Loading...
HomeMy WebLinkAbout026-92 SP Windpointe at Waterstone Sec 1 SpecsEARTHWORK 8. Earth Work Balance J. Flushing Sewers Flush oil sanitary sewers except G. Backfilling - for a depth of at least 12 inches 3. Placing Concrete - Concrete shall be wA� MAINS Contractor shall confirm all earthwork quantities building sewers with water to obtain free flow above the top of the pipe, backfill with earth or deposited so as to require as little prior to start of construction. If an excess or through each line. Remove all silt and trash from granular material free from large stones, rock rehandling as practicable. When concrete is 1. SCOPE OF WORK shortage of earth is encountered, the Contractor shall appurtenon7es just prior to acceptance of work. fragments, roots or sod. Tamp this backfill to be placed at an atmospheric temperature of 1. SCOPE OF WORK: confirm with the Owner and Engineer the requirements thoroughly, taking care not to disturb the pipe. 35 degrees F. or less, paragraph 702.10 of A. Extent: The work required under this section for stockpiling, removal or importing of earth. K. Plastic Sewer -lipe Installation - Plastic sewer For the remaining trench depth, backfill with the Indiana Department of Transportation A. The work required under this section includes all cold water distribution lines, valves, consists of all excavating, filling, rough grading pipe sholi be bnstolled in a accordance with ASTM earth or granular material containing stones or Specifications latest revision shall be and related items necessary to complete the work Minor adjustments to the grades may be required to D23? per latest revision and no plastic e 1 D P�P rocks not larger than 4 inches. Backfill under g followed. meter its, hydrants, and related items including excavating and backfilling necessary P Yd g 9 9 Y indicated on the drawings and described in the earthwork balances when minor excess material or sholi exceed a oeflectron of 5x. and within 5' of walks, parking areas, driveways to complete the work shown on the drawings. The ends of water service lines shall be specifications. The Contractor shall notify in shortages are encountered. It is recognized by the and street shall be granular material only - F. Concrete Curb tightly plugged or capped at the terminal points pending the connecting to all such lines writing the owners and the Engineer of any changes, parties hereto that the calculations of the Engineer L. Storm Water Connections - No roof drains, footing thoroughly compacted by approved methods. of the buildingpiping as specified in the plumbing specifications and architectural PP 9 P P 9 P errors, or omissions found on the plans or in in determining earthwork quantities shall be ac- drains and/or surface water drains may be 1. Expansion Joints - Shall be 1/2 inch thick the field, before work is started or resumed. complished in accordance with the American Society of connected to the sanitary sewer systems, including H. Manhole Inverts - Construct manhole flow channels premoulded between storm structures do curb. drawings. Civil Engineers Standards for such calculations. temporary connections during construction. of concrete sewer pipe or brick, smoothly finished Further, that these calculations are subject to the and of semi -circular section conforming to the 2. Contraction/Control Joints - Unless otherwise 2. MATERIALS: 1. in general, the items of work to be interpretations of soi: borings as the physical limits M. Waterline Crossing - Where water lines and inside diameter of the connecting sewers. Make provided, contraction joints shall be sawed performed under this section shall include: of the various soil types, also the allowable variation sanitary sewers cross and water lines cannot be changes in size or grade gradually and changes in or scored joints spaced 10 feet on center, except for clearing and grubbing, removal of trees and in finish grade and compaction permitted the contractor, placed above the sewer with a minimum of 18 inches direction by true curves. Provide such channels intersection radii where joints shall be placed 5' o.c. A. Cast Iron Pipe: Cost iron pipe shall meet AWWA Specification C-106 with push - on joints stumps (where required), protection of trees and that all of these parameters may cause either on vertical clearance, the sewer must be constructed for all connecting sewers at each manhole. meeting AWWA Specification C-111. Wall thickness shall be determined from Table 6.4 to remain, stripping and storage of topsoil, pP g 