HomeMy WebLinkAboutRieth-Riley Construction Co., Inc/Eng/CO #8/-4,100/126th Street & Gray Road RABCity of Carmel Project 16 -ENG -16 126 th Street and Gray Road RA B O� CHANGE ORDER #8 Replace 12" Team Inserta Valves with 10" and 12" EZ Valves at direction of Carmel Water Department. Delete 2 water main lowerings. Contract Price prior to this Change Order $3,334,933.26 --------------------------------------------------- Contract Price will be increased by this Change Order <$4,100.00> New Contract Price including this Change Order $3,330,833.26 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $3,205,200.00 $3,205,200.00 N/A C01 $87,364.65 $3,292,564.65 2.73% CO2 $14,870.68 $3,307,435.33 3.19% CO3 <$1,235.00> $3,306,200.33 3.06% C04 $3,865.00 $3,310,065.83 3.17% C05 $7,710.42 $3,317,776.25 3.39% C06 $10,346.71 $3,328,122.96 3.69% C07 $6,810.30 $3,334,933.26 3.89% C08 <$4,100.00> $3,330,833.26 3.77% TO: Rieth Riley Construction Co. 1751 W. Minnesota St. Indianapolis, IN 46221 CITY OF CARMEL CONTRACT CHANGE ORDER NO.: 8 DATE: September 7, 2017 PROJECT NAME: 1266' St and Gray Road Roundabout Be St and Gray Road Roundabout Gray Rd Culvert Replacement Culvert 165 CITY P.O. NO.: 100148 and 100149 CITY P.O. DATE: March 1, 2017 n*acv,,�,o, I. You are directed to make the following changes in this Contract: For Proiect 16 -ENG -16. 126th and Gray Rd Roundabout PO #100148, replace 12" Team Inserta Valves with 10" and 12" EZ Valves per Carmel Water Department. Delete the 12" diameter water main lowerings at STA 52+50 RT and STA 22+00 RT as they have been field determined not to be in conflict with storm sewer construction. ITEM #128, 12" DI Water Main Lowering #136, 12" Team Inserta Valve #140E 10" EZ Valve #141E 12" EZ Valve SCHEDULED ADJUSTMENT UNIT QUANTITY PRICE AMOUNT H / (-) DAYS EACH <2.0> <$11,500.00> <$23,000.00> 0 EACH <2.0> <$17,900.00> <S35,800.00> 0 EACH 2.0 $13,180.00 $26,360.00 0 EACH 2.0 $14,170.00 $28,340.00 0 II. The following referenced documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.: NiA The changes result in the following adjustment of Contract Price and Contract Time: Contract Sum prior to this Change Order $3.334.933.26 Contract Sum will be increased/dee-reased by this Change Order <$4.100.00> New Contract Sum including this Change Order $3.330.833.26 Contract Time Prior to this Change Order 5/20/2017 Substantial Completion Date Days Net increased/decreased resulting from this Change Order Current Contract Time including this Change Order 6/20/2017 Final Completion Date Days 0 Days 5/2012017 Substantial Completion Date Days 6/20/2017 Final Completion Date Days This Change Order is for full and final settlement of all direct, indirect, impact costs and time extension incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended: DLZ Indiana, LLC, Engineer 157 E. Maryland St Indianapolis J"6: -OZ6 Date // "J-7- The Above Changes Are Accepted: Rieth-Riley Construction Company, Inc 1751 W. Minnesota St. Indianapolis, IN 46221 Approved: Date �' r4 �s r{'oe) Jeremy Kashman, PE, City Engineer ATTEST: Christine S. Pauley, Clerk UU Treasurer Date: - I IgL)II �_� PROJECT NO- 16 -ENG -16, 1(3 -ENG -54,16 -SW -107 CONTRACTOR: Rielh Riley Construction Co. INSPECTION CONSULTANT OLZ Indiana 1310 AMOUNT. $3.205.200-0 BID DATE. 02101/17 CONTRACT CHANGE ORDER NUMBER 001 FORESEEN OR UNFORESEEN FORESEEN TOTAL FORESEEN AMOUNT $87,364,65 TOTAL UNFORESEEN AMOUNT RUNNING . TOTAL OF CHANGE ORDERS $87.364.65 DESCRIPTION OF CHANGE ORDER- Owner directed changes at Get_N_Go, Project 16 -SW- 107, POO 100149 DATE BOARD APPROVED 05/17/17 NEW CONTRACT AMOUNT $3,292,564.65 Total % Change Orders vs. Bid Amt. A OF CHANGE ORDER FORESEEN 2.73% 2 UNFORESEEN $14.870.68 $102,235.33 Replace 10" walermain relocation items with 12" items, Project 16 -ENG -54, PO# 100148 $3,307,435.33 3 FORESEEN <$1.235.00> $101,000.33 Replace 3" steel galvanized pipe for electrical with2" steel galvanized pipe. .33 2.60% 4 UNFORESEEN $3,865.50 $104,865.83 Compensation for Undercut Areas .83 5 UNFORESEEN $7,710.42 $112,576.25 Carmel Water Utility Field Conditions and Additions 25 6 UNFORESEEN $10.346,71 $122,922.96 Emergency Field Repair of B" Sanity Sewer 96 n$3,334,933,26 7 UNFORESEEN $6,810.30 $129,733.26 Change Subgrade Treatment from Lime to Cement, Project 16 -ENG -54 26 8 UNFORESEEN <$4,100.00> $125,633.26es TReplace Team Insane with EZ Valves 16 -ENG -16 26 &W 129 6,5 czo ori a $3,330,833.26 2.60% Original Bid Amount $3,205,200.00 Total Change Orders) Amount $129,733.26 Total Foreseen Change Orders $86,129.65 Total Unforeseen Change Orders $43,603.61 Total % Change Orders vs. Bid Amt. 3.772 % OF CHANGE ORDER UNFORESEEN 0.46% 0.57% 0.79% 1.09% 1.29% 1.17% 1ETHjEY CCo., INc. 100% Quality - 100% Employee Owned - Over 100 Years August 30, 2017 Mike Smith SENT VIA ELECTRONIC MAIL ONLY: DLZ Construction Observer Manager _mismith(&dlz.com 157 E. Maryland Street Indianapolis, IN 46204 RE: Gray Road at 126"' Street RAB: City of Carmel Project No. 16 -ENG -16 Rieth-Riley Project No. 3200695 Dear Mr. Smith, See new proposed pay item pricing based on the change from Team Inserta Valves to EZ Valves supplied by HD Supply and our findings in the field. It should be noted that two additional valves have been added in the field by Carmel Water Utility. The total value of this contact adjustment proposed is $18,900.00 136 12" Team Inserta Valve (Undistributed) -2.00 EA $17,900.00 -$35,800.00 EWA -1 10" EZ Valve from HD Supply 2.00 EA $13,180.00 $26,360.00 EWA - 2 12" EZ Valve from HD Supply 2.00 EA $14,170.00 $28,340.00 Total $18,900.00 Please call with any questions. Thanks Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Gary Davis John Tuddy P.O. Box 276 •1751 w Minnesota St. • Indianapolis, IN 46206 r Phone: (317) 634-5561 • www.rieth-riley.com