Loading...
HomeMy WebLinkAbout098-95 SP Trails at Avian Glen Sec 9 & 10 Standard Specs..11 INF -W -177 -7 - There shall be. no p - private water suPPhysical connections between a public or RECTION 02110 = SITE CLEARING RECTION 01010 - GENERAL CONDITIONS pp SECTION 02510 _ STREETS AND PARKING LOTS re.ilient. ly'.systent and a sanitary sewer or a urte- g Y Scope of Work. 1. The Indiana Department of Highways Standard Specifications - nnnCes thereto w Mparra ch would permit the a of an pollux- 1. 1. Scope of Work 15. Placing Concrete: 1988 ,(IDHSS), are the basic materials and reference speci- ed water Into the potable water supply. Sanitary sewers e sections noted below for various items are to Shall be laid at least ten <10) feet horizontally front any Clearing and grubbing shall consist of cutting, removal and fication. Tt� o'ect. The work required under this section includes all concrete A. Subgrade: Place concrete only on a moist, compacted e uirementa for this pr r proposed water line, The distance shall be satisfactory disposal of all trees, down timber, brush, - clarify the intent of the r q existing o p p - e It IS not practical projecting roots, stumps, rubbish, boulders, broken con- and bituminous paving and related items necessary to com- aubgrade or base free from loose materia P ace no Please note that other sections of these Standard Specifics Measured edge to edge. In Cases whet s ma also be a plicable. maintain a ten (10) foot separation, the appropriate trete, fencing (as designated), and other material on the piste the work indicated on Plans and described in the concrete on a muddy or frozen aubgrade. Re er to SE tion y P t0 ro act site. Specifications, including but not limited to: T_TON 02220 - EARTHWORK and requirements pertaining to reviewingi enc may allow deviation on n case-by-case basis P 7 aubgrade described within this Section. 2. These Specifications in themselves, or when combined with If supported by data from the design Engineer. Such devla- the American Institute of Architects (AIA Document A201, allow Installation Of the Sealer Closer t° water 2• All debris generated from the clearing operations stated in • All streets, parking areas in Contract limits B. Forms: All forms shall be free from warp, tight enough Item 1 shall be removed and legally disposed of off the latest revision) General Conditions of the Contract for tion mayrovldedthat the water Maln IS In 0. Se prate trench Or to revent leaks e and substantial encu h to maintain as art of the Contract. main p P project site; unless a "Bury -Pit", approved by the Owner and • Curbs and Gutters P g g Construction shall be considered p their shape and position without springing or settling on an undisturbed earth shelf located to one side of the Engineer in advance, cap be utilized in an area where it shah not. be beneath building areas and/or pavement areas • Sidewalks (walks in front of lots to be installed by when concrete is placed. Forms shall be clean and 3. By executing the Contract, Contractor represents that he has sewer, and at an elevation SO the bottom Of the water main i smooth immediately before concreting. acquainted himself with the site and has made all evalua- IS at least 18 Inches above the top Of the sewer. tures are located oortwhere ampoundmentr ofrsurf cetdrainage house contractor unless otherwise noted) tions and investigations necessary to a full understanding ma occur. • Signs, concrete slabs and exterior steps C. Placing Concrete: Concrete shall be deposited so as to of any difficulties which may be encountered in performing Sanitary sewers crossing watermains shall be laid to provide Y require as little rehandling as practicable. When the work within the time frame allotted. a minimum vertical separation distance of 18 Inches between Of the sewer. 3• Materials shall not be disposed of by burning unless ap- 2. Construction within Right-of-WaY: All street construction concrete is to be placed at an atmosp snit temperature tractor b Owner the outside Of water Main and the outside r above proved by the local Fire Marshall and Owner, and all re- within the lines of dedicated right-of-way shall be in of 35 degrees F. or less, section 702.10 of IDHSS. 