9 P excess or shortage of actual earthwork materials to of water works rade ductile iron pipe with 9 P p 3. Finish - Tamp and screed concrete as soon as in AWWA C-106. Ductile iron pipe shall meet AWWA C-150 and C-151 Specifications. Pipe fill compaction and rough grading of entire complete the project. If such an actual minor excess or mechanical joints within 10 feet of the water 1. Subdrains - All subdrains shall be of the size placed, and fill any honey combed places. t0 be Cement lines per AWWA C-104. site. shortage of materials occurs, the contractor shall line. shown on the plans and shall be constructed to the Finish square corners to 1/4" radius and contact the engineer to determine if adjustment can be grades shown. All drains constructed off-site as other corners to radii shown. 2. Excavated material that is suitable may be made to correct the imbalance of earth. N. Utilities - It shall be the responsibility of part of the outlet drain will be located as shown. B. Copper Tubing: Shall be seamless, annealed copper tubing complying with Federal used for fills. All unsuitable material and each contractor to verify all existing utilities G. Concrete Walks and Exterior Steps Specification WW -T-799. Fittings shall be wrought copper or cost bronze with Solder all surplus excavated material not required and conditions pertaining to his phase of the J. Utilities - It shall be the responsibility of each joints. Solder shall be of a composition recommended by the manufacturer of the fittings. shall be removed from the site. The work. It shall also be the contractors contractor to verify all existing utilities and 1. Slopes - Provide 1/4 inch per foot cross } location of dump and length of haul shall be responsibility to contact the owners of the conditions pertaining to his phase of the work. slope. Make adjustments in slopes at walk the Contractor's responsibility. SANITARY SEWER SYSTEMS various utilities before work is started. The It shall also be the contractors responsibility to intersections as necessary to provide proper C. Fire Hydrants: Shall comply with AWWA Specification C-50 and shall m VC01 contractor shall notify in writing the owners and contact the owners of the various utilities before drainage. standards and requirements, particularly as to nozzle diam Pers and threads,:. Ction 3. Provide and place any additional fill the engineer of any changes, errors or omissions work is started. The contractor shall notify in of opening and dimensions of operating and cap nuts. Fi ne material from off the site as may be 1. SCOPE OF WORK found on these plans or in the field before work writing the owners or the engineer of an changes, g 9 Y 9 2. Dimensions - Walks and steps shall be one _Hydrants r �' necessary to produce the grades required. is started or resumed. errors or omissions found on these plans or in the course construction and of widths and details pumper and two hose nozzles. A valve opening not less t 5 inches an a inchlinlet Fill obtained from off site shall be of kind 'he work under this section includes all sanitary field before work is started or resumed. shown on the drawings. connection. The length of the hydrant barrel shall be det ed by the specifie� *' and quality as specified for fills herein sewers, manholes, cieonouts and related items including 0. Service Laterals - Individual lot service lines depth of cover over the pipe. and the source approved by the Owner. excavating and backfilling, necessary to complete the shall be 6' in diameter and of material equal to K. Contractor to grout joints inside storm 3. Finish - Screed concrete and trowel with a work shown in the drawings, starting five feet outside that specified in 2A of this section. Service structures where pipes enter or exit steel trowel to a hard dense surface after 4. The Contractor shall accept the site as he the building walls. The ends of sewers shall be lines shall be connected to the main sewer by a and between structure and casting. surface water has disappeared. Apply medium D. Valves: All valves and stops shall have ends suited or adapters shall be provided for finds it and shall remove all trash, rubbish tightly plugged or capped at the terminal points, wye at locations generally shown within these broom finish and scribe control joints at 5 the proper installation in the lines in which they are located. Valves shall meet local and debris from the site prior to starting adjacent to buildings, pending the connecting of all plans. Service lines shall be extended and foot spacing. Provide 112* expansion joints standards or in the absence of such standards, the following requirements: excavation. such lines to the building drain as specified in the capped at a point 5 feet beyond the right-of-way where sidewalks intersect, and at a maximum plumbing specifications and architectural drawings. line or one pipe length for those services on the spacing of 48 feet between expansion joints. 