER FOREMAN 0.00 X $21.25 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN 0.00 x $17.66 = $0.00 LABORER 0.00 X $13.96 = $0.00 MECHANIC 0.00 x $17.66 = $0.00 OPERATOR (103) 0.00 X $17.66 = $0.00 OPERATOR (841) 0.00 x $20.51 = $0.00 OPERATOR OILER (103) x $17.66 = $0.00 Q4 TECH _0.00 o.00 x $13.96 = $0.00 SUPERINTENDENT/PROJECT MANI 0 0o X $17.66 $0.00 TEAMSTER 0.00 x $14.91 = $0.00 Page 1 of 2 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 6.72 % X LINE (2) $0.00 (5) BODILY INJURY / PROPER'Y DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) S000 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE q3) _ $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $0.00 (10) 20 % x LINE (10) _ $0.00(11) GRAND TOTAL LABOR LINES (10) «(11) $0.00 (12) Page 1 of 2 MATERIAL 109.0516)(31 rcnased or ManufeclurW Descriphan OuanNly Unit Unit Price E)denskn f S f s f $ s s S $ f S MATERLhLS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE(18)+(19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LRE (20) + (21) $000 (18) $0.00 (19) $0.00 (20), $0.00 (21) $0.00 (22) Equipment 0 CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION $0.00 $0.00 $0.00 $0.00 so oo SO 00 so.00 $0.00 $0.01) 50.00 $0.00 $0.00 $0.00 WOO $0.00 $0.00 $0.01) $0.00 Trucking - Sldeght Tme so= Tnxlcing - Ooer Time $0.00 Tnxdmlg - UMM6 TIM4 $0.00 TOTALEOUIPMENT $0.00 (23) TOTAL TRUCKMO $0.00 (24) FUEL. LUBRZANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $0.00 (28) 12 % x LINE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT. LINES (26) 4 (27) $0.00 (28) Fit =�►• Laii �r rr TOTAL SUBCONTRACT WEEK ENDING $704.00 (29) 10 % x LINE (30) $3.000.00 OR LESS $70.40 (31) 7 % x UNE (30) OVER $3.000 00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+(31)+(32) $774.40 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LNES (12). (17). (22). (28) 8 (33) $774.40 (34) % OF BOND RATE BASED UPON LINE (34) $0.00 (35) 10 % x LINE (35) $0.00 (36) TOTAL. EXTRA WORK LINES: (34)+(35) • (36) $774.40 (37) Page 2 of 2 Recapitulation Sheet Quotation 108th & Towne - Carmel, IN 16Hili11111 Gradex Job #17111 Geog`Q for Undercuts? d�1'7tZ#�1:7 Desaiotion QuantJty Unit Unit Price Material Cos Unit Cost Et rsdW Unit Cost Extergted i n Contract EAgtded Unit Price Unit Cos Sub Price Sub $ $ $ $ $ Geo rid - 13'x 246' Roll 1 ROLA. $ 500.00 $ 500.00 $ - $ - $ $ Labor 2 HR $ $ 60.00 $ 120.00 $ $ $ $ - $ $ $ $ Is $ $ - $ $ Sub Totals JS 500.001 1 $ 120.00 1 $ - $ $ Sales Tax Allowable Mark up NIA 0% $ 12% $ 60.00 20% $ 24.00 12% $ - $ 15% $ Sub Totals 5 560-00 $ 144.00 $ $ Bond & Insuranoe Premiums (Actual Cost) -.75% $ B & I Mark Up $ - Grand Total $ 704.00 Gradex, Inc. l% — "MON Employer owned" POST OFFICE 130X 276 - INDIANAPOLIS, WDIANA 46206 • WWW.RIETHRILEY.COM LETTER OF TRANSMITTAL TO: Clark Dietz DATE: 7117/2017 8900 Keystone Crossing, Suite 900 Indianapolis, IN 46240 PROJECT: 16 -ENG -39: 106m & Towne Rd. RAB ATTN: Jason M. Buck We Are Sending: Shop Drawings Letter Prints/Plans X Change Order Samples Specifications Other. Notes/Remarks: Jason, JOB #: 3200698 RE: P-1 Cabinet Fnd., 200 AMP Meter Base & 2" Galvanized Steel Conduit Submitted