HomeMy WebLinkAbout039-99 DP-ADLS Office Bldg Prelim.1Match Line for
mmu(mmg Mgnsge
MGTSS i o n
24
8.0'
OF PLAZA ELEVATION AT LOWER LEVEL
PROPOSED CORPORATE HEADQUARTERS
SEE WEST ELEVATION FOR BUILDING
MATERIALS, HEIGHTS b FINISHES
STEPS DOWN FROM PLAZA LEVEL
SEE SOUTH ELEVATION
848,50'
TOP OF PLAZA ELEVATION AT
BUILDING ENTRY
849.50'
TOP OF PLAZA ELEVATION AT
OVERLOOK AREA
852.0'
TOP OF RET, WALL ELEVATION
AT OVERLOOK AREA
849.50_'
TOP OF RET. WALL ELEVATION
AT OVERLOOK AREA
TREE ALLEE / LANDSCAPE BELT -
SEE SITE LANDSCAPE DRAWINGS
NOTE:
ADDITIONAL SIGNAGE LETTERING
TO BE LOCATED ON CURVED RETAIN-
ING WALL WHERE REQUIRED
27" HIGH RAISED STAINLESS STEEL
LETTERS WITH GROUND UPLIGHT
ILLUMINATION - SEE SITE LIGHTIMG
DWGS.
LETTERING STYLE SHALL BE "TIMES
NEW ROMAN" 0
LETTERING SHALL BE SPACED AT 33"
O.C. - ALL CAPITALS
BOTTOM OF RETENTION POND ELEVATION VARIES
SEE SITE ENGINEERING DRAWINGS
nom go W-450 CcDg),§ m (I I ? r-OvA Non goms goa
7�91TOtnon f 0CpanM 0 Eno gAdIA(D-) M otgont
CD
Architects
Engineers
Interiors
MEDIUM GREY CAST STONE CAPS AT
SITE RETAING WALLS WITH DARK
GREY SMOOTH GLOSS FINISH 2-1/2"
O.D. HANDRAILS
ARCHITECTURAL PRECAST CONCRETE
PANELS TO MATCH BUILDING FINISH
(MEDIUM WARM GREY) OVER SITE
RETAINING WALLS
RETAINING WALL AT RETENTION POND
TO RECEIVE ARCHITECTURAL PRECAST
CONCRETE PANELS TO MATCH MEDIUM
GREY BUILDING FINISH W/ CAST STONE
WALL CAP - 18" WIDE
PRE�LI�MINARY DESIGN STUDY PHASE ONE OFFICE : UILDING Presented b-:
dq
t
r0 i
- :8DPro ose-d CorpOrate Hea
Oi��ce Building
„�E� IDIAN �. 10 : th STREETS
a
(USHM9
Mi vest
ents
�DLS S>.�il�nlitt�l
FIN. GRADE ELEVS. VARY
SEE SITE ENGR'G. DWGS. FOF
FOR SPOT GRADE EL