HomeMy WebLinkAbout03070151.1324'-8"
GOOF PLAN
26-8" 24'-8"
4T-8" 22'-4
26-8"
1' 4' 16'
0 2' 8' 32'
W
z
m
LU
n
z
x
LL
4 , FLA5HING DETAIL
A2.5 2 8
a
n 1° 4- 1
218'-4"
5
A2.5
5CUFFEK DETAIL
1'
4"
1'
■
0 2'
6"
2'
2
A2.5
GENEKAL NOTE5, TH15 SHEET:
Revised / Issued:
9-6-02 Issued for f
H I'('!t i t er t(t re
plttnniIt
interior dei„ n
N 2.35'-1 Kemper I.an
Cincinnati, 011 454
N TFL: 513.75.1.122
FAX: 513.751.092
�J O
O
1. Provide draft stops in between Roof & First Floor ceiling. Draft stops to be
provided oo max. area between stops equals 9,000 o.f. and max. horizontal distance
equals 100 ft. Typical draft stop to be 1/2" gypsum board mounted to one side of roof
truss, and running from underside of roof sheathing to upperoide of ceiling.
O CON5TKUCTION NOTE5, TH15 5HEET:
PARAPET DETAIL
1. Firestone EPCM fully adhered roofing system: 60 mil. membrane
over 1 1/2" insulation & 5/8" substrate on tapered roof trusses.
51ope minimum of 1/4" per foot ao shown.
2. Roof saddle, slope as indicated.
3. 4"0 interior roof drain w/ dome top, run line to inside of wall in truss
space ao shown.
4. 5 3/8x8" scuppers, see 3/A2.5.
5. Metal coping over parapet wall, see 1/A4.1 & 2/A2.5. EPPM to wrap over
parapet construction and be covered by coping per manufacturer's
requiremento.
6. Firestone roofing system on 2x8 wood rafters @ 16" o.c, see 1/A4.2.
7. Pre-engineered roof trusses 0 24" o.c.
8. 2x4 kicker.
9. Parapet wall: 2x4 wood studs 0 16" o.c., 3 1/2" batt insulation w/ vapor
barrier, 1/2" exterior grade sheathing, tyvek building wrap and 3 5/8" face
brick on exterior.
10. 2x4 kickers Cad 48" o.c.
11. Sealant.
12. Cell vent @ 32" o.c. located in head joints near top of wall, typ.
13. Pressure treated 2x blocking.
14. 1" mortar net over counter flashing.
15. Typical roof penetration per manufacturer's recommendations and
standard details.
STEM
SCHAI
ASSOCIATES,
CONSULTING ENG
10411 MEDALLION DRIVE,
CINCINNATI, OHIO 4
(513) 542-3300 FAX: (513
Cornette
and Associ
Design Consultan
2142 Alpine Plac
Cincinnati, Ohio
Phone (513) 221 -
Fax (513) 221-66
n
LLI
c0 2002 CMC Pr
Thio document and tl
deoigno incorporated V
property of Speer & Aon
are not to be. used or r
whole or in part for ani
or purpooe without
authorization of CMt
Date: 5h
MAR. 2002
Job No.:
■
1. Firestone EPCM fully adhered roofing system: 60 mil. membrane
over 1 1/2" insulation & 5/8" substrate on tapered roof trusses.
51ope minimum of 1/4" per foot ao shown.
2. Roof saddle, slope as indicated.
3. 4"0 interior roof drain w/ dome top, run line to inside of wall in truss
space ao shown.
4. 5 3/8x8" scuppers, see 3/A2.5.
5. Metal coping over parapet wall, see 1/A4.1 & 2/A2.5. EPPM to wrap over
parapet construction and be covered by coping per manufacturer's
requiremento.
6. Firestone roofing system on 2x8 wood rafters @ 16" o.c, see 1/A4.2.
7. Pre-engineered roof trusses 0 24" o.c.
8. 2x4 kicker.
9. Parapet wall: 2x4 wood studs 0 16" o.c., 3 1/2" batt insulation w/ vapor
barrier, 1/2" exterior grade sheathing, tyvek building wrap and 3 5/8" face
brick on exterior.
10. 2x4 kickers Cad 48" o.c.
11. Sealant.
12. Cell vent @ 32" o.c. located in head joints near top of wall, typ.
13. Pressure treated 2x blocking.
14. 1" mortar net over counter flashing.
15. Typical roof penetration per manufacturer's recommendations and
standard details.
STEM
SCHAI
ASSOCIATES,
CONSULTING ENG
10411 MEDALLION DRIVE,
CINCINNATI, OHIO 4
(513) 542-3300 FAX: (513
Cornette
and Associ
Design Consultan
2142 Alpine Plac
Cincinnati, Ohio
Phone (513) 221 -
Fax (513) 221-66
n
LLI
c0 2002 CMC Pr
Thio document and tl
deoigno incorporated V
property of Speer & Aon
are not to be. used or r
whole or in part for ani
or purpooe without
authorization of CMt
Date: 5h
MAR. 2002
Job No.: