HomeMy WebLinkAbout030-00 SP Planting Details- 2
3
I
5 ' 6 i 7 i 8 i 9 � 10 i 11 � 12 - - � - - - 13 i - -14 - -� 15
THE BEST METHOD IS TO PLACE THE PROTECTIVE FENCE AT THE DRIPLINE
OF THE TREE OR AT THE MAXIMUM DISTANCE POSSIBLE FROM ALL SIDES OF THE TRUNK.
B
IF METHOD 'A' IS NOT POSSIBLE BECAUSE OF OBSTRUCTIONS,
METHOD 'B' IS TO PLACE A TRIANGULAR BARRIER AROUND THE TRUNK.
C
IF EITHER 'A' OR 'B' ARE NOT POSSIBLE, TRUNK PROTECTION CAN BE
ACHIEVED BY WIRING LATH TO THE TRUNK TO PREVENT DAMAGE FROM EQUIPMENT CONTACT.
IF THIS METHOD IS USED, LIMIT EQUIPMENT TRAFFIC IN ROOT ZONE TO MINIMIZE SOIL COMPACTION.
NOTE:
TRIMBING LOWER LIMBS PRIOR TO CONSTRUCTION MAY IMPROVE SURVIVAL RATE.
CONSULT AN ARBORIST PRIOR TO PERFORMING WORK.
TREE PROTEC'T'ION DETAIL
10
.qCAT.F• NnT TO SC.AT.T.
REMOVE ANY TVMNE OR SYNTF"^^
TAPES FROM SHRUB TRUNK
REMOVE BURLAP FROM TOP
1/3 OF ROOTBALL
3' SAUCER FILLED WITH SHR.
BARK MULCH EXTENDED 6' F
BACKFILL WITH A MIXTURE 01
5D% TOPSOIL, 25% ORGANIC
COMPOST AND 25% PEAT MO
SHRUB DETAIL
6
10
SCALE: NOT TO SCALE
WEED BARRIER
FINISH GRADE
:XISTING SUBSOIL OR
.OMPACTED BACKFILL
6"
METAL STAKE
CORPORATION AND ARE NOT TO BE USED OR REPRODUCED
PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDE
1998, The Schneider Corpora
VARIES
12 GUAGE WIRE
DRIPLINE
/
C/) 0
-w
L
46226-6518 La:
317-898-8282 GL`
co 0:
2 PLY HOSE
SAUCER
IyQjE;
DO NOT PLACE MATERIALS OR
0
t
TREE
EOUIPMIENT LOW TREE.
/
'
Computer Files Sheet No.
SOUTHWEST OF TREE TRUNK
WEED BARRIER
M],M
/
FINISH GRADE
SNOW FENCE
DIST CE
(OR OTHER BARRIER)
\
TREE TRUNK
AND ORGANIC SLOW RELEASE
EXISTING SUBSOIL OR
FERTILIZER
COMPACTED BACKFILL
THE BEST METHOD IS TO PLACE THE PROTECTIVE FENCE AT THE DRIPLINE
OF THE TREE OR AT THE MAXIMUM DISTANCE POSSIBLE FROM ALL SIDES OF THE TRUNK.
B
IF METHOD 'A' IS NOT POSSIBLE BECAUSE OF OBSTRUCTIONS,
METHOD 'B' IS TO PLACE A TRIANGULAR BARRIER AROUND THE TRUNK.
C
IF EITHER 'A' OR 'B' ARE NOT POSSIBLE, TRUNK PROTECTION CAN BE
ACHIEVED BY WIRING LATH TO THE TRUNK TO PREVENT DAMAGE FROM EQUIPMENT CONTACT.
IF THIS METHOD IS USED, LIMIT EQUIPMENT TRAFFIC IN ROOT ZONE TO MINIMIZE SOIL COMPACTION.
NOTE:
TRIMBING LOWER LIMBS PRIOR TO CONSTRUCTION MAY IMPROVE SURVIVAL RATE.
CONSULT AN ARBORIST PRIOR TO PERFORMING WORK.
TREE PROTEC'T'ION DETAIL
10
.qCAT.F• NnT TO SC.AT.T.
REMOVE ANY TVMNE OR SYNTF"^^
TAPES FROM SHRUB TRUNK
REMOVE BURLAP FROM TOP
1/3 OF ROOTBALL
3' SAUCER FILLED WITH SHR.