1. Valves in cast iron pipe shall be iron body, bronze mounted, disc gate valves B. Work not included: The following items of same side of the street as the main. Sewer STREETS related work are specified and included in other 2. MATERIALS service lines shall be marked on the curb with H. Curing Concrete - Except as otherwise specified, Conforming to AWWA Specification C-500. They shall open in the same direction sections of these specifications: red paint and at the end of the line with a cure all concrete by one of the methods described as those used in the local waterworks system. Valve stems shall terminate in 2 inch A. Sanitary Sewers wooden 2x4 above the ground. in Section 501.17 of the Indiana Department of wrench nuts. Furnish two (2) keys. 1. Excavation, grading and backfilling for 1. SCOPE OF WORK Transportation Specifications, latest revision. utility lines 1. All gravity plastic sewer pipe and fittings P. New Sanitary Sewer Main Construction - Contractor shall conform to ASTM D3034, SDR -35 and meet shall record dimensions of each service line stub The work required under this section includes all I. Bituminous Pavement - Hot asphalt concrete 2. Valves In copper pipe shall be standard brass body, round -way, ground -key stops with 2. Storm drainage systems a cell classification of 12454 B in from nearest downstream manhole measured along concrete and bituminous paving and related items pavement shall be as specified in Section 403 of T heads. Furnish two (2) keys. accordonce with ASTM 1784. the sanitary sewer main. The locations of necessary to complete the work indicated on drawings the Indiana Department of Transportation 3. Sanitary sewer systems manholes and service lines along with any other and described in the specifications, including but not Specifications latest revisions. Paving will not E. Valve Boxes: Shall meet local standards or in the absence of such, shall comply with the B. Manholes construction changes are to be incorporated on limited to: be permitted during unfavorable weather or when 4. Streets and paving the oriVol construction drawings and "Record the temperature is 40 degrees F. and falling. following requirements: 1. Precast reinforced concrete manhole sections Drawing prints submitted to the City of Carmel All streets, parking areas in contract limits 5. Water supply system and steps shall conform to ASTM C-478 latest and the engineer as soon after completion of Curbs and gutters J. Compacted Aggregate Subbase - the thickness shown 1. For iron body valves, boxes shall be approved standard buffalo -type, cost iron, revision. construction as possible. Sidewalks and concrete. slabs, exterior steps on the drawings is the minimum thickness of the adjustable shaft boxes, having a minimum shaft diameter of 5-1/4 inches. 2. BENCH MARKS fully compacted subbase. Compaction shall be 2. Castings shall be of uniform quality, free 2. MATERIALS accomplished by rolling with a smooth wheeled Maintain carefully all bench marks, monuments and other from blow holes, porosity hard spots, roller weighing 8 to 10 tons. Compact to 907 2. For brass body valves (Stops) boxes shall be approved standard Cast iron extension reference points; if disturbed or destroyed, contractor shrinkage distortion or other defects. They A. Concrete - Concrete shall be ready -mixed concrete compaction using Standard Testing Procedures. service boxes, having a minimum diameter of 2-1/2 inches and having lid held in shall contact engineer. shall be smooth and well -cleaned by shot- STORM SEWER SYSTEMS and shall be a mix of proportioned fine and Along curbs, headers and walls and at all placed lace b a brass or bronze bolt. The castings shall be coated with two coats of coal -tar P Y g blasting or some other approved method. g y PP coarse aggregates with Portland cement and water. not accessible to the roller, the a re ate aggregate 3. REMOVAL OF TREES They shall be coated with asphalt paint 1. SCOPE OF WORK Minimum cement content shall be 6 bags per cubic material shall be tamped with mechanical tampers pitch varnish. Fumish two (2) keys for bolt