Loading...
HomeMy WebLinkAboutMillenium Contractors/Eng/CO #2/62,503.11/Multi-Use Path Along Ditch RoadCity of Carmel Project 16 -ENG -20 Multi Use Path along Ditch Road CHANGE ORDER #2 Subgrade Treatment, HMA Transfer Machine, and Pipe Credit Contract Price prior to this Change Order $1,232,332.90 ---------------------------------------------------------------------------------- Contract Price will be increased/decreased by this Change Order ------------------------------------------------------------------------------------------- New Contract Price including this Change Order ------------------------------------------------------------------------------------------ $62,503.1 l $1,294,836.01 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $1,205,628.00 $1,205,628.00 N/A C01 $26,704.90 $1,232,332.90 2.22% CO2 $62,503.11 $1,294,836.01 7.40% CiTY OF CARMEL TO: CONTRACTCHANGE ORDER NO.: 2 I. "here sub. -rade is not suitable to construct the trail, excavate, instnll gcogrid, and place compacted aggregate. DATE: 8/30/2017 Millennium Contractors PROJECTNAME: Ditch Road Path 1401 South Holt Road CITY Ri:Q. NO.: unsuitable site conditions. Indianapolis, iN 46241 CITY PO NO.: 100284 ITEM XI`TN: Andre%v Closser Ci(Y PO DATE: April 5. 2017 03 - Common Excavation 1. You are directed to make the following changes in this Contract: I. "here sub. -rade is not suitable to construct the trail, excavate, instnll gcogrid, and place compacted aggregate. 2. Provide an I iMA "transfer Machine to place surface, and base. 3. Provide a credit for using I IDPE pipe, and end sections instead of concrete 4. Additional days will he added to this contract due to unsuitable site conditions. The contractor is entitled to 50 additional days due to weather, and unsuitable site conditions. SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS 03 - Common Excavation 513,300.00 + 3 Day 21 - Compacted Aggregate, No. 53 $16,089.20 + 3 Day 92 - Gcogrid for Subgradc Stabilization (Standard) $3,900.00 + 3 Day 93 - Gcogrid for Subgradc Stabilization (BX 1200) $5,985.00 + 3 Day 94 — Transfer Machine for HMA Placement $29,929.90 + 3 Day 95 — Credit for End Sections and Pipe ($6,700.99) Additional Time for Unsuitable Conditions +35 Day II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: The changes result in (lie following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1.232.332.90 Contract Price will be increased/deefeased by this Change Order $ 62 503.11 New Contract Price including this Change Order $ 1.294 836.01 Contract Time Prior to this Change Order 114 Days 7/28/2017 Completion Date Net increased/desRrresulting from this Change Order 50 Days Current Contract Time including this Change Order 164 Days 9/16/2017 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended USI Consultants, Inc. ENGINEER 8415 East 50 Street Indianapolis, IN 46216 City/State/Zip By: J Phone: r 4 y I — 37x1 Date: S 30 2a 17 The Above Changes Arc Accepted: Millennium Contractors CONTRACTOR 1401 South Flolt Road Indianapolis, IN 46241 City/State/lip By: L zv� '0 Phon 3�ii _ L/ C& ,1Ot Christine S. Pauley, Clerk -Treasurer 9130 X01-7 U Date: Date: 20 IV -17 WOO. Approved: ere y %t. Kashman, City Engineer alFo consultants Description: Change Order: Status: Type: Summary: USI Consultants, Inc. Change Order Details Ditch Road Path City of Carmel Project No. 16 -ENG -20 Multi Use Path Along Ditch Road Pending Approval