4. Any soil investigation data furnished to Con y accordance with the requirements of the Indiana Department latest edition. shall be followed. quired permits are obtained by the Contractor. rTnHS51, latest revision, shall be for the convenience of Contractor, and Owner will This Shall be the Case where the Water M0.1n I5 either of Highway Standard Soecificatinr� not be responsible for any variance in actual conditions Or below the sewer. The crossing shall be arranged so that D. Cutin Concrete Except as otherwise s stifled cure with such data or interpretations or conclusions drawn the sewer Joints will be equidistant and as far as possible 4, Traffic: Conduct site clearing operations to ensure minimum and the City of CAgMcL. g P P ' Data on subsurface conditions do not constitute interference with roads, streets, walks, and other adjacent all concrete by one of the methods described in section therefrom. from the water Main points. Where a water main crosses 501.17 of IDHSS, latest edition. tation or warranty of the continuity of such under a sewer, adequate structural support shall be provided occupied or used facilities. Do not close or obstruct - a represen r to revent damage to the water Main, When It streets, walks, or other °=iaPeedovernmentalcagencys without 3. Gnaaccordancefwitha SECTION 02220 ra EARTHWORK attocbrmnglsub 16. Concrete Curb and Gutter: shall conform to requirements set conditions. for the sewe p g ermission from the approp IS Impossible to obtain proper horizontal and vertical P grades, after final compaction, to the required grades and forth in Section 605 of IDHSS, latest edition. 5. Contractor shall schedule a pre -construction conference with se station as stipulated above, the sewer shall be designed Engineer prior to start of construction to review the Plans and CtnStruCted equal to water pipe, and shall be pressure 5• Protection of Existing Improvement: Provide protections cross-sections for site improvement. necessary to prevent damage to existing improvements indi- A. Expansion Joints: Shall be 1/2 in thick premoulded at and scope of project. Contractor shall obtain latest set of sated to remain in place. 4. Preoazation of Subgrade: Contractor shall perform all top ends of all returns and at a maximum spacing of 100 Plans prior to start of construction. Minor changes may be tested to assure water tightness prior to backfilling. soil stripping operations for street areas pursuant to SEC- feet. made if all reviewing agency approvals are not granted an es in cost shall be negotiated prior 18. Trench shat[ be opened sufflclently ahead of pipe laying to a. Protect improvements on adjoining properties and on TION 02210 - STRIPPING and shall perform proof rolling an B. Contraction Joints• Unless otherwise rovided, cont - before bidding. Ch g Owner's ro art earthwork construction operations pursuant to SECTION 02220 P to physical construction based on unit prices submitted on and shall be propeprotected and reveal obstructions, rly /or p p y. taction oints shall be sawed oints s aced 20 feet on barricaded when left unattended. Lay all pipe In open - EARTHWORK and to the requirements stated in section 207 of 7 7 P the Contract documents. center. ANA UNDERGROUND PLANT trenches, except when, the local authority gives written b. Reonsreas sac ee t abler toemartiesohaving jurisdictioondi- IDHSS, per latest revision. p P C. Finish: Tam and screed concrete as soon as laced, 6. The Contractor shall contact INDI - 544 ani all other permission for tunneling. The width of the trench Shall be r 5. Compaction of Subgrade: All roadway areas (including the P P PROTECTION SERVICE INC. , 1-800 382 5 times the outside diameter plus 12 inches. Sheet and and fill an hone combed voids. Finish s uare corners ns conduits service 1-1/4 + workmen and adjacent 6• Protection of Existin Trees and Vegetation: Protect exist- areas beneath the curbs), regardless of whether they are Y Y q utility companies to locate all mai brace trench n5 necessar to ro act to 1/4 inch radius and other corners to radii shown. struction affected area. Existing Y P Ing trees and other vegetation indicated to remain in p'_ace, located in Cut or Fill, shall have the first six (6) inches lines, act. in the concomplyagainst unnecessary cutting, breaking or skinning of roots, below the final aubgrade elevation compacted to at least are shown here in accordance with avail- structures. All trenching to rds!thKet^hes D. Cutin Concrete curbs shall be cured with white utility structures of desi n. The location and Safety and Health AdMlnlstratlon Standards, P er n0 skinning and bruising of bark, smothering of trees by stock- 1008 of the maximum dry density as r�etermined by the provi- 9• able information at the time g piling construction materials within drip line, excess foot sions of AASfiTO T-99. Water shall be prevented from stand- membrane compound according to section 501.17(e) of protection of utility structures and facilities, their free front Water while Construction IS In progress, Und IDHSS, latest edition. su ort and maintenance during construction (in cooperation circumstances lay pipe Or appurtenances In standing water. or vehicular traffic, oz parking of vehicles within drip Ing on the compacted aubgrade. PP P Y Conduct the discharge from trench dewatering to drains Or line. Provide temporary fencing or approved guarding meth - with applicable utility), is the express res onsibilit of 17. Concrete Walks and Exterior Ste s shall conform to section the Contractor in the performance of the Contract and in the natural drainage Channels. ods to protect trees and vegetation to be left standing. 