HomeMy WebLinkAboutMillenium Contractors/Eng/CO #2/62,503.11/Multi-Use Path Along Ditch RoadCity of Carmel Project 16 -ENG -20
Multi Use Path along Ditch Road
CHANGE ORDER #2
Subgrade Treatment, HMA Transfer Machine, and Pipe Credit
Contract Price prior to this Change Order $1,232,332.90
----------------------------------------------------------------------------------
Contract Price will be increased/decreased by this Change Order
-------------------------------------------------------------------------------------------
New Contract Price including this Change Order
------------------------------------------------------------------------------------------
$62,503.1 l
$1,294,836.01
Amount
Adjusted Contract
Price
Cumulative % Change
from Original Contract
Original Contract $1,205,628.00
$1,205,628.00
N/A
C01 $26,704.90
$1,232,332.90
2.22%
CO2 $62,503.11
$1,294,836.01
7.40%
CiTY OF CARMEL
TO:
CONTRACTCHANGE ORDER NO.: 2
I. "here sub. -rade is not suitable to construct the trail, excavate, instnll gcogrid, and place compacted aggregate.
DATE: 8/30/2017
Millennium Contractors
PROJECTNAME: Ditch Road Path
1401 South Holt Road
CITY Ri:Q. NO.:
unsuitable site conditions.
Indianapolis, iN 46241
CITY PO NO.: 100284
ITEM
XI`TN: Andre%v Closser
Ci(Y PO DATE: April 5. 2017
03 - Common Excavation
1. You are directed to make the following changes in this Contract:
I. "here sub. -rade is not suitable to construct the trail, excavate, instnll gcogrid, and place compacted aggregate.
2. Provide an I iMA "transfer Machine to place surface, and base.
3. Provide a credit for using I IDPE pipe, and end sections instead of concrete
4. Additional days will he added to this contract due to unsuitable site
conditions. The contractor is entitled to 50 additional days due to weather, and
unsuitable site conditions.
SCHEDULED ADJUSTMENT
ITEM
AMOUNT
(+) OR (-) DAYS
03 - Common Excavation
513,300.00
+ 3 Day
21 - Compacted Aggregate, No. 53
$16,089.20
+ 3 Day
92 - Gcogrid for Subgradc Stabilization (Standard)
$3,900.00
+ 3 Day
93 - Gcogrid for Subgradc Stabilization (BX 1200)
$5,985.00
+ 3 Day
94 — Transfer Machine for HMA Placement
$29,929.90
+ 3 Day
95 — Credit for End Sections and Pipe
($6,700.99)
Additional Time for Unsuitable Conditions
+35 Day
II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this
Change Order: R.F.P.: W.D.C. No.:
The changes result in (lie following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 1.232.332.90
Contract Price will be increased/deefeased by this Change Order $ 62 503.11
New Contract Price including this Change Order $ 1.294 836.01
Contract Time Prior to this Change Order 114 Days 7/28/2017 Completion Date
Net increased/desRrresulting from this Change Order 50 Days
Current Contract Time including this Change Order 164 Days 9/16/2017 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting
from the performance of the changed work.
The Above Changes Are Recommended
USI Consultants, Inc.
ENGINEER
8415 East 50 Street
Indianapolis, IN 46216
City/State/Zip
By: J
Phone: r 4 y I — 37x1
Date: S 30 2a 17
The Above Changes Arc Accepted:
Millennium Contractors
CONTRACTOR
1401 South Flolt Road
Indianapolis, IN 46241
City/State/lip
By: L zv� '0
Phon 3�ii _ L/ C&
,1Ot Christine S. Pauley, Clerk -Treasurer
9130 X01-7 U
Date: Date: 20 IV -17 WOO.
Approved:
ere y %t. Kashman, City Engineer
alFo
consultants
Description:
Change Order:
Status:
Type:
Summary:
USI Consultants, Inc.