in lids. ` which shall result in a smooth coating, yard of concrete and maximum water content shall or with approved hand tampers. A. Remove all trees and stumps from area to be tough and tenacious when cold, not tacky or The work under this section includes all storm sewers, be 5.5 U.S. gallons per sack of cement, including F. Stops: Stop Shall be those manufactured by For or Mueller Corporation with AWWA occupied by road and surfaced areas. Removal of brittle. They shall be gray iron meeting storm water inlets, and related items, including moisture in the aggregate. Slump for normal taper thread, and with copper compression type fitting on outlet, or equal. trees outside these areas shaii only be done as ASTM A-48 latest revision. Manhole covers for be Neenah Type excavating and backfilling, necessary to complete the weight concrete shall be a maximum of 4 inches G. Blow -off Valves: Blow -off valves shall be those manufactured by Muller Corporation noted on drawings or approved by the Owner. sanitary sewer shall work shown on the drawings, and a minimum of 2 inches. the slump of machine R -1772-A with 'f concealed pickhole. placed concrete shall be no less than 1-1/4 (H-10283 or H-10291), or equal. B. All brush, stumps, wood and other refuse from the 2. MATERIALS inches nor more than 3 inches. Standard test trees shall be buried onsite or removed to disposal areas 3. Joints - manhole sections shall be jointed "o' "o' ASTM C-143 shall be used to measure slump. H. Angle Valves: Angle valves at the end of water service Stub are to be copper 9 9 off of the site. Disposal b burning shall not P Y 9 with sealed rings. The rings shall 9 9 A. Storm Sewers Compressive g days p essive strep th of concrete at 28 da shall be permitted unless proper permits are obtained meet ASTM C-443 latest revisions. be 4000 psi. All exterior concrete shall have compression type fitting also, and are to be protected with plastic bag over the valve. (where applicable). The location of on site bury 1. Reinforced concrete sewer pipe shall confirm air entrainment of 5% to 8% by volume per ASTM C pits shall be designated by the owner or the 4. Bismatic coating shall be applied around to ASTM C-76 latest revision, with joints �° -260. Retempering of delivered concrete will not I. Taps: 3/4" taps in lines smaller than 4 inches shall be only by tapped tee or tapping Engineer. • 9 each manhole int from 6 inches above to 6 to conforming to ASTM C-443 latest revision. be allowed. Concrete shall be composed of: saddle. Water service lines should be marked on curbs with blue paint. (Sewer lateral inches below each joint. Inside joints to J 10 When storm pipe is submerged 4. PROTECTION OF TREES be filled with precoat plug material. 1. Portland cement - Conforming to ASTM C-150, locations - red). B. Manholes Type IA or Type IIIA. A. General Protection: The Contractor shall be 3. APPLICATION 3. APPLICATION: responsible for the protection of tops, trunks 1. Precast reinforced concrete manhole sections 2. Aggregates: Conforming to ASTM C-33 and roots of existing trees on the project site that are to remain. Existing trees subject to A. Permits and Codes - The intent of this section of the specifications is that the contractor's bid on and steps shall conform to ASTM C-478 latest 3. Water - Shall be clear and free from A. Permits and Codes: The intent of this section is the specifications if that the contractor's construction damage shall be boxed, fenced or the work covered herein shall be based upon the revision. injurious amounts of oils, acids, alkalies, bid on the work covered herein shall be based upon the drawings and specifications but otherwise protected before any work is started; drawings and specifications but that the work 2. Casting shall be of uniform quality, free organic materials or other deleterious that the work shall comply with all applicable codes and regulations. Contractor shall do not stockpile within branch spread. Remove shall comply with all applicable codes and from blow holes, orosit hard spots, P y' P substances. furnish all necessary bonds to get permits for cuts and connections. interfering branches without injury to trunks and regulations as amended by any waivers. Contractor shrinkage distortion or other defects. They cover scars with tree paint. shall furnish all bonds necessary to get permits shall be smooth and well cleaned by shot 8. Welded Steel Wire Fabric - Where required for for cuts and connections to existing sewers. -blasting or by some other approved