For: Action Taken: X Approval Approved as Submitted Your Use Approved as Noted As Requested Returned After Loan Review and Comment Resubmit Copies Submit Copies Sent Via: Email Returned X Attached Returned for Corrections Separate Cover Via: Due Date: Rieth-Riley Construction Company, Inc. respectfully submits, for your approval, prices for the installation of 1 EA, P-1 Cabinet Foundation, 1 EA -- 200 AMP Meter Base and 50 LF of 2" Galvanized Steel Conduit. These extra work items are to re-establish an electrical service point. Rieth-Riley Construction request 3 additional days for this extra work at 106"' and Towne Rd Roundabout. The three days are for the install of the cabinet foundation, plus cure time. The 200 AMP base and conduit may be installed during the foundation cure time. Item Description Quantity Unit Unit Price Extension EWA 200 AMP Meter Base 1 EA $550 $550.00 EWA 12" Galvanized Steel Conduit 50 LF $23.10 $1,155.00 DV�1DA71 0/J wr4 5 /IE��� ►�-D L�rtLi NL; [ trikl it (� Cx sr uC� TOTAL ' ��x��r-t��► 1 CC: 3200698 - Job File Signed: John Tuddy - RR General Superintendent Michael Comp n - Project Manager Paul Ruschmeier - RR Superintendent 17.51 W. bIINNESU'iA - INDIANAPOLIS, INDIANA 4622t • TELEPHONE: (3 0) 634-5561 • FAX: (317) 631-6423 // 'AtJ E:IUA: Gti�Pt7�I�Jt1:('r Ff.1f40VE2' Ce -_,n lmthi . AsSuRANCE OF SMA - It-lrFCR11Y • F;t:5t on:'IelurY - 1.4 C'ur'lmMX:110N RIETH-RILEY CONSTRUCTION _ EXTRA WORK AGREEMENT _ DATE: _ 7/17/17 Work Performed: Work not performed to date CONTRACT 16 -ENG -39 PROJECT: 1061h and Towne Road Roadabout FORCE ACCOUNT/EXTRA WORK FOR: Installation of 1 EA, P-1 Cabinet Foundation at NE corner of roundabout LABOR 109.05 (bl(1) HOURS EMPLOYEE Regular Overtime Ooublellme TOTAL RATE EXTENSION CARPENTER 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 $28.99 $0.00 COMBINATION 0.00 $29.76 $0.00 FINISHER 0.00 $25.72 $0.00 FOREMAN 1 0.00 $35.05 $0.00 LABORER 0.00 $24.72 $0.00 MECHANIC 0.00 $35.05 $0.00 OPERATOR (103) 0.00 $34.05 $0.00 OPERATOR (641) 0.00 $32.55 $0.00 OPERATOR OILER (103) 0.00 $29.911 $0.00 CA TECH 0.00 $24.72 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $44.05 $0.00 TEAMSTER 0.00 $28.41 $0.00 FRINGES TOTALLABOR FICA 7. EO 5o a LINE (2) $0.00 (2) $0.00 (3) EMPLOYEE HOURS % x LINE (2) RATE EXTENSION CARPENTER 0.00 X $21.25' _ $U.00 CARPENTER FOREMAN 0.00 X $21.25 = $0.00 COMBINATION 0.00 X $14.91 = $0.00 FINISHER 0.00 X $13.96 = $0.00 FOREMAN 0.00 x $17.66 = $0.00 LABORER 0.00 X $13.961 $0.00 MECHANIC 0.00 X $17.66 = $0. GO OPERATOR 003) 0.00 X $17.66 = $0.00 OPERATOR (841) 0.00 X $20.51 _ $0.00 OPERATOR OILER (103) 0.00 X $17.66 = $0.00 OA TECH 000 x $13.95 = $0.00 SUPERINTENDENT/PROJECT MAN 0.00 X $17.661 $0.00 TEAMSTER 1 0.00 1 x 1 $14.911 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5.72 % x LINE (2) $0.00 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 5.80 % x LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.65 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % x LINE (2) $0.00 (0) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE M3) $0.00 (9) TOTAL LINES 2, 3, 4. S. 6. 