BARK MULCH EXTENDED 6' F
BACKFILL WITH A MIXTURE 01
5D% TOPSOIL, 25% ORGANIC
COMPOST AND 25% PEAT MO
SHRUB DETAIL
6
10
SCALE: NOT TO SCALE
WEED BARRIER
FINISH GRADE
:XISTING SUBSOIL OR
.OMPACTED BACKFILL
GROUNDCOVER DETAIL
10
SCALE: NOT TO SCALE
Wheat or Rye
Oats
Annual Ryegross
Non -Irrigated•
irrigated
Dormant
Seeding••
Temporary Seeding Dates
Jon I Feb I Mor I Apr I May I Jun I Jul Aug IS -P 10ct Lvov ec
Permonent Seeding
Irrigation needed during this period. To control
erosion at times other than in the shaded areas,
use mulch.
• Late summer seeding dotes may be extended 5 days
If mulch is applied.
•• Increase seeding application by 50X
FIGURE 5-3
Temporary Seedings
Kind of Seed 1000 Sq. Ft. Acre Remarks
Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1' to
1 1/2' deep
Spring Oats 2.3 lbs. 3 bu. Cover seed 1' deep
Annual ryegross 1 Ib. 40 lbs. Cover seed 1/4'deep•
• Not necessary where mulch is applied.
SEEDING SCHEDULE
4
10
;CAT.F.
NOT T(1 5�CAT.F
ROOTBALL
6"
METAL STAKE
CORPORATION AND ARE NOT TO BE USED OR REPRODUCED
PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDE
1998, The Schneider Corpora
VARIES
12 GUAGE WIRE
=
MULCH
C/) 0
-w
L
46226-6518 La:
317-898-8282 GL`
co 0:
2 PLY HOSE
SAUCER
THE LAKES AT HAZEL DELL,
0
0
t
TREE
TYPICAL SPACING
NM- LOCATE 1 STAKE DIRECTLY
2' SHREDDED BARK MULCH
Computer Files Sheet No.
SOUTHWEST OF TREE TRUNK
WEED BARRIER
FINISH GRADE
BACKFILL WITH A MIXTURE OF
3' ORGANIC COMPOST, 1 SAND,
AND ORGANIC SLOW RELEASE
EXISTING SUBSOIL OR
FERTILIZER
COMPACTED BACKFILL
GROUNDCOVER DETAIL
10
SCALE: NOT TO SCALE
Wheat or Rye
Oats
Annual Ryegross
Non -Irrigated•
irrigated
Dormant
Seeding••
Temporary Seeding Dates
Jon I Feb I Mor I Apr I May I Jun I Jul Aug IS -P 10ct Lvov ec
Permonent Seeding
Irrigation needed during this period. To control
erosion at times other than in the shaded areas,
use mulch.
• Late summer seeding dotes may be extended 5 days
If mulch is applied.
•• Increase seeding application by 50X
FIGURE 5-3
Temporary Seedings
Kind of Seed 1000 Sq. Ft. Acre Remarks
Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1' to
1 1/2' deep
Spring Oats 2.3 lbs. 3 bu. Cover seed 1' deep
Annual ryegross 1 Ib. 40 lbs. Cover seed 1/4'deep•
• Not necessary where mulch is applied.
SEEDING SCHEDULE
4
10
;CAT.F.
NOT T(1 5�CAT.F
ROOTBALL
CERTIFIED BY
METAL STAKE
CORPORATION AND ARE NOT TO BE USED OR REPRODUCED
PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDE
1998, The Schneider Corpora
(TYP. OF 3)
12 GUAGE WIRE
=
MULCH
(TYP. OF 3)
L
46226-6518 La:
317-898-8282 GL`
317-899-8010 Fax Ge
2 PLY HOSE
SAUCER
THE LAKES AT HAZEL DELL,
CARMEL, WDLANA
PLANTING
t
TREE
Project No. Dram
NM- LOCATE 1 STAKE DIRECTLY
1442.002 MDH
Computer Files Sheet No.
