Loading...
HomeMy WebLinkAbout025,026-93 Ponds West Erosion Control.2CONSTRUCTION SEQUENCE I) Instoll silt Crops 2) Construct detention basin o,d outfoll structure 3) Strip and stockpile topsoil 4) Rough grading 5) Construct swo les and storm sewers, instoIIiog sumps and slit fence 6) Utility installation 7) Curbing and paving 8) Final groding 9) F ina I seeding and I orxlscop i rag NO TES, Erosion control blankets to have a minimun velocity rating of 3 ft/sec. LAKE BANK SEEDING - Use seeding chart sheet 51. SEEDING BEHIND CURB - Use seeding chart sheet 51. Lake bunk seeding and swole seeding to be permment seeding. Seeding behind curb and mound seeding to be taWrory seeding. LEGEND 0 TEMPORARY SILTATION SUMP TEMPORARr SILTING PIT 0 RIP -RAP D50 •7' O SILT FENCE OR STRAW BALE DAU SEEDING BEHIND CURB, MOUND SEEDING (REGUIRED BEHIND ALL CURB) ®EROSION CONTROL BLANKET/ SWALE SEEDING/ LAKE BANK SEEDING NOTE, SEE DETAILS ON SHEET 51 NOTE, All inlets droining directly to Aillians Creek will require Grovel Curb Inlet Protection (see detoil sheet 51). 146th STREET &;. hn ,t av Sections 1-4 are to be approved and constructed at this time. Section 5 to be- approved and constructed at a later date. 4/1/93 Spri�rt`iU. P°n(jglvd.. PONDS WEST Revisions and Dotes Designed by: BEH ,N1U1 nttt�t ,,� E � 800 n��� ��,V;.iS7n��, Q: '�� Fo•. G �` No. = S 0 4 4 1 : Z' 10�, STATE of � �'-,,,lql;�� �° � . v�yo�,•�' �etttrS�R1110 � o W&ERp"mr, GG MSE Corporation 501 Congressional Boulevard Suite to 1 10 Car -me I , I N 46032 317 843-5080 317 843-5089 FAX �' Title: EROSION C PLAN 3 I e , r S C / e c e Z/ 9 9 i Drawn by: DSC Checked by: BEN Approved by: SEB Dote: Scads: =1 QQ' Job NO.: q - 0522 Sheet No.: 50 of 52 DGN: 522ER02.DGN PRF: 522ER02.PRF