7, 6 & 9 $0.00 (10) 20 % x LINE (10) $0.00 111) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109,05 (b j3) rurcnaseo or Manufactured Descnotion Ouartity UN UNt Price EMensllon f S _ f S S f S S S S S S MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+ (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALSLINE (20) r (21) EQUIPMENT 109.05 (b)(4 $000 (18) $000 (19) $0.00 (20) $0.00 (21) $0,00 (221 Epulprrem N CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION -- W.00 (24) som $0.00 TOTAL LINES (23) + (24) + (25) s0 oo $0.00 SOOO (27) 7000 $000 $0.00 $000 $0.00 so. D0 _ $0.00 $0.00 $0.00 so oo — $0.00 so -00 $0.00 $0.00 Tnrarxg - Stnagnt Time $0.00 0.00 huckf-CRerlime $0.00 SU.UU Tn¢king - Double Time $0.00 bu I x II SUBCONTRACTORS 109.05 lbX61 TOTAL EQUIPMENT $000 (23) TOTAL TRUCKING -- W.00 (24) FUEL. LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) (26) 12 %x LINE (26) SOOO (27) GRAND TOTAL FOR EQUIPMENT. LINES (26) +(27) (28) E1 TOTAL SUBCONTRACT WEEKENDING S1, 100.00 (29) 10%xLINE (30)53,000.00ORLESS $110.00 (31) 7 %x LINE (30) OVER $3,000,00 50.00 (32) GRAND TOTAL FOR SUBCONTRACTORS LINES (30)+(31) - (32) $1,210.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (121. (17), (22), (28) A (33) $1.210.00 (34) 0 % OF BOND RATE BASED UPON LINE (34) $0.00 (35) 10 % x LINE (35) $0•00 (36) TOTAL EXTRA WORK LINES' (34) ` (36) • (36) $1.210.00 (37) Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 7/17117 Work Performed Work not performed to date CONTRACT: 16 -ENG -39 PROJECT: 106th and Towne Road Ro3dabout _ FORCE ACCOUNT/EXTRA WORK FOR: Installation of 1 EA. 200 AMP meter base. LABOR 109.05 (b)(1) HOURS EMPLOYEE Regular Overtime 13mbletime TOTAL RATE EXTENSION CARPENTER 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 $28.99 $0.00 COMBINATION 0.00 $29.76 $0.00 FINISHER 0.00 $25.72 $0.00 FOREMAN 0.00 $35.05 $0.00 LABORER 0.00 $24.72 $0.00 MECHANIC 0.00 $35.05 $0.00 OPERATOR (103) _ _ 0,00 $34.05 $0.00 OPERATOR (841) 0.00 $32.55 $0.00 OPERATOR OILER (103) 0.00 $29.91 $0.00 DA TECH 0.00 $2472 $0.00 SUPcR;NTENDENT/PROJECT MANAGER 0.00 $44.05 $0,00 TEAMSTER 0.00 $28.41 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.80 x LINE (2) $0.00 (3) EMPLOYEE HOURS % x LINE (2) RATE EXTENSION CARPENTER 0.00 X $21.25 - $0.00 CARPENTER FOREMAN 0.00 X $21.25 = $0 00 COMBINATION 0.00 X $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN 0.00 X $17.66 = $0.00 LABORER 0.00 X $13.96 = $0.00 MECHANIC 0.00 X $17.66 - $0.00 OPERATOR (103) 0.00 x $17.66 = $0.00 OPERATOR (841) 0.00 x 520.51 = $000 OPERATOR OILER (103) 0.00 x $17.66 = $0.00 CA TECH 0.00 X $13.961 $0.00 SUPERINTENDENTIPROJECT MAN 0.00 X $17.661 $0.00 TEAMSTER 1 0.00 X 1 $14.911 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5.72 % x LINE (2) $0.00 (5) BODILY INJURY I PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (5) S1 ATE UNEMPLOYMENT 3.85 % x LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (B) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE p3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6. 