6. Acceptance of Subgrade: The Earthwork Contractor shall coordinate the preparation of subgrade with the appropriate 604 of IDHSS, latest revision. preparation of the bid. The Contractor shall notify the governmental agency (Street Inspector), the Owner, and the Engineer of any changes, errors or omissions found on these l9 Fort el ht C48) hour notice shall be given to the City Of SECTION 02210 = STRIPPING Paving Contractor. Subgrade shall be inspected and tested by A. Slopes: Provide 1/4 inch per foot minimum cross slope. Plans or in the field before work is started or resumed. Carmel, Department Of Public Works prior to the Start the Street Inspector prior to pavement construction. Tne Make adjustments in slopes at walk intersections as Extra care should be taken where a long time period occurs Of sewer cOnStruCtlon. Also, 48 hour notice Shall be given 1. The Contractor rhall remove all topsoil in the areas to be condition of the subgrade as finally and acceptably prepared necessary to provide proper drainage. occupied by roads, parking areas, walks, buildings and shall prevail at the time any paving material is placed between design and construction. prior to any testing done On the sewer, designated future building fill areas. Topsoil shall be removed to a de th of six (6) inches or deeper, if paces- thereon. B. Dimensions: Walks and steps shall be one course 7. Alt It shall be the Contractor's responsibility for notification 20 Alt connections to existing manholes shall be Core drilled. sat to removepor snit ve etative matter where re uired. struction and of widths and details shown on the plana. and coordination of all construction with respective utility Y, g g manholes, in laterals, shalt be See Soils Report for approximate topsoil thickness. If site Prepared subgrade damaged for any reason prior to accept - companies. 21. All pipe opening in M 9 C. Finish: Screed concrete and trowel with a steel trowel t Manhole SeCtIOnS Shall has been recently stripped, the topsoil shall be removSoils recaibedtby ttceeEarthwork Contractor atC�o tadditionallcost to a hard dense surface after surface water has disap fitted with rubber rings or gaskets. de th re uired to remove all roots as required by P 8. The Contractor shall coordinate and confirm with Owner that have `O' rings, which Shall meet ASTM C-433, Manhole water- P q to Owner. Approved subgrade shall be paved with the initis geared. Apply medium broom finish apd scribe control all permits and approvals are obtained from the respective g Engineer, Street Inspector, Engineer and Owner. y p joints at 5 foot spacing. Provide 1/2 inch expansion stops shall be Installed at all Connections t0 manholes, H.A.C. base course one da after acts tar.ce by the State private, City, County and State agencies prior to starting -t e manhole Connections are not used, joints where sidewalks intersect, and at a maximum construction. The Contractor shall be responsible to comply where flexible yp 2. Topsoil shall be kept separated from suitable fill materials Inspector. Approved subgrade damaged for any reason after spacing of 48 feet between expansions joints. with the conditions set forth within each permit. and shall not be used as fill under pavement and building shaaccll repaired by the Pap ng Cont act r Patlno additional 22, The Contractor Will be required to provide 'as-buitt' record areas. D. Wheel chair ramps shall be provided as detailed. 9. It shall be the responsibility of the Contractor to maintain drawings to the accepting agency to certify the elevation cost to Owner. q uality control throughout the project; failure to do so may and Slope of sanitary sewers. Sewers Installed at a grade 3. Topsoil shall be stored at a location where it does not p 18. Street and Other Signs: Street name and other signs shall t in removal and re lacement of the defective work. It less than require by Ten State Standards will not be ac- interfere with construction operations. grade, Should h e shall gnotify a he Earthworks Contractor land sthe be furnished at the Developer's expense and installed prior resul p q is recommended that the Contractor have a qualified supervi- ted and wilt ll be the Contractor's responsibility to In- g to the release of the performance bond. The signs shall be P Ovide for periodic 4. Topsoil shall be reasonably free from subsoil debris, Owner of the deficiencies. Should the Pavia Contras or sot on the job site at all times during construction. Stall property. Contractor Shall be pr P installed on one post at each street intersection at an p p y stones, est. fail to notify the Earthwork Contractor and the Owner o any as -bulli Checks on the sewer elevation during construction deficiencies and/or proceed in the placing of the H.A.C. appropriate spa[ in the northeast corner wherever possible. 