Loading...
HomeMy WebLinkAbout002-88 Tedco Detail SheetWEST / STR T .. 11 _ Out"Lr+iy of Alt (14jnv1 � Q �. }. - J1, i J .-� ,IBJ - � ` -- - .. /// -� '\ ,�'I o •• !� !�� �, , WT 4 � •Se _ T 2 3tT+ / - � . • �, , / . •. '• •g7s /%/ / • ' // Zii em tery / _� __ -- 136TH1-_ _ ----- --- ' ----�_ / � h --- 7 PIP 10- L • • , - 3t_chxut ra I b� �• ' 1' _ '�' -2 / E� -tt // cn' ' ri�tj1R 2 IT 79I • - •�z -• -� WEST -__l ,�!$T_--. 97, L ' --- 5T = _ =:-wES '-iN ST _ �1 2 /� 26� �5 Carmel /Ji- I• High � � , Ii1 EMERSON RO I' C coue woos ti, --T esL 8�5- Y 4 =z- e rr� eI _.�• BSJ __ &.S EAST 111tiTM 'J1&0 _ 1_ '•" r1• -� 0 LL r- Ir" ' n r ' 4,� �' • ems- II CERTIFIED BY DATE FARTFRN FNGINEERING. 2-86. DPS -3G10 502624 wolffi geA4,t / '•--Z.,000 1 REVISIONS J —STEEL FEN::EPOST (for tsmporory protection) DITCH GRATE CASTING SETTING DETAIL PLAN SECTION NOTE MANHOLE CASTINGS SHALL BE NEENAH R -1772-A or EQUAL FINISH GRADE TO DRAIN 0.11 AWAY FROM CASTING 1 111 I — MAX. 8" CONC. RISERS TO ADJUST CASTING TO DI MATCH FINISH GRADE I/2" MORTAR GROUT (SIDES a TOP) COMPRESSION JOINT (TYP) (ASTM C-433 MANHOLE STEPS 16"O.C.NEENAH 0 1980 C o, equol ) r REINF CONC. PIPE OR -RADIAL CONC. BLOCK. CONTINUOUS FL.THRU H. 2i1 GROUT SLOPE SEWER 'MPRESSION JOINT 0.3 LATERALS ENTERING M . CONC. BASE. SMALL BE PLACED AT 4 --COC DiA Ef' q° BENCH LEVEL. STANDARD MANHOLE FOR SANITARY SEWERS AS ILLUSTRATED NOT 70 SCALE Ct►ST I N C A B SET FLUSH W/ FINISH �pST JORDAN CASTING 1570 or EQUAL I GRADE --� /-- R -2544 -EI 27 D1unETER ' 4 247-1 y R -j501 25 27" l• . L z a, a > a W � Z W - m DIRECTION OF FLOW R-4342 Ditch Grate, Stool Type '-CA 8'x 611x 611 TEE M•dwm Duty - ,mol wefyhe 190 iovd+ E.1 Z1 20 SUBSURFACE DRAIN (SSD) RISER DETAIL NO SCALE TDP OT -7i (T.L*1 WkME DITCH GRATE CASTING SETTING DETAIL PLAN SECTION NOTE MANHOLE CASTINGS SHALL BE NEENAH R -1772-A or EQUAL FINISH GRADE TO DRAIN 0.11 AWAY FROM CASTING 1 111 I — MAX. 8" CONC. RISERS TO ADJUST CASTING TO DI MATCH FINISH GRADE I/2" MORTAR GROUT (SIDES a TOP) COMPRESSION JOINT (TYP) (ASTM C-433 MANHOLE STEPS 16"O.C.NEENAH 0 1980 C o, equol ) r REINF CONC. PIPE OR -RADIAL CONC. BLOCK. CONTINUOUS FL.THRU H. 2i1 GROUT SLOPE SEWER 'MPRESSION JOINT 0.3 LATERALS ENTERING M . CONC. BASE. SMALL BE PLACED AT 4 --COC DiA Ef' q° BENCH LEVEL. STANDARD MANHOLE FOR SANITARY SEWERS AS ILLUSTRATED NOT 70 SCALE Ct►ST I N C A B Fk-1772-A ZS- DINwLTER R -2544 -EI 27 D1unETER R.3010 -A 4 247-1 5 25 R -j501 25 27" = D Z4- 2'1' 4El• 4'-0 3G r - 5.r• 4a• r.rr No'ye: DTRUc Tu REi To 6E CIRCU-F fk v� L ESS pT.�ERw.Sw iPwC.G.ED- 1 , � MAX • 6R 6c K B TE c[•tiE.rT P1.AST41Tfw •. r PRE NPOIICE0 - STE Ps RL9 u.RGo �� O.••CR ET>• ,1.� vwCRE DEPT"x"* C-� USE Lt., (CG.+CRETE HR.cx ,-� R- 1961- 1 oR IQL­L ' OPTIOw�I� D D .: `+ f h j03• GwovT xR .L �• �`-�n 7. CC.JC RGTC PAO L' UP TO S' DEPTH ' E• -A -.2' DEPTH .2 --OVER 12 DEPTH STORM MANHOLE f DEEP INLET N T S 1� O• �4R/ES SCE Pli�•r,/• • l .r. TY�,1exz- Pz�--TF�YT/ON z-1,q/<E 5ECRON EXISTING GRADE / PROPOSED GRADE UNDERCUT SWALE BY 0.Z' TO ALLOW FOR FUTURE SILTING TYPICAL SWALE DETAIL SCALE NONE -- � Typical PROFILE VIEW L PLAN VIEW - For Length and Width Ste -Plans TEMPORARY SILTING PIT ( Ps r i odic Cleo Hrg R fir ed ) ANGLE FIRST STAKE TOWARD PREViOWSLY LAID 11ALE . � ��.