method. concrete reinforcement shall conform to ASTA185. B. Existing Improvements: Maintain in 0 eratin condition all active utilities and sewers 9P operating 5. HANDLING OF TOPSOIL "local They shall be coated with asphalt paint and other pipe system that may be encountered. B. Local Standards - The term standards" as which shall result in o smooth tooting, C. Premoulded Joint Filler - Shall be of non A. Remove all organic material from the areas to be used herein means the standards of design and tough and tenacious when cold, not tacky or -extruding type meeting ASTM D-544 except that occupied by buildings, roads, walks and parking construction of the respective municipal brittle. They shall be gray iron meeting premoulded joint filler used in concrete walk C. Trenching: Lay all pipe in open trenches, except when local authority gives written areas. Pile and store topsoil at a location department of utility company. ASTM A-48 latest construction may be either non -extruding or permission for tunneling. Provide a separate trench for the water line at least 10 where it will not interfere with construction revision. resilient. feet horizontally from any sanitary sewer. In locations where separate trenches for sewer operations. Topsoil shall be reasonably free C. Existing Improvements -Maintain in operating 3. Joints - Manhole sections shall be jointed and water lines are impracticable, la the water i e on a solid shelf at least 18 inches P Y P P from subsoil, debris, weeds, grass, stones, ect. condition all active utilities, sewers and other with rubber type gaskets. The rubber type D. Bituminous Pavement Materials - All materials drains encountered in the sewer installation, gaskets shall meet ASTM C-443 latest proposed for the construction of bituminous above the top of the sewer. B. After completion of site grading and subsurface Repair to the satisfaction of the owner any damage revision. When manhole and storm are pavements shall comply with the Indiana Department utility installation, top soil shall be replaced to existing active improvements. pipe continuously in water. of Transportation specifications, per latest D. Width of Trench: Excavate trenches 12 inches each side of the pipe for proper in areas designated on the erosion control plan revision. installation of pipe. for seeding and/or sodding. Any remaining top D. Workmanship - To conform to all local, state and C. SUBDRAINS soil shall be used for finished grading around national codes and to be approved by all local and E. Compacted Aggregate Subbase: Shall be crushed structures and landscaping areas. state agencies having jurisdiction. 1. Perforated plastic pipe subdrains shall stone or gravel. Crushed gravel shall be a E. Sheeting and bracing: Sheet and brace trenches as necessary to protect workmen and conform to ASTM F-405. minimum of 35% crushed material. Chert shall be adjacent structures. All trenching Shall comply with the Occupational Safety and E. Trenching - Lay all pipe in open trenches, except limited to a maximum of 8% of the total. Material Health Administration Standards. 6. DISPOSITION OF UTILITIES: when the local authority gives written permission 3, APPLICATION shall be free from an excess of flat, elongated, for tunneling. Open the trench sufficiently ahead thinly laminated, soft or disintegrated pieces; A. Rules and regulations governing the respective of pipe -laying to reveal any obstructions. The A. Permits and Codes - The intent of this section of and shall be free from fragments coated with dirt. F. Water Removal: Keep trenches free from water while construction therein is In utilities shall be observed in executing all work width of the trench shall be the inside pipe the specifications is that the contractor's bid on Compacted aggregate shall be graded as follows: progress. Under no circumstances lay pipe or appurtenances in standing water. under this section. diameter plus 24 inches for 12 inches above the the work covered herein shall be based upon the Conduct the discharge from trench dewatering to drains or natural drainage channels. pipe. Sheet and brace trench as necessary to drawings and specifications but that the work SIEVE SIZE 7 PASSING B. If active utilities are encountered but not shown protect workmen and adjacent structures. All shall comply with all applicable codes and on the drawings, the Engineer shall be advised trenching to comply with Occupational Safety and regulations as amended by any waivers. Contractor 1-1/2" 100 G. Grading Trench Bottoms: The bottom quadrant of the pipe shall be fully and before work is continued. Health Administration Standards. Keep trenches shall furnish all bonds necessary to get permits 1" 80-100 uniformly supported. The full load Shall rest on the barrel of the pipe. The trench free from water while construction is in progress.3/4" for cuts and connections to existing sewers. 