10. It is essential that the work to be done in conjunction with to assure that the gra g desi n de is being maintained. this project be installed according to these specifications. 5. Topsoil shall be spread over all areas to receive seeding base course, said actions shall constitute acceptance o The Engineer will be requi-red to certify to certain portions and landscaping. Landscaped islands and planting areas subgrade. of this project upon completion. Therefore, it is necessary 23. The minimum thickness for Concrete encasement shall be 6 shall have a minimum of twelve (12) inches of topsoil and - a ro nista overn- Inches. seeded or sodded areas shall have a minimum of s x (6) The Owner shall have the authority to adjust the construe- SECTION 02620 - UTILITIES Gas Electric, Telephone and T.V.) - to obtain approval and acceptance by the pp p g tion schedules of the Earthwork Contractor and the Paving mental agencies that construction was done in compliance inches of topsoil spread. Contractor as is required to meet the above requiremen s• 1• Utilities: It shall be the responsibility of each Contras with these plans and specifications. Any damaged or defec- 24. The flow Channels through manholes Shall be U-shaped with for to verify all existing utilities and conditions pertain- ctor's res onsibilit to correct the benchwalts extending to the Crown Of the Incoming and 6. Excess topsoil to be stockpiled in the areas designated on tive work will be the Contra p y Ing to his p}iase of work. It shall also be the Contractor's •e in lana to beoutgoingI es. the Grading Plen, or removed from the site if directed by 7• U:ilitY Structures: Earthwork Contractor shall check or or replace. All changes or discrepanci s p pipes. the Owner or Engineer. correct elevation of all manhole covers, valve boxes and responsibility to contact the owners of the various utili- reviewed with Engineer prior to implementing changest field. similar structures located within areas to be paved, and ties before work is started. The Contractor shall notify in -k ki ur es. all benchmarks monuments and other 25, All Sanitary sewer pipe Crossing bodies of water Must be stake, or have made, any necessary adjustments in strut writing the owners or the Engineer of any changes, errors or I1. Maintain carefully ductile Iron pipe Wlth mechanical points, In addition, Paving Contractor shall verify the above prior to placing omissions found on these plans or in the field before work reference points; if disturbed or destroyed, Contractor where there IS less that four (4) feet from the crown Of the SECTION 02220 _ EARTHWORK Pavement materials. Adjustments to uty structures is started or resumed. shall contact Engineer. Boundary lines of property have required after placement of paving materials shall be the I e to the stream bed, the pipe must be encased In concrete been established on the plans and Contractor shall exercise P P Sco a of Work r:sponsibility of Paving Contractor. 2. If active utilities are encountered by not shown on the care that building lines are established in accurate con- t0 limits shown On the Plans and Detalls, formit with dimensions indicated. For construction and drawings, the Engineer and utility representative shall e Y be Permitted t° flow Into the sanitary Sewer Extent: The work required under this section consists of all 8, gtuminous Pavement: All materials and construction methods advised before work is continued. radia ur ossa, a bench mark has been established; the 26. No water shall p y excavating, filling, rough grading, backfilling and related items lroposed for the construction of bituminous pavements shall g g P P T e 'slop. avatin s indicated on the Drawin s. All vertical dimen- system. Contractor shall utilize a pump t° keep the water necessary to complete the work indicated on the drawings and comply with section 403 of IDHSS, per latest revs 3, Inactive and abandoned utilities encountered in ext g elevation i g Y sions and final grades shall be established from the bench level below the pipe. Pump discharge shall be directed t° a described in the Specifications. front face of curbs shall be lack coated where H.A.0 pave- and radia o erations shall be reported to the Engineer an mark. Storm outlet, nent will be in contact. Unless specific approval is grant- utilit com an The shall be removed, plugged or capped 1. In general, the items of work to be performed under this ed, paving will not be permitted during unfavorable weather Y P y' Y 12. Contractor shall be required to maintain records of all as- section shall include: fill compaction and rough b finish nr when ttie temperature is 40 degrees F. and falling. as directed by the utility company and Engineer. built drawings and construction activity during the con- 6, The type