Loading...
HomeMy WebLinkAbout03070151.1324'-8" GOOF PLAN 26-8" 24'-8" 4T-8" 22'-4 26-8" 1' 4' 16' 0 2' 8' 32' W z m LU n z x LL 4 , FLA5HING DETAIL A2.5 2 8 a n 1° 4- 1 218'-4" 5 A2.5 5CUFFEK DETAIL 1' 4" 1' ■ 0 2' 6" 2' 2 A2.5 GENEKAL NOTE5, TH15 SHEET: Revised / Issued: 9-6-02 Issued for f H I'('!t i t er t(t re plttnniIt interior dei„ n N 2.35'-1 Kemper I.an Cincinnati, 011 454 N TFL: 513.75.1.122 FAX: 513.751.092 �J O O 1. Provide draft stops in between Roof & First Floor ceiling. Draft stops to be provided oo max. area between stops equals 9,000 o.f. and max. horizontal distance equals 100 ft. Typical draft stop to be 1/2" gypsum board mounted to one side of roof truss, and running from underside of roof sheathing to upperoide of ceiling. O CON5TKUCTION NOTE5, TH15 5HEET: PARAPET DETAIL 1. Firestone EPCM fully adhered roofing system: 60 mil. membrane over 1 1/2" insulation & 5/8" substrate on tapered roof trusses. 51ope minimum of 1/4" per foot ao shown. 2. Roof saddle, slope as indicated. 3. 4"0 interior roof drain w/ dome top, run line to inside of wall in truss space ao shown. 4. 5 3/8x8" scuppers, see 3/A2.5. 5. Metal coping over parapet wall, see 1/A4.1 & 2/A2.5. EPPM to wrap over parapet construction and be covered by coping per manufacturer's requiremento. 6. Firestone roofing system on 2x8 wood rafters @ 16" o.c, see 1/A4.2. 7. Pre-engineered roof trusses 0 24" o.c. 8. 2x4 kicker. 9. Parapet wall: 2x4 wood studs 0 16" o.c., 3 1/2" batt insulation w/ vapor barrier, 1/2" exterior grade sheathing, tyvek building wrap and 3 5/8" face brick on exterior. 10. 2x4 kickers Cad 48" o.c. 11. Sealant. 12. Cell vent @ 32" o.c. located in head joints near top of wall, typ. 13. Pressure treated 2x blocking. 14. 1" mortar net over counter flashing. 15. Typical roof penetration per manufacturer's recommendations and standard details. STEM SCHAI ASSOCIATES, CONSULTING ENG 10411 MEDALLION DRIVE, CINCINNATI, OHIO 4 (513) 542-3300 FAX: (513 Cornette and Associ Design Consultan 2142 Alpine Plac Cincinnati, Ohio Phone (513) 221 - Fax (513) 221-66 n LLI c0 2002 CMC Pr Thio document and tl deoigno incorporated V property of Speer & Aon are not to be. used or r whole or in part for ani or purpooe without authorization of CMt Date: 5h MAR. 2002 Job No.: ■ 1. Firestone EPCM fully adhered roofing system: 60 mil. membrane over 1 1/2" insulation & 5/8" substrate on tapered roof trusses. 51ope minimum of 1/4" per foot ao shown. 2. Roof saddle, slope as indicated. 3. 4"0 interior roof drain w/ dome top, run line to inside of wall in truss space ao shown. 4. 5 3/8x8" scuppers, see 3/A2.5. 5. Metal coping over parapet wall, see 1/A4.1 & 2/A2.5. EPPM to wrap over parapet construction and be covered by coping per manufacturer's requiremento. 6. Firestone roofing system on 2x8 wood rafters @ 16" o.c, see 1/A4.2. 7. Pre-engineered roof trusses 0 24" o.c. 8. 2x4 kicker. 9. Parapet wall: 2x4 wood studs 0 16" o.c., 3 1/2" batt insulation w/ vapor barrier, 1/2" exterior grade sheathing, tyvek building wrap and 3 5/8" face brick on exterior. 10. 2x4 kickers Cad 48" o.c. 11. Sealant. 12. Cell vent @ 32" o.c. located in head joints near top of wall, typ. 13. Pressure treated 2x blocking. 14. 1" mortar net over counter flashing. 15. Typical roof penetration per manufacturer's recommendations and standard details. STEM SCHAI ASSOCIATES, CONSULTING ENG 10411 MEDALLION DRIVE, CINCINNATI, OHIO 4 (513) 542-3300 FAX: (513 Cornette and Associ Design Consultan 2142 Alpine Plac Cincinnati, Ohio Phone (513) 221 - Fax (513) 221-66 n LLI c0 2002 CMC Pr Thio document and tl deoigno incorporated V property of Speer & Aon are not to be. used or r whole or in part for ani or purpooe without authorization of CMt Date: 5h MAR. 2002 Job No.: