Loading...
HomeMy WebLinkAbout039-99 DP-ADLS Office Bldg Erosion Control DetailsSTABILIZATION PRACTICE JAN_ FEB, - MAR.- _APR_ - MAY - _ JUN.- _JUL - AUG. - SEPT. _ OCT.- -NOV. - DEC. - PERMANENT A SEEDING DORMANT B --D B --� SEEDING - - - - - - - - - - - - - - - - - - - - - - - - - - C D SEEDING E ////I //// --p - - - - ------------ - - - - -- - -- F * *E /////// I //i //// SIE — 0 SODDING ----------------------------------------------- - - - - -- - - G MULCHING A = KENTUCKY BLUEGRASS 40 LBS/ACRE; CREEPING RED FESCUE 40 LBS/ACRE PLUS 2 TONS STRAW MULCH/ACRE OR ADD ANNUAL RYEGRASS 20 LBS/ACRE. B = KENTUCKY BLUEGRASS 60 LBSIACRE, CREEPING RED FESCUE 60 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS/ACRE C = SPRING OATS 3 BUSHEUACRE D = WHEAT OR RYE 2 BUSHEUACRE E = ANNUAL RYEGRASS 40 LBS/ACRE. (1 LB/1000 SQ. FT) F = SOD G = STRAW MULCH 2 TONSiACRE. I )IE I SIE / IRRIGATION NEEDED DURING JUNE, JULY, AND/OR SEPT SIE SIE IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. SEASONAL SOIL PROTECTION CHART SIZE OF STONE % OF TOTAL WEIGHT LARGER THAN GIVEN SIZE 3K 0 2K 20 K 50 OAK 90 WHERE K = d NOTE: DEPTH OF RIP -RAP BE LESS THAN 3 x d RIP -RAP GRADATION -TABLE 20" C D K 2 STAPLES PER 3* STAPLES PER SQ. YD SQ YD. 4:1 B A p. _in. o in O in O Ln O p M NO T O^ LO N Ll crJ N N N N SLOPE LENGTH 60°Ip A 01° i ,°/° %15, --' ; 5% STAPLE PATTERN TEMPORARY _CONSTRUCTION ENTRANCE w scml POST - FABRIC w BOTTOM OF DITCH DITCH CHECK BACKFILL ' FLOW EXISTING SOIL GROUND LINE 6"x6" TRENCH FILTER FABRIC EXTENDS INTO TRENCH SLOPE CHECK ROCK RIP -RAP APRON OVER GEOTEXTILE WHEN JOINING TWO OR MORE SILT FENCES TIE THE TWO END POSTS TOGETHER WITH EXISTING NYLON CORDS JOINING FENCES SILT FENCE DETAIL P; �Lr-E i OUTLET PIPE FLOW -+a NO- II 2 � L=10' (MIN) NOTE: ALL RIP -RAP APRONS SHALL HAVE A GEOTEXTILE UNDERLAYMENT OF POLYFELT TS650 OR EQUIVALENT. OUTLET PROTECTION DETAIL "DON'T DIG BLIND" 1-800-382-5544 CALL BEFORE YOU DIG N WALK OR GRASS ADDITIONAL SAND BAGS MAYBE AREA BEHIND NECESSARY AT TOP OF CURB. TO PREVENT SEDIMENT WASH - OVER TOP OFCURB CURB PAVEMENT — — 1ST COURSE - to FILL SAND BAGS STACK AND TIGHTLY FITTED AROUND PERIMETER OF INLET TO PREVENT SEDIMENT WASH INTO INLET SANDBAG DROP INLET PROTECTION NO SCALE EROSION CONTROL NOTES 1 PHASE -ONE CONSTRUCTION ACTIVITY SHALL CONSIST OF A 3 -STORY OFFICE BUILDING AND ADJACENT PARKING LOT A 8 0 ACRE OVERALL SITE. 2 THE PRELIMINARY CONSTRUCTION SCHEDULE IS AS FOLLOWSCLEARING AND ROUGH GRADING TO BEGIN IN JUNE 1999, CURBING AND FINAL GRADING ANTICIPATED TO BE COMPLETED IN THE SPRING OF 2000 3 THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING EROSION AND SEDIMENT MIGRATION FROM THE SITE 4 THE CONTRACTOR SHALL USE SEDIMENT TRAPS AS SHOWN ON THE PLANS AND WHERE NECESSARY TO PREVENT SEDIMENT RUNOFF 5 ADJACENT LAND TO THE NORTH AND SOUTH IS COMMERCIAL, TO THE WEST IS MERIDIAN STREET AND TO THE EAST IS A RESIDENTIAL SUBDIVISION 6 BROOKSTON HYDRIC SOILS HAVE BEEN FOUND ON SITE STORM WATER MAY ENTER GROUNDWATER UNDER THE PROPOSED POND 8 EXISTING VEGETATIVE COVER SHALL BE PRESERVED IN AREAS NOT DISTURBED BY CONSTRUCTION ACTIVITY 9 ALL EXCESS SOIL SHALL BE STOCKPILED AS SHOWN ON THE PLAN 10 ALL DISTURBED AREAS SHALL BE TEMPORARILY SEEDED IMMEDIATELY UPON COMPLETION OF ROUGH GRADING 11 THE SITE IS NOT LOCATED IN A 100 -YEAR FLOOD PLAIN PER FEMA FLOOD HAZARD BOUNDARIES 12 THE RECEIVING WATER IS ULTIMATELY THE VERNON ASHER LEGAL DRAIN (HAMILTON COUNTY SURVEYOR- MUNICIPAL OPERATOR) TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS 1 INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY REPAIR ANY EROSION OR PIPING HOLES 2 REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH 3 REPLACE SPILLWAY GRAVEL FACING IF CLOGGED 4. INSPECT VEGETATION AND RE -SEED IF NECESSARY 5 AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED REMOVE THE STRUCTURE AND SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1 INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE 2 RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL 3 TOP DRESS WITH CLEAN STONE AS NEEDED 4 IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED SWEEPING FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN 5 REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY 111111////'' \STER�.O.I�,� No. * 19800417 STATE OF NDI ANP S v T Y �� Ucf)� tom^ c o a� p p U Q w Q O z Q cn z O w Ir i 4A MEDvHIGH -- - ------------- FLOW o 0 co 0 W Li D LULu ~ W CHANNEL l� N0 L it AND - L }f— 3 - 1 ►I v SHORELINE - - - - Q � V 1 112' 1 1 1'2' LOW FLOW C � 0 0 z CLco� (D CHANNEL w� A B w O W 11 C B o uj c G � fi■ O _ 1* STAPLES PER C SQ. YD. 2:1 0 B O� co Lin\C Y 1% 0 D� ■ D Lli V .=Lli IL N 3:1 C B A 20" C D K 2 STAPLES PER 3* STAPLES PER SQ. YD SQ YD. 4:1 B A p. _in. o in O in O Ln O p M NO T O^ LO N Ll crJ N N N N SLOPE LENGTH 60°Ip A 01° i ,°/° %15, --' ; 5% STAPLE PATTERN TEMPORARY _CONSTRUCTION ENTRANCE w scml POST - FABRIC w BOTTOM OF DITCH DITCH CHECK BACKFILL ' FLOW EXISTING SOIL GROUND LINE 6"x6" TRENCH FILTER FABRIC EXTENDS INTO TRENCH SLOPE CHECK ROCK RIP -RAP APRON OVER GEOTEXTILE WHEN JOINING TWO OR MORE SILT FENCES TIE THE TWO END POSTS TOGETHER WITH EXISTING NYLON CORDS JOINING FENCES SILT FENCE DETAIL P; �Lr-E i OUTLET PIPE FLOW -+a NO- II 2 � L=10' (MIN) NOTE: ALL RIP -RAP APRONS SHALL HAVE A GEOTEXTILE UNDERLAYMENT OF POLYFELT TS650 OR EQUIVALENT. OUTLET PROTECTION DETAIL "DON'T DIG BLIND" 1-800-382-5544 CALL BEFORE YOU DIG N WALK OR GRASS ADDITIONAL SAND BAGS MAYBE AREA BEHIND NECESSARY AT TOP OF CURB. TO PREVENT SEDIMENT WASH - OVER TOP OFCURB CURB PAVEMENT — — 1ST COURSE - to FILL SAND BAGS