Loading...
HomeMy WebLinkAbout039-99 DP-ADLS Office Bldg Prelim.1Match Line for mmu(mmg Mgnsge MGTSS i o n 24 8.0' OF PLAZA ELEVATION AT LOWER LEVEL PROPOSED CORPORATE HEADQUARTERS SEE WEST ELEVATION FOR BUILDING MATERIALS, HEIGHTS b FINISHES STEPS DOWN FROM PLAZA LEVEL SEE SOUTH ELEVATION 848,50' TOP OF PLAZA ELEVATION AT BUILDING ENTRY 849.50' TOP OF PLAZA ELEVATION AT OVERLOOK AREA 852.0' TOP OF RET, WALL ELEVATION AT OVERLOOK AREA 849.50_' TOP OF RET. WALL ELEVATION AT OVERLOOK AREA TREE ALLEE / LANDSCAPE BELT - SEE SITE LANDSCAPE DRAWINGS NOTE: ADDITIONAL SIGNAGE LETTERING TO BE LOCATED ON CURVED RETAIN- ING WALL WHERE REQUIRED 27" HIGH RAISED STAINLESS STEEL LETTERS WITH GROUND UPLIGHT ILLUMINATION - SEE SITE LIGHTIMG DWGS. LETTERING STYLE SHALL BE "TIMES NEW ROMAN" 0 LETTERING SHALL BE SPACED AT 33" O.C. - ALL CAPITALS BOTTOM OF RETENTION POND ELEVATION VARIES SEE SITE ENGINEERING DRAWINGS nom go W-450 CcDg),§ m (I I ? r-OvA Non goms goa 7�91TOtnon f 0CpanM 0 Eno gAdIA(D-) M otgont CD Architects Engineers Interiors MEDIUM GREY CAST STONE CAPS AT SITE RETAING WALLS WITH DARK GREY SMOOTH GLOSS FINISH 2-1/2" O.D. HANDRAILS ARCHITECTURAL PRECAST CONCRETE PANELS TO MATCH BUILDING FINISH (MEDIUM WARM GREY) OVER SITE RETAINING WALLS RETAINING WALL AT RETENTION POND TO RECEIVE ARCHITECTURAL PRECAST CONCRETE PANELS TO MATCH MEDIUM GREY BUILDING FINISH W/ CAST STONE WALL CAP - 18" WIDE PRE�LI�MINARY DESIGN STUDY PHASE ONE OFFICE : UILDING Presented b-: dq t r0 i - :8DPro ose-d CorpOrate Hea Oi��ce Building „�E� IDIAN �. 10 : th STREETS a (USHM9 Mi vest ents �DLS S>.�il�nlitt�l FIN. GRADE ELEVS. VARY SEE SITE ENGR'G. DWGS. FOF FOR SPOT GRADE EL