Change Order Details
Ditch Road Path
City of Carmel Project No. 16 -ENG -20 Multi Use Path Along Ditch Road
Pending Approval
Changed Conditions
Date Created: 07/28/2017
Date Approved:
Add additional geogrid for subgrade stablilization, HMA Transfer Machine, and
Pipe Credit
Change Order Description: Geogrid, Compacted Acrcrrecrate. and Common Excavation for Sub rade
Treatment
After a proof roll of the existing subgrade it was determined that Geogrid,
Compacted Aggregate, and Common Excavation will be required in order to
stabilize the subgrade. This work will cost an additional $39,274.20 to
complete.
Required Quantities For Geogrid:
STA 28+00 to 51+50 = 1,200 SYS (Regular Strength)
STA 52+00 to 62+29 = 1,100 SYS (BX 1200 or Equal)
HMA Transfer Machine for Placement of Surface and Base
An HMA Transfer Machine will be used to place materials for the trail in
order to provide a lower loading on the compacted aggregate. This will
provide a better trail by not placing a high loaded weight on the base
material. This work will cost an additional $29,929.90 to complete.
Credit for Use of HDPE Pipe
The contractor has provided a credit in order to use HDPE pipe in place
of the concrete pipe specified.
Awarded Project Amount:
$1,205,628.00
Authorized Project Amount:
$1,232,332.90
Change Order Amount:
$62,503.11
Revised Project Amount:
$1,294,836.01
Change Order Details: Ditch Road Path Page 1 of 3 08/30/2017
Increases/Decreases
Line Nu�iiber': Item Unit •.'
.Pending Quantity•"
'Unit Price.
:"Line Number" Item . ' "
Unit.
Unit Price
_, • ' Current
Change ''"
"'"` devised "
t ,. .•"
SYS
1,140.00
Quantity Amount 'Quant ity•
Amount
Quantity':, -
Amount
Section: 1 - Default Section
Reason: Stabilize Subgrade
0940 Ditch Road Path 94
5 Ditch Rd Path 5
CYS
$70.000
1,176.90 $82,383.00
190.00
$13,300.00
1,366.90
$95,683.00
EXCAVATION, COMMON
Reason: Lower Load on Trail During Placement
0950 Ditch Road Path 95
LSUM
Reason: Stabilize Subgrade
-$6,700.990
-$6,700.99
Credit for Pipe and End Sections
21 Ditch Rd Path 21
TON
$42.340
2,095,30 $88,715.00
380.00
$16,089.20
2,475.30
$104,804.20
COMPACTED AGGREGATE NO. 53
BASE
_ ...
Reason: Stabilize Subgrade
0920 Ditch Road Path 92
SYS
$3.250
1,522.00 $4,946.50
1,200.00
$3,900.00
2,722.00
$8,846.50
Geogrid for Subgrade Treatment
Reason: Stabilize Subgrade
'(3Itsms)
• Totals
$176,044.50
$33,289.20
$209,333.70!
New Items
Line Nu�iiber': Item Unit •.'
.Pending Quantity•"
'Unit Price.
Do1larAmount
Sectioni:l -'Default Section
0930 Ditch Road Path 93
SYS
1,140.00
$5.250
$5,985.00
Geogrid for Subgrade Treatment BX1200 or Equal
Reason: Stabilize Subgrade
0940 Ditch Road Path 94
TONS
1,183.00
$25.300
$29,929.90
Transfer Machine For HMA Placement
Reason: Lower Load on Trail During Placement
0950 Ditch Road Path 95
LSUM
1.00
-$6,700.990
-$6,700.99
Credit for Pipe and End Sections
Reason: HDPE Supplied - Concrete Required
Total:
+$291213.91
_ ...
Time Limits
"Type Original Deadline Authorized Deadline". ". Pending Extension Pending Deadline!
Completion Date 07/14/2017 07/28/2017 50 Days 09/16/2017
Substantial Completion
Reason: Unsuitable Weather and Added Work
Completion Date 08/12/2017 08112/2017
Final Completion
Reason: Unsuitable Weather and Added Work
(2 Time Limits) "
49 Days 09/30/2017
Change Order Details: Ditch Road Path Page 2 of 3 08/30/2017
This change order is approved for construction.
amu/ 7
Scott Dick - USI Csultants Inc. Date
4,4'PA-4�\' (036h:2
Millennium ntractors, LLC Date
J313117017
Cit of armel Date
Change Order Details: Ditch Road Path Page 3 of 3 08/30/2017