STACK AND TIGHTLY FITTED AROUND PERIMETER OF INLET TO PREVENT SEDIMENT WASH INTO INLET SANDBAG DROP INLET PROTECTION NO SCALE EROSION CONTROL NOTES 1 PHASE -ONE CONSTRUCTION ACTIVITY SHALL CONSIST OF A 3 -STORY OFFICE BUILDING AND ADJACENT PARKING LOT A 8 0 ACRE OVERALL SITE. 2 THE PRELIMINARY CONSTRUCTION SCHEDULE IS AS FOLLOWSCLEARING AND ROUGH GRADING TO BEGIN IN JUNE 1999, CURBING AND FINAL GRADING ANTICIPATED TO BE COMPLETED IN THE SPRING OF 2000 3 THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING EROSION AND SEDIMENT MIGRATION FROM THE SITE 4 THE CONTRACTOR SHALL USE SEDIMENT TRAPS AS SHOWN ON THE PLANS AND WHERE NECESSARY TO PREVENT SEDIMENT RUNOFF 5 ADJACENT LAND TO THE NORTH AND SOUTH IS COMMERCIAL, TO THE WEST IS MERIDIAN STREET AND TO THE EAST IS A RESIDENTIAL SUBDIVISION 6 BROOKSTON HYDRIC SOILS HAVE BEEN FOUND ON SITE STORM WATER MAY ENTER GROUNDWATER UNDER THE PROPOSED POND 8 EXISTING VEGETATIVE COVER SHALL BE PRESERVED IN AREAS NOT DISTURBED BY CONSTRUCTION ACTIVITY 9 ALL EXCESS SOIL SHALL BE STOCKPILED AS SHOWN ON THE PLAN 10 ALL DISTURBED AREAS SHALL BE TEMPORARILY SEEDED IMMEDIATELY UPON COMPLETION OF ROUGH GRADING 11 THE SITE IS NOT LOCATED IN A 100 -YEAR FLOOD PLAIN PER FEMA FLOOD HAZARD BOUNDARIES 12 THE RECEIVING WATER IS ULTIMATELY THE VERNON ASHER LEGAL DRAIN (HAMILTON COUNTY SURVEYOR- MUNICIPAL OPERATOR) TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS 1 INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY REPAIR ANY EROSION OR PIPING HOLES 2 REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH 3 REPLACE SPILLWAY GRAVEL FACING IF CLOGGED 4. INSPECT VEGETATION AND RE -SEED IF NECESSARY 5 AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED REMOVE THE STRUCTURE AND SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1 INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE 2 RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL 3 TOP DRESS WITH CLEAN STONE AS NEEDED 4 IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED SWEEPING FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN 5 REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY 111111////'' \STER�.O.I�,� No. * 19800417 STATE OF NDI ANP S v T Y �� Ucf)� tom^ c o a� p p U Q w Q O z Q cn z O w Ir DATE: MARCH 18, SCALE: 1" = 50' PROJECT NO. 111 - SHEET NO. clol 1136EC2.1 4A z o 0 co 0 W Li LULu ~ W N0 L it x ` a- 0 u- z v Z c Q � V 3 v C? � 0 0 z CLco� (D w� LLM ix O W Z uj c G � fi■ O C 00 am O O� co Lin\C Y 1% 0 D� ■ D Lli V DATE: MARCH 18, SCALE: 1" = 50' PROJECT NO. 111 - SHEET NO. clol 1136EC2.1 : o 0 co ., a� ~ W N0 L it x ` a- 0 u- W Z c cD 3 v C? E 0 z CLco� (D w� Li c (O Tr` r; > o L0 ° c c G am O V co Lin\C 0 D� ■ D Lli P�Lij� .=Lli IL d Lij n � w DATE: MARCH 18, SCALE: 1" = 50' PROJECT NO. 111 - SHEET NO. clol 1136EC2.1