Loading...
HomeMy WebLinkAbout03070145.304 3 h in iA n C-4 201-40 as' -01 i-0■ 3'-4 3/8' V-15/80 5/8' pop 3'-10' 4'-3 1/8' 4'41 3/41 4'41 3/4' 33'-4" I1'-5 3/8' 8' CONCRETE BLC FOUNDATION WALL �%—LOWER LEVEL PATIO *l' AREA AS 61 TSCJRW 8'-4' ------------- -- FULL GLASS YVJ ` ?►` '---_ P-3686 --5656 --------------------- OC -2456-3----- - ---- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I MAXIMUM POURED WALL HEIGHT N WINDD ED AREAS 36" TALLW u1 } 1------------------------------------------------------------------%1 NOOTHERWISE. ALL -3 WINDOWS WI F EGRESS MUST BE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - •- - - - - - - - - I ' ` \ ` ` _ _ 81Z.® AS ACCORDNG TO CODE. �il m I 128 AND BOTTOM OF WINDOW TO BE ; - � Q p � Q � LINTEL AT OVER DIG ; _ , MAX. HT. 42 A.F.F. � � o jg p� . I AS REQUIRED, all_ ---------- ------ �i ~�U. POCKETS BY CONC. '-3 IV66" 5'-10 13 Ib' WALL CONTRACTOR BASEMENT LAYOUT = 4�y o� I ; ■ .� h , I Q 1i idu' LN W 9 -2 9' POURED CONC. WALLS W! TH{GKNESS = it1 ; } AND RBINFORCNG STEEL AS REQ 0 BY r n w 'u d� ' I LOCAL BULONG CODES. 2 gin Q Q O r- 4' CONC. SLAB FLOOR OVER Q 40 D . 0 4' MIN. GRAVEL FILL. Gs - 'N GARAGE SEAS 4 g' g I 1 4' =NC. SLAB FLOOR OVER ; 6'$' 29'-1 V2' 12'-4" 10'$ 1/2' D Q 1 ESS TO STORAGE ----------------------------- u I I4' MIN. GRAVEL FLLbm BEARNG WALL W/ STAR HERE • T14WXENED SLAB BY 0 2'-6■ 0 -ta' }Qr� O I . -------------------------------- r 1 CONCRETE FLOOR DONT, 17 -SLI' � \/ I oFLOOR DRAIN. SLOPE ;-------------------------------------------------------------f------ ---------, SLAB FL TO DRAIN O ;-----------�' _---E-1 , ----------------------------------- -- - 1 1 I IO rG RI M�� WI �iNFINISHED BTOR.I 1 � ��//�_r/._p` I 1 \ MECHANICAL1 - J _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - 1 O 1 FLOOR DRAM 1 I • - - - - - - - - - - - - - - - - - 1. ------------------------------------------ 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I I I I r --- O I I I 1 I I 1 "' " _ I I I 1 W.A. A I , I I ® HYAG 7 I 1 I I I - - - - - - - - - - - - - - - - - - - --------- -------- - - - - - - - - - - - - - - p 1 0 -------------------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----------------------------------------- V-20 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- I. - - I I , . 4 V •v V 4 V a .o . V V V Q .v 6' v V a o 20'-0' .0 4'-6' 20'-91/2" ; 1 C I , �' , I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - o too ' BEARIA1Ca WALL W/ : I THICKO-AM SLAB BY i---------------------------------®---------------------------------, CONCRETE FLOOR CONT. 1 I I I I I I I I I I 1 1 I , UNFINISHED STOR. MECHANICAL 1 1 I I D I � I 1 0% 1 I I i I I I i I ' • ' I , 1 e SUMP PIT — EXCTOR PIT I I I • I I I � 1 00 1 1I11--------------------------------IQrL -------------------------------- 04 I '--------------------------------------- PORCH SLAB ------------------------------------------ ` 1I \ FLOOR DRAM, SLOPE ® j \ SLAB FL. TO DRAM LINTEL AT OVER D1Cs 4■ ■ GONG. SLAB FLOOR OY@2 AS REQUIRED, ALL 4 MIN. GRAVEL FILL. POCKETS BY CONC. WALL CONTRACTOR GARAGE SLAB ------------------------------------------ 4m ------------------------- - -- 4' 1 1 4' MN. GRAYFI FILL.'