7, 8 & 9 $0.00 (10) 20%xLINE (10) S0.00(111 GRAND TOTAL LABOR LINES (10) +(11) $0.00 (12) Page 1 of 2 MATERIAL 109.05 lb)( Purchoseaor Menulectured Descdptbn Ousnoty Unit Unit Phde Fnertstion S f a s : s a s s s s s MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL LNE(1aJ+(191 12 %x LINE (20) GRAND TOTAL FOR MATERIALS' LME (201+ (21) 60-00 (18) $0.00 (19) $0.00 (z0) $0.00 (21) $0.00 (22) Equipment K CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION $000 $0.00 $0.00 s0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 $0.00 50.00 so.00 $0.00 so.00 $0.00 $0.00 sa.00 Tnuking - S1negM Time $0.00 Trudtirg • Orer Time 50.00 0.00 TNckinq - Doude Iime $0.00 TOTALEOUPMENT $0.00 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0,00 (25) TOTAL LINES (23) + (24) + (25) 3W.W (28) 12 % x LIE (26) an GRAND TOTAL FOR EQUIPMENT: LINES (26)+ (27) $0,00 (28) SUBCONTRACTORS 109.05/bX61 TOTAL SUBCONTRACT WEEK ENDING $500.00 (29) 10 % x LINE (30) UOOOAO OR LESS $50.00 (31) 7 % x LINE (30) OVER $3.000.DO $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $550.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12). (17). (22). (28) a (33) $550.00 (34) .0_: % OF BOND RATE BASED UPON LINE (34) $0.00 (35) 10%xLI14E(351 $0.00 (36) TOTAL EXTRA WORK LINES: (34) + (35) • (36) $550.00 (37) Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 7/17/17 Work Performed: Wort not performed to date CONTRACT: 16 -ENG -39 PROJECT: 106th and Towne Road Roadabout FORCE ACCOUNT/EXTRA WORK FOR: Installation of 50 LF of 2" Gal. Steel Conduk. $23.10/LF LABOR 109.05 (b ff) HOURS EMPLOYEE ReguMr Overtime Dwblethe TOTAL RATE EXTENSION CARPENTER 0.00 $27.49 $0.00 CARPENTER FOREMAN 000 $28.99 $0.00 COMBINATION 0.00 $29.76 $0.00 FINISHER 0.00 $25.72 $0.00 FOREMAN 0.00 $35.05 $0.00 LABORER 0.00 $24.72 $0.00 MECHANIC 0.00 $35.05 $0.00 OPERATOR (103) 0.00 $34.05 $0.00 OPERATOR (841) 0.00 $32.55 $0.00 OPERATOR OILER (103) 0.00 $29,91 $0.00 4A TECH 0.00 $24.72 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $44.05 $0.00 TEAMSTER 0.00 $28.41 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.50 % x LINE (2) $0.00 (3) EMPLOYEE HOURS % x UNE (2) RATE EXTENSION CARPENTER 0.00 X $21.25 = $0.00 CARPENTER FOREMAN D.00 x $21.25 = $0.00 COMBINATION D.00 X $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN 0.00 X $17.66 = $0.00 LABORER 000 X $13.96 = $0.00 MECHANIC 0.00 x $17.68 = $0.00 OPERATOR (103) 000 x $17.86 - $0.00 OPERATOR (841) 0.00 x $20.51 = $0.00 OPERATOR OILER (103) 0.00 x $17.66 = $0.00 OATECH 0.00 x $13.98 = $0.00 SUPERINTENDENTIPROJECT MAN 0 00 X $17.661 $0,00 TEAMSTER 1 0.00 x $14.911 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5:72 % x UNE (2) $0.00 (5) BODILY INJURY/ PROPERTY DAMAGE INSURANCE 5.80 % X UNE (2) $0.00 (6) STATE UNEMPLOYMENT 3:55 % X UNE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (5) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4.5.6, 7, 8 S 9 $0.00(10) 20%xLINE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00112) Page 1 of 2 MATERIAL 109.05 fbK31 Purchased or Manufactured Descnutlon Quantity UNI Unit Price Exlensflon S i s s s s s s s s s s MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL LINEIIBl+1t9) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LME (201+ (21) $0.00 (ta) $0.00 (1s) $0.00 (20) $0.00 (21) $0.00 (22) Equlpmeru 0 CONTRACTOR OWNED EOUIPMENT FHWA HOURLY RATE HOURS EXTENSION 50.00 50.00 $0.00 $0.00 $0.00 $0,00 $0.00 10.00 So.