70-90 may be excavated to a depth of 4 inches or more below final grade with sand, crushed C. Inactive and abandoned utilities encountered in Under no circumstances shall pipe or appurtenances 1/2" 55-80 excavating and grading operations shall be be laid in standing water. Conduct the discharge B. Local Standards - the term "Local Standards" #4 35-60 stone or gravel backfill to bring it back to pipe laying grade. For a depth of at least reported to the Engineer. The shall be removed, P 9 Y from trench dewatering to drains or natural 9 as used herein neons the standards of design and #8 25-50 12 inches above the top of the pipe backfill with earth or granular material free from plugged or capped as directed by the Utility drainage channels. construction of the respective municipal X130 12-30 large stones, roots or frozen clogs. Tamp this backfill thoroughly taking care not to Company and the Engineer. P Y 9 deportment or utility company. 200 5-10 disturb the pipe. Backfill under walks, parkingareas, driveways and streets with p P � F. Special Supports - Whenever, in the opinion of the D. It shall be the responsibility of each contractor Engineer, the soil at or below the pipe grade C. Existing Improvements - Maintain in operating 3. APPLICATION granular material only and tamp thoroughly, by approved methods. Trenches parallel to verify all existing utilties and conditions is unsuitable for supporting sewers and condition all active utilities, sewers and other to and within 10 feet of paved roadways shall be constructed the same. pertaining to his pnose of the work. It shall appurtenances specified in this section, such drains encountered in the sewer installation. A. Grading - Do any necessary grading in addition to also be the contractors responsibility to contact special support, in addition to those shown or Re air to the satisfaction of the owner an damage P y g that performed in accordance with Earthwork H. Tests: Before joints are covered, fill the piping with water, opening hydrants or at the owners of the various utilities before work specified, shall be provided as the Engineer may to existing active improvements. Section, to bring subgrades, after final g g least two hours 100 inch. Inspect all for is started. direct, and the contract will be adjusted. compaction, to the required grades and sections at pressure of pounds per square joints P P P q P D. Workmanship - To conform to all local, state and for site improvement. leakage and remedy any leaks. Upon completion of the water distribution mains, flush 7. SITE GRADING: G. Bockfilling - for a depth of at least 12 inches national codes and to be approved by all local and out the system until the water runs clear. As soon as the system has been flushed out, above the top of the pipe, backfill with granular state agencies having jurisdiction. B. Preparation of Subgrode - Remove spongy and it shall be sterilized in accordance with the requirements of the Carmel Water A. Grades: Contractor shall perform all cutting, material free from large stones, rock fragments, otherwise unsuitable material and replace with filling, compacting of fills and rough grading roots or sod. Compact this backfill thoroughly, E. Trenching - Loy all pipe in open trenches, except stable material. No traffic will be allowed on Department, required to bring entire project area to grade as taking care not to disturb the pipe. for the when the local authority gives written permission prepared subgrade prior to paving. shown on the drawings. remaining trench depth, bockfill with earth or for tunneling. Open the trench sufficient ahead I. If a horizontal distance of 10 feet cannot be maintained between the water line and granular material containing stones or rocks not of pipelaying to reveal any obstructions. The C. Compaction of Subgrode - The first 6 inches below and a sanitary sewer line, one of the following shall be done. Y g B. Rough Grading: the tolerance for paved areas larger than 4 inches. Bockfill under and within width of the trench shall be the inside pipe the subgrade shall be compacted to at least 1007 shall not exceed 0.10 feet plus or minus above 5' of walks, parking