SOUTHWEST OF TREE TRUNK
TREE STAKING DETAIL
3
10
SCALE: NOT TO SCALE
SECTION
DECIDUOUS
2
10
SCALE: NOT TO SCALE
LEADER SHOULD NOT BE CUT OR DAMAGED
2 PLY HOSE TO SHEATH WIRE
GALVANIZED TWISTED HARE
METAL STAKES - LENGTH VARIES
(TYP. OF 3)
3' SHREDDED GRADE 'A' HARDWOOD BARK
MULCH EXTENDED 6' BEYOND TREE PIT -
DO NOT COVER TREE TRUNK WITH MULCH
3' SOIL SAUCER
FINISH GRADE
REMOVE ANY TWINE OR SYNTHETIC TAPES
REMOVE BURLAP FROM TOP 1/3 OF
ROOTBALL OR WARE BASKET (IF APPLICABLE)
EXCAVATE HOLE MINIMUM OF 12' LARGER
THAN ROOTBALL - BACKFILL WITH A
MINIMUM OF 24' OF TOPSOIL
COMPACTED TOPSOIL (TO PREVENT SETTLING)
TREE DETAIL
SECTION
EVERGREEN
1
LEADER SHOULD NOT BE CUT OR DAMAGED
2 PLY HOSE TO SHEATH WARE
GALVANIZED TWISTED WIRE
METAL STAKES - LENGTH VARIES
(TYP. OF 3)
3' SHREDDED GRADE 'A' HARDWOOD BARK
MULCH EXTENDED 6' BEYOND TREE PIT -
DO NOT COVER TREE TRUNK WITH MULCH
3' SOIL SAUCER
FINISH GRADE
REMOVE ANY TWINE OR SYNTHETIC TAPES
REMOVE BURLAP FROM TOP 1/3 OF
ROOTBALL OR WIRE BASKET (IF APPLICABLE)
EXCAVATE HOLE MINIMUM OF 12' LARGER
THAN ROOTBALL - BACKFILL WITH A
MINIMUM OF 24' OF TOPSOIL
COMPACTED TOPSOIL (TO PREVENT SETTLING)
TREE DETAIL
1. THE CONTRACTOR SHALL LOCATE AND VERIFY
UTILITIES PRIOR TO STARTING WORK.
2. THE CONTRACTOR SHALL REFER TO THE CONT
FOR ADDITIONAL REQUIREMENTS.
3. CONTRACTOR SHALL REPAIR ANY DAMAGE TO
PLANTING OPERATIONS AT NO COST TO THE OWN
PiAk=(a NO
1. THE CONTRACTOR SHALL SUPPLY PLANT MATT:
SUFFICIENT TO COMPLETE THE PLANTING AS SHO
2. ALL MATERIAL SHALL CONFORM TO THE GUIDE
THE CURRENT 'AMERICAN ASSOCIATION OF NURSI
PUBLISHED BY THE AMERICAN ASSOCIATION OF N
3. NO PLANT SHALL BE INSTALLED BEFORE ROUG
BEEN FINISHED AND APPROVED.
4. ALL PLANTS SHALL BEAR THE SAME RELATION
GRADE AFTER INSTALLED AS THEY DID PRIOR TO
5. ALL PLANTS SHALL BE BALLED AND WRAPPED
AS SPECIFIED. NO CONTAINER GROWN STOCK WI[
IT IS ROOT BOUND. ALL ROOT WRAPPING MATER
SYNTHETICS OR PLASTICS SHALL BE REMOVED AT
6. WITH CONTAINER GROWN STOCK, THE CONTAINS
AND THE CONTAINER BALL SHALL BE CUT THROU
TWO VERTICAL LOCATIONS.
7. THE DAY PRIOR TO PLANTING, THE LOCATIONS
SHRUBS SHALL BE STAKED FOR APPROVAL BY 0'
8. CONTRACTOR SHALL GUARANTEE NEW PLANT N
ONE CALENDAR YEAR FROM TIME OF PROVISIONAL
9. IF THERE IS A DISCREPANCY BETWEEN THE PL,
ON THE PLANT LIST AND THE QUANTITY SHOWN (
QUANTITY SHOWN ON THE PLANS WILL TAKE PREI
Revisions
CERTIFIED BY
THIS DRAWANG AND THE IDEAS, DESIGNS AND CONCEP
HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF
CORPORATION AND ARE NOT TO BE USED OR REPRODUCED
PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDE
1998, The Schneider Corpora
r � The
Schneider
•
Corporator
3020 North Post Road En
Indianapolis, Indiana Su
46226-6518 La:
317-898-8282 GL`
317-899-8010 Fax Ge
Formerly Schneider Engineering Corp. / Bohlen, M
ZARING HOMES
THE LAKES AT HAZEL DELL,
CARMEL, WDLANA
PLANTING
DETAILS
te
Project No. Dram
r12/0:3/:99
1442.002 MDH
Computer Files Sheet No.
J: \1442\002\DINGS\sec2\L102 IL