Changed Conditions Date Created: 07/28/2017 Date Approved: Add additional geogrid for subgrade stablilization, HMA Transfer Machine, and Pipe Credit Change Order Description: Geogrid, Compacted Acrcrrecrate. and Common Excavation for Sub rade Treatment After a proof roll of the existing subgrade it was determined that Geogrid, Compacted Aggregate, and Common Excavation will be required in order to stabilize the subgrade. This work will cost an additional $39,274.20 to complete. Required Quantities For Geogrid: STA 28+00 to 51+50 = 1,200 SYS (Regular Strength) STA 52+00 to 62+29 = 1,100 SYS (BX 1200 or Equal) HMA Transfer Machine for Placement of Surface and Base An HMA Transfer Machine will be used to place materials for the trail in order to provide a lower loading on the compacted aggregate. This will provide a better trail by not placing a high loaded weight on the base material. This work will cost an additional $29,929.90 to complete. Credit for Use of HDPE Pipe The contractor has provided a credit in order to use HDPE pipe in place of the concrete pipe specified. Awarded Project Amount: $1,205,628.00 Authorized Project Amount: $1,232,332.90 Change Order Amount: $62,503.11 Revised Project Amount: $1,294,836.01 Change Order Details: Ditch Road Path Page 1 of 3 08/30/2017 Increases/Decreases Line Nu�iiber': Item Unit •.' .Pending Quantity•" 'Unit Price. :"Line Number" Item . ' " Unit. Unit Price _, • ' Current Change ''" "'"` devised " t ,. .•" SYS 1,140.00 Quantity Amount 'Quant ity• Amount Quantity':, - Amount Section: 1 - Default Section Reason: Stabilize Subgrade 0940 Ditch Road Path 94 5 Ditch Rd Path 5 CYS $70.000 1,176.90 $82,383.00 190.00 $13,300.00 1,366.90 $95,683.00 EXCAVATION, COMMON Reason: Lower Load on Trail During Placement 0950 Ditch Road Path 95 LSUM Reason: Stabilize Subgrade -$6,700.990 -$6,700.99 Credit for Pipe and End Sections 21 Ditch Rd Path 21 TON $42.340 2,095,30 $88,715.00 380.00 $16,089.20 2,475.30 $104,804.20 COMPACTED AGGREGATE NO. 53 BASE _ ... Reason: Stabilize Subgrade 0920 Ditch Road Path 92 SYS $3.250 1,522.00 $4,946.50 1,200.00 $3,900.00 2,722.00 $8,846.50 Geogrid for Subgrade Treatment Reason: Stabilize Subgrade '(3Itsms) • Totals $176,044.50 $33,289.20 $209,333.70! New Items Line Nu�iiber': Item Unit •.' .Pending Quantity•" 'Unit Price. Do1larAmount Sectioni:l -'Default Section 0930 Ditch Road Path 93 SYS 1,140.00 $5.250 $5,985.00 Geogrid for Subgrade Treatment BX1200 or Equal Reason: Stabilize Subgrade 0940 Ditch Road Path 94 TONS 1,183.00 $25.300 $29,929.90 Transfer Machine For HMA Placement Reason: Lower Load on Trail During Placement 0950 Ditch Road Path 95 LSUM 1.00 -$6,700.990 -$6,700.99 Credit for Pipe and End Sections Reason: HDPE Supplied - Concrete Required Total: +$291213.91 _ ... Time Limits "Type Original Deadline Authorized Deadline". ". Pending Extension Pending Deadline! Completion Date 07/14/2017 07/28/2017 50 Days 09/16/2017 Substantial Completion Reason: Unsuitable Weather and Added Work Completion Date 08/12/2017 08112/2017 Final Completion Reason: Unsuitable Weather and Added Work (2 Time Limits) " 49 Days 09/30/2017 Change Order Details: Ditch Road Path Page 2 of 3 08/30/2017 This change order is approved for construction. amu/ 7 Scott Dick - USI Csultants Inc. Date 4,4'PA-4�\' (036h:2 Millennium ntractors, LLC Date J313117017 Cit of armel Date Change Order Details: Ditch Road Path Page 3 of 3 08/30/2017