areas, driveways and streetsdiameter plus 24 inches for 12 inches above the of the maximum dry density as determined by the the established subgrade. All other areas shall shall be granular material only - thoroughly pipe. Sheet and brace trench as necessary to provisions of AASHO T-99. Water shall be 0. Water line laid in a separate trench and 18: above sewer. not exceed 0.10 feet plus or minus the compacted, by approved methods. protect workmen and adjacent structures. All prevented from standing on, the compacted subgrade. established grade. All banks and other breaks in trenching to comply with Occupational Safety and b. Water line laid in same trench on a bench of undisturbed earth and grade shall be rounded at top and bottom. H. Flow Channels - The flow channels within manholes Health Administration Standards. Keep trenches D. Utility Structures - Check for correct elevation shall be an integral part of the precast base.of free from water while construction is in progress. all manhole covers, valve boxes and similar Sewer at least 18" below bottom of water line. Compaction Requirements: C. Com Re P q The channels shall be shaped and formed for a P Under no circumstances lay pipe or appurtenances structures located within areas to be paved, and clean transition with proper hydraulics to allow in standing water. Conduct the discharge from make, or have made, any necessary adjustments in Where water lines and sewers cross and the water line cannot be laced P ',. Ail building pad areas shall be compacted to the smooth conveyance of flow through the manhole. trench dewateringto drains or natural drainage 9 such structures. above the sewer with a minimum of 18" vertical clearance, the sewer must be standards specified by local and/or state The bench wall shall be formed to the crown of the channels. building codes. inlet and outlet pipes to form a 'U' shaped E. Placing Concrete constructed of water works rade cast iron pipe with mechanical joints within 9 P P channel. The bench wall shall slope bock from the F. Special Supports - Whenever in the opinion of the 10 feet of the water line. 2. For compaction requirements of paved areas, crown at 1/2 inch per foot to the manhole wall. Engineer the soil of or below the pipe grade is 1. subgrade - Place concrete only on a moist, see street specifications. unsuitable for su ortin sewers and a PD g appurtenances compacted subgrade or base free from loose J. Utilities: It shall be the responsibility of each contractor to verify all existing utilities 1. Infiltration - The contractor shall furnishmaterial. to test for specified in this section, such special support, Place no concrete on a muddy or frozen and conditions pertaining to his phase of the work. It shall also be the contractors necessary equipment sewers in addition to those shown or specified, shall be subgrade. infiltration. Infiltration rates shall not exceed provided as the Engineer may direct, and the responsibility to contact the Owners of the various utilities before work is started. The the Local Standards. All sanitary sewer lines contract will be adjusted. 2. Forms - All forms shall be free from warp, Contractor shall notify in writing the owners or the engineer of any changes, errors or upon completion will be required to pass a low tight enough to prevent leakage and omissions found on these plans on in the field before worts is started or resumed. pressure air test, unless otherwise directed by substantial enough to maintain their shape the City of Carmel. Said test shall be conducted and position without springing or settling, according to NCPI Standard Method, and shall be when concrete is placed. Forms shall be K. New Water Main Construction: Contractor to record dimension of each water stub and witnessed by an inspector authorized by the City clean and smooth immediately before valves from nearest fire hydrant measured along water main. The locations of hydrants of Carmel. Infiltration under test shall not concreting. and water valves, along with any other construction changes are to be incorporated on exceed 200 gallons per inch of inside diameter of sewer pipe per mile of sewer in 24 hours and the original construction drawings and "Pecord Drawing" prints Submitted to City ' inclusive of all appurtenances within the section Engineer's Office as soon after completion of construction as possible. being tested such as manholes, house connections, etc. ````t,tttlt u I II, Iij�'i N _ a..) . • 000 O Q Lj 7 Z a o; t •.�� 0 � Iltttt% N Z O N 5 W lY