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Woo $0.00 $000 Trucking - Swgfq Time fD.00 Tnuking • OwrTime $0.00 40.001 Truckag - DoWe Time $0.00 *U VVI TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 12 % x LME (261 GRAND TOTAL FOR EOUIPMENT: LINES (26) + (27) KIL-urks" ajL ' i , rr $0.00 (23) SU.UU (24) (25) 0.00 (26) (27) 00 (26) TOTAL SUBCONTRACT WEEKENL74NG $1,050.00 (29) 10 % x LINE (30) 53.000.00 OR LESS $105.00 (31) 7 % x UNE (30) OVER 53,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES 130)+(31)+(32) $1,155.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LIDS (12).117), (22). (26) 6 (33) $1.155.00 (34) 0 . % BOND RATE BASED UPON LME (34) $0.00 (35) 10 % x LINE (36) $0.00 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $1.156.00 (37) Page 2 of 2 6 ..rare k,apl').Vve a„ I„ -d POST OPI'ICE BOX 276 - INDIANAPOLIS, INDIANA 46206 • WWW.RIETHRtl,EY.COM LETTER OF TRANSMITTAL TO: Clark Dietz 8900 Keystone Crossing, Suite 900 Indianapolis, IN 46240 ATTN: Jason M. Buck DATE: 7/27/17 Action Taken: 16 -ENG -39:10611 & Towne Rd. RAB PROJECT: Approved as Submitted Letter 16 -ENG -53 -.116th & Towne Rd. RAB JOB #: 3200698/699 RE: Street Signs Per Carmel Standard We Are Sending: Submitted For: Action Taken: Shop Drawings X Approval Approved as Submitted Letter Your Use Approved as Noted Prints/Plans As Requested Returned After Loan X Change Order Review and Comment Resubmit Copies Samples Submit Copies Specifications Sent Via. Email Returned Other: X Attached Returned for Corrections Separate Cover Via: Due Date: Notes/Remarks: Jason, Rieth-Riley Construction Company, Inc. respectfully submits, for your approval, a price to install 2 EA, street signs per Carmel Standards. Please note that $824.28 of material was incurred by Signal Construction, Inc. prior to the requested change at 1060h & Towne Rd. SCI, also has incurred material cost at 11611, & Towne Rd of $824.28 TOTAL S'6N5 AL44-A0 PA1v h5 ?atCM cn/T914LT ---66,96&", desr WILL- aL 5kFPAQ-Af" ! PLACt /A/ A,r-T-c�n+ir C. 0. 9 4 so CC: 3200698 - Job File Signed: John Tuddy - RR General Superintendent Michael Comp n - Project anager Paul Ruschmeier - RR Superintendent 1751 W. MINNESMA - INDIANAPOLIS, INDIANA 46221 - TELEPHONE: (317) 634-5561 - PAX: (317) 631-6423 /� J 'AN EQUA: UPf'OHIt?111Y EWIO*(1:R' Conn !?uM,q . . ASSURANCE OF SK111 • IN MPITY • Rrispc*istB ury 0 1N CONSTROC-T16N RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 4127/17 Work Performed Work not completed to date. CONTRACT: 16 -ENG -39 PROJECT. 106th & Towne Rd. Roundabout _ FORCE ACCOUNT/EXTRA WORK FOR: Installbon of 2 EA street signs per Camiel standards. 