��••� 'fro • CHINK GAPS 17 1 I 4. P, �,,} . r� ^•^ WOOD STAKES 1.9'-2.0' SECTION STRAW BALE DAM DETAIL PAULI CRIPE,INC CIVIL ENGINEERING TECH. CHK. DRAWN BY SCALE DATE CLIENT 717• LAND SURVEYING �1 A15dorms 1z -3o a� TE�XO COWT/ES 2 GRAHAM ROAD • ARCHITECTURE DFTNG. CNK. DRAWING TITLE INDIANAPOLIS, INDIANA 46250 . LAND PLANNING ��%�/L. J�'f'��% (317) 842 - 6777 - Secding Sneclflcatlons: 1. Scales/Grassed lfaterways: Permanent seeding shall take place between March 1 and May 15 or from August 10 to October 15 with the following per acre: 25if Kentucky 31 Fesque 151 Kentucky Blue Grass 10001 12-12-12 Fertilizer 30001 Mulch (Straw) 2. It grades are established between May 15 and August 10, a temporary seeding consisting of 401 of Annual Ryegrass shall be planted per acre. 3. If grades aro establlshod between October 15 and December 30, either Rye (grain) or hheat may be used at the rate of 2 bushels/Ac. Oats may be used for early spring planting at the rate of 3 bushols/Ac. All grabs should be cut at time of permanent seeding. All grains should be cut prior to seed maturing. 4. If temporary seed ing Is establlshod prior to permanent seeding, the mulch may be eliminated except In "Dare" areas. 5. If grading occurs during December, January, or February, no seeding to take place tlII spring planting time; however, It Is Imperative that all sediment filters and traps are In place prior to bulk oarthmoving or clearing. 6. All areas along street (approximately 25 foot behind curb) shall be seeded the same as swales. 7. All lots where grading has oeeured, shall be seeded with the temporary seoding process. 8. All dates shown are nominal, and may be varied with concurrence of the Engineer or the Local SolI Conservationist. ;oll Frosionrontral_Summary The following Is a list in sequence of constructlon activities to control soil erosion: 1. Contractor shal I. Install sedlmont traps and straw bale filters, as shown. 2. Mass grade the site (sides of swales, mounds and ponds to be seeded and mulched Immedlately upon completion). Temporary seeding shall be recommended for all swaIas and disturbed areas that cannot be final seeded within a time period that wlII prevent slope erosion. For tumporary seeding the contractor shall utilize a fast growing soed of either oats, annual ryegrass, wheat or ryo depending on time of year. Disturbed areas should be kept to a minimum at all times. 1 3. Contractor shall control mud accumulation on all streets surrounding project by installing stone surface at all locations where construction traffic leaves the site. Dust shall be kept to a minimum by utilizing sprinkling, Calcium Chloride, yogetaTivo cover, spray on adhesives or other approved methods. 4. Maintain all filters and ,traps during construction to prevent any blockages from accumulated sediment. Additional seeding and straw bales may be required during construction as specified by Engineer or Soil Conservation Service. Rlp rap shall be placed in areas of high velocity stream flow (minimum size 1/3 cu. ft.). Payment for additional straw bales shall be at the Contractors expense. Payment for additional rip rap (not shown on plans) and seeding shall be paid for on a unit basis. 5. Contractor shall Install all sanitary sewers, storm sewers, subsurface drains, and water mains. Straw bale filters shall be Installed at all storm Inlets (including street Inlets). 6. All proposed street areas shall be paved as soon as posslbla atter suDgrado Is prepared. 7. All disturbed areas shall be seeded and mulched as specified below. This shall Include all building pad fill areas. 8. Contractor shall remove all temporary erosion and sediment controls only when there Is a sufficient growth of ground cover to provent further erosion. DWG. TYPE FILE NUMBER SHEET 1— 2 JOB NUMBER 15 1714171a-00 000 OF