•----------------------------------------------------------------------- ---- 1 I I 1 1 1 I 1 1 1 1 1 1 1 1 I I I I I 1 I I 1 I I 1 I I I 1 1 I I 1 I 1 I 1 1 I I 1 ---------------------------- ------------------------------------- � I 1 I 2'-21 9'-3" 1'-4' 9'-3' 21-4' 10'-0' 14'-+8' 13'-4' Ii' -4' 15'-4' 241-40 24I -so _ _ Z6'-41' �1$r 89'-01 FOUNDATION PLAN SCALE: 1/4" • 1'-0" 2120 S.F. a 4p 4' CONC. SLAB ON 4' MIN. PEA FILL, THICKEN EDGE - - top of floor sheathing A — top of foundation top of fill ' X 16" CONTINUOUS REINFORCED y - — o ° top Of footing CONCRETE FOOTING ;T TYPICAL SLAB SECTION SCALE: 1/211 ■ 1'-0" BRICK OPENING TRIM DROP 8' AT OPENING, POUR SLAB THROUGH W/ 1' WATER STOP DROP 8' C.M.U. FOUNDATION WALL FOUNDATION DETAIL is GARAGE OPENING SCALE: 1/2" ■ 1'-0" GENERAL FOUNDATION NOTES: U ALL SOIL 18 BASED ON 2800 P.S.F., AND CONCRETE IS BASED ON 3000 P.S.I. • 28 DAYS, FOOTERS ARE 16' WIDE AND 8' DEEP UNLESS NOTED OTHERWISE ON PLANS. 2) BASEMENT WALL HEIGHT AS NOTED ON PLANS, W/ SHORT WALLS 0 CRAW.. SPACE OR SLAB BELOW FROST LINE AS REQUIRED, 3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND A0GE FOR THEMSELVES, THE SUITABILITY OF THE PLANS IN RELATIONSHIP TO THE BUILDING SITE, AND EXISTING GRADES, 4) THESE DRAWINGS SERVE AS A GUIDE TO THE CONSTRUCTION OF THE BUILDNG, DUE TO VARIATIONS IN DIFFERENT GEOGRAPHICAL AREAS, THEY CAN ONLY BE A GUIDE, AND N NO WAY DICTATE ANY OF THE LOCAL AND/ OR STATE BUILDING CODES, IT 16 THE CONTRACTORS FULL RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCURACY AND CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ERRORS N DESIGN, DIMENSIONS OR OMISSIONS, 5) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEED, AND MAY CHANGE AT ANY TIME, IT IS THE CONTRACTORS RESPONSIBUTY TO VERIFY ACTUAL NEED AND SIZES IF NOT SHOWN, 6) ALL WAI I W/ BRICK ARE 8", ALL OTHERS TO BE 3-1/2" UNLESS NOTED OTHERWISE ON PLANS. v ALL CEILINGS ARE S' MAIN LEVEL AND 8' UPPER LEVEL OR AS NOTED ON PLAN FOR INDIVIDUAL AREAS. 8) ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR IMMEDIATELY BEFORE CONSTRUCTION IS TO RESUME, TO INSURE PROPER STEPS ARE TAKEN.AAAA D wALL e' GONG. LINTEL D D D A A FOOTER FOR CONCRETE BASEMENT WALL LINTEL DETAIL FOR BASEMENT SCALE: 1/4" ■ 1'-0" 8"x16" C.M.U. OR POURED CONC. AS SPEC IFIED FOOTER FOR SHORT WALL O } H !Y W O CL Li J O W W Ir Q V) O z 3 Q 0 o N N LJ H DATE: O1 DRAWN BY: JJ SCALE: A� REVISIONS: 02-1Z-03: REVIEW PLANS 03-22-03: REVIEW PLANS 03-28-03: REVIEW ELEVA 04-22-03: PRELIMINARY 05-18-031 REVISED PRET 06-05-03: FINAL PLANS SHEET H to U cd woo 0 0 � Q O } H !Y W O CL Li J O W W Ir Q V) O z 3 Q 0 o N N LJ H DATE: O1 DRAWN BY: JJ SCALE: A� REVISIONS: 02-1Z-03: REVIEW PLANS 03-22-03: REVIEW PLANS 03-28-03: REVIEW ELEVA 04-22-03: PRELIMINARY 05-18-031 REVISED PRET 06-05-03: FINAL PLANS SHEET