2 EA a. $2.607.65 = $5.215.30 LABOR 109.05 (b)(1) HOURS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 $28.99 $0.00 COMBINATION 0.00 $29.76 $0.00 FINISHER 0.00 $25.72 $0.00 FOREMAN 0.00 $3505 $0.00 LABORER 000 $24.72 $0.00 MECHANIC 000 $35.05 $0.00 OPERATOR (103) 0.00 $34,05 $0.00 OPERATOR (841) 0.00 $32.55 $0.00 OPERATOR OILER (103) 0.00 $29.91 $0.00 CA TECH 0.00 $24.72 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $44.05 $0.00 TEAMSTER 0.00 1 $28.41 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.50 % x LINE (2) $0.00 (3) EMPLOYEE HOURS % X LINE (2) RATE EXTENSION CARPENTER 0.00 X $21.25 = $0.00 CARPENTER FOREMAN 0.00 X $21.25 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 X $13.96 = $0.00 FOREMAN 0.00 X $17.66 = $0.00 LABORER 0,00 X $13.96 = $0.00 MECHANIC 000 x $17.66 = $0.00 OPERATOR 003) 0.00 X $17.66 = $0.00 OPERATOR (841) 0.00 X $20.51 = $0.00 OPERATOR OILER (103) 0.00 $17.66 = $0.00 CA TECH 0.00 _X X $13.96 = $0.00 SUPERINTENDENT/PROJECT MAN 0.00 1 X $17.661 $0.00 TEAMSTER 1 0.00 1 x 1 $14.911 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5.72 % X LINE (2) $0.00 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3 4, 5, 6, 7, 6 & 9 $0.00 (10) 20 %x LINE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00 (12) Page 1 of 2 MATERIAL 109. 05 b 3 urcnasea or Manufactured Description Quantity Unit Unit Price Extenslion s 3 a s s s s s s s s s MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL LINE(16)+(19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) E(�UIPIdENT 109.05 fb)(4) 30.00 (ie) $0 00 (19) 50.00 (20) $0.00 (21) 50.00 (22) Equlpm ant 0 COM.RACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION $0,00 (24) 50.00 $0.00 - - $0.00 $0.00 -0.00 (27) $0.00 $000 so.o0 $0.00 so.00 $0.00 50.E _ _ $0.00 50.00 $0.00 - $0.00 x0.00 $0.00 $0.00 Tr1JCNing - SMaght Time $0.00 Tn,cking -over Tine $0.00 $0.00 Tnx;" - Double Time W SUBCONTRACTORS 109_05 TOTAL EQUIPMENT $0.00 (23) 70TALTRUCKING $0,00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) 0.00 (28) _ 12%xLVE (26) -0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) (28) $4.790.00 TOTAL SUBCONTRACT WEEK ENDING _ $4,790.00 (29) 10 % x LINE (30) 53,000.00 OR LESS $300.00 (31) 7 % x LINE (30) OVER $3.000.00 S 125.30 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (3 1) + (32) 55.215.30 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17). (22),(28) & (33) -- $5,21530 (24) % OF BONE) RATE BASED UPON LINE (34) $0.00 I'm 10 % x LINE (35) $000 p6l TOTAL EXTRA WORK LINES: (34) + (35) + (36) $5.21530 (371 Page 2 of 2 City of Carmel Project 16 -ENG -39 106th Street and Towne Road RAB CHANGE ORDER #1 Extra work and revisions to existing contract items for the proposed roundabout. Contract Price prior to this Change Order $1,196,604.12 ---- --- Contract Price will be increased/decreased by this Change Order S17,572.73 New Contract Price including this Change Order $1,214,176.85 Amount Adjusted Contract Cumulative % Change _ Price from Original Contract Original Contract $1,196,604.12 N/A N/A COI $17,572.73 $1,214,176.85 1.5% Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 08/15/17 Re: C.O. #1 106th Street and Towne Road RAB Project #16 -ENG -39 Doug, please find attached 2 originals of same change orders for project #16 -ENG -39 106th St. and Towne RAB Project. Please review & initial for the next BPW Meeting. Change Order #1 - Original Contract Amount: $1,196,604.12 Increase: $17,572.73 New Contract Amount: $1,214,176.85 Thank you, Lisa Scott 0 Page 1