Loading...
HomeMy WebLinkAbout03070151.18C, � 2\ %-�1_Viiviv �:w t_iv1,",1 A4.2 6„ 2 1CI, 0 1' S' LOBBY CONTINUE WALL AT DOOR OPENINGS BARS THRU HOLD TOP OF WALL TURNED DOWN DOWN 8" & EXTEND SLAQ @ OPENING SLAB THRU 2" EXPANSION /� #4 BENT BARS 1 JOINT MATERIAL / @ 18"o.c. 0 F SLOPE EXTERIOR SLAB M�-�r-� 6 W #4x3'_0>, & BOTTOM 1)P @ 18"o.c. T FTG. ot a l SEE PLAN #4 BENT BARS 6„ 12;; 6„ (2) #5 2'- 0" ENTRY SLAB DETAIL 3„ I, Sheet Number 4, Job No.: AA4-d 0 6' 2' 81 V 1 � CONSTRUCTION NOTES, TH15 SHEET: 1. 4" concrete slab w/42# w.w. mesh & 6 mil. vapor barrier over 6" granular base over well compacted subgrade. Hold down top of wall 8" and carry slab through as Shown. 2. Concrete elevator pit walls w/ #4 0 12" o.c. each way. 3. 12" deep x 24" wide concrete footing w/ (2) #5 cont. on undisturbed earth. 4. Min. 18" granular backfill over drain tile. 5. Drain tile, see Site Plan. 6. Foundation waterproofing. 7. Sump pump pit, coordinate size and location w/ elevator manufacturer. Coordinate piping with manufacturer. 8. Provide weep holes 0 32" o.c. above continuous flashing. 9. 16" pre-engineered wood floor trusses 0 12" o.c. 10. 3/4" tongue and groove 0513 subflooring or plywood at tile locations. 11. Parapet wall construction consisting of 2x4 wood studs 0 16" o.c., 3 1/2" batt insulation with vapor barrier, 1/2" exterior grade sheathing (both sides), tyvek building wrap and 3 5/8" face brick on exterior (unless noted otherwise). 12. Metal coping over 2x wood blocking, flash and seal each side. 13. 1/2" gypsum board ceiling over 3/4" furring @ 3rd Floor and 1/2" K. C. channels @ lot and 2nd Floors. 14. 2x4's @ 12" o.c. this wall only. 15. Interior wall construction consisting of 2x4 wood Studs @ 16" o.c. and 1/7" n\inGiim hnarA hni-k GI/lPG (IIVIIOGG vnntoA nt.hvrwic,v 16. Batt insulation. Al"�17. Ledger: (1) 1 3/4x16" LVL. Provide expansion bolts to bond beam or grouted cell CMU w/ 2" bolts 0 8" o.c., staggered, embedded 5" into block. 1 1/2" nails required for hangers at these locations. 18. Pre-engineered wood roof trusses 0 24" o.c. 19. Beam: (3) 1 3/4x16" LVL, flush. 20. Firestone EPPM roofing over 11/2" insulation and 5/8" plywood substrate. 21. Suspended acoustical tile ceiling. 22. 2x8's 0 12" o.c., joist hanger ea. end. 23.12" deep concrete footing w/ #5 0 12" o.c. each way. 24. 8" CMU wall w/furring and 1/2" drywall, as shown. 25. Face brick Color Type 2, see elevations for locations. 26. 2x8 rafters @ 24" o.c. 27. Curtain wall System, see plans for type and locations. 25.1/2" expansion joint. 29. 2" perimeter inoulation. 30. [)cubic stud plumbing wall consisting of (2) 2x4 studs @ 16" o.c. (unless otherwise noted), with 1/2" drywall on office side and 1/2" greerlboard on toilet room side. 31. 2x6s C@ 16" o.c. this wall only. n32.Ledger: 2x8 expansion bolted to bond beam or grouted cell CMU w/bolts @ 24 o.c., embedded 5 into block. 11/2" nails .,.--..: A Ic- L--- 'i- t kl '5c v nr.at.InYI G, 33. W8xl8 hoist beam, center over elevator Shaft. 34. 5/8" gyp. bd., 1 -hr. Shaft assembly termination. 35. Precast concrete lintel. 36. 2x8 attached to truss ends. 37. Steel angle sill Support. 38. Elevator entrance frame. 39. 2x4 kickers 0 48" o.c. 40. 2x8 rafters 9 16" o.c., use double sill plate @ one end to slope roof as shown, slope min. of 1/4" per foot. 41. W8x21 w/ 2x6 top and bottom, bolted 3'-O" o.c. 42. W10x39 w/ 2x6 top and bottom. bolted 3'-0" o.c. 43. Temp. glass in steel frame railing, see sheet A4.4. 44. W16x26 w/ 2x6 top and bottom, bolted 3'-0" O.G. 45. Steel lintel: L 8x4x2", rolled to match opening Shape w/ 8" horizontal bearing leg on each side. Provide weep holes @ 32" o.c above angle and backer rod & sealant below angle, typical. 46. Beam: T5 10x4xl/4", flush, w/ 2x4 top and bottom. 47. Header: (2) 1 3/4x11 1/4" LVL, flush. 48. 4" face brick over 4" block. 49. GE Zoneline thru-wall HVAC unit. 50.4" exterior concrete slab, slope away from building maximum of 1:20. 51. 12"x24" concrete footing, sleeve for plumbing linea. Kevised / Issued: 9-6-02 looued for Permit 1-8-03 Addendum L arc ?[ii ecrure planning i.r,kcr.ior dceig,n 1:159 Kemper l.;ine Cinc.ir,rtati, Oil 4520 TEL: 51:1.751..1221 FAX: 511,751.0922 STEVEN SCHAEFER ASSOCIATES, INC. CONSULTING ENGINEERS 10411 MEDALLION DRIVE, SUITE 121 CINCINNATI, OHIO 45241 (513) 542-3300 FAX: (513) 542-5540 Cornette and Associates Design Consultants 2142 Alpine Place Cincinnati, Ohio 45206 Phone (513) 221-6600 Fax (513) 221-6606 W c0 2002 CMC Properties Thio document and the ideas and designs incorporated herein are the property of Speer & Associates. They are not to be used or reproduced in whole or in part for any other project or purpose without the written authorization of CMC Properties. Date: Sheet Number MAR, 2002 Job No.: AA4-d