Of new Manhole ring and cover shall be as specified grading of entire site as indicated on the Plans including 4. Rules and regulations governing the respective utilities struction process. All as -built drawings shall be submitted pn the standard detall sheet of these Plans. subgrade preparation and grading for streets, building pada, 9, ?ask and Prime Coats: If the previously constructed course shall be observed in executing all work under this section. to the Engineer promptly upon completion. Bismatic Coating Shall be applied around each manhole Joint drainage swales, walks and general cut b fill. .s granular and a prime coat is required, priming shall from 6 Inches above t0 6 inches below each point, :onform with applicable provisions of section 408 of IUIISS, 5. Granular backfill shall be required for all croasinga under 7, The casting elevations are Set by Plan. However, the Cnst- 2• Proof Rolling: shall be performed on all street areas, per latest revision. pavement areas except for utilities which are bored or parking areas, floor slabs and future building areas subse- pushed under street. RECTION 01020 = QUALITY OF WORK Ings are to be adjusted In the field by the Engineer's qua m to topsoil stripping and prior to placement of fill The tack coat on H.A.0 base or binder shall conform with representative should a discrepancy occur between pion grade materials. Soils Engineer shall direct method of proof requirements set out in section 409 of IDHSS, per latest g p and existing grade. Castings should be set three (3) Inches 6. Conduit shall be required for all crossin s un er avemen 1. Perform all work in file most workmanlike manner and accord- rolling. Contractor shall coordinate proof rolling opera- revision. areas. Contractor shall coordinate with each respective Ing to the best standard practices. All work shall be free g g tions with Soils Engineer. from faults and defects in workmanship and materials. above grade In unpaved areas and earth shall be raded f Or utility for their location and installation. Conduit s a positive drainage away from Manhole Casting. 10. Compacted Aggregate Base Course: shall conform with material be 4" PVC Schedule 40 or approved equal. g Any areae containing soft, yielding or otherwise unsuitable Contractor shall be solely responsible for quality control ar sewers will be allowed to Com- materials shall be undercut or stabilized by approved meth- and construction method re uirementa set out in section 303 2, y q 7. Existing storm sewers, sanitary sewers, water mains, gas of the work and shall maintain quality control over suppli- 8, No Construction of spall 1,-_ �+ 127 I.A.C. ods directed b the S ils Engineer. roducts services, subcontractors, site P"'�""• of IDHSS, per latest revision. The thickness shown on the mains, electric ducts, telephone ducts, steam mains and era, manufacturers, p mence until a valid cons per Y P plans is the minimum thickness of Lhe fully compacted aggre- conditions and workmanship to produce work of specified Article .3 from t} -ie I�-ldiana Tepa.r+moat OF Environmental Re lace unsuitable soil materials on site in the area desi ate base course. Com action shall be attain lished by other underground structures have been shown on the plans g- P P according to the best available information. The exact quality. Management Is Obtained, nand by Engineer and seed as noted. Bury pits which are rolling with a smooth wheeled roller weighing 8 to 10 tons. location and protection of these facilities and structures, approved by the Owner and Engineer in advance and which are Com act to 100 $ of maximum dry density in accordance with their support and maintenance in operation during construc- 3. Required testing and inspection are intended to assist in located in nonstructural fill areas that are not restricted IDHSS section 304.05, latest revision. Along curbs, head- tion (in cooperation with the proper authorities of the determination of probable compliance of the work with the by other easements may be utilized to waste unsuitable soil ens and walls and at all places not accessible to the utility involved), is the express responsibility of the Contract Documents but do not relieve Contractor or Subcon- Ill 0.rOUn01 all structures and all Cuts under paved and unused topsoil. Suitable fill material obtained from roller, the aggregate material shall be tamped with mechani- Contractor in the performance of his Contract and in the tractor of responsibility for those compliances. Specified 9. Backf Five the excavation of approved bury pits can be utilized for cal tampers or with approved hand tampers. testing and inspection are not intended to .limit Contrac- areas with granular materia(. Trenches opening within site fills. preparation of his bid. tor' a quality control program. (5) feet Of paved roadwn s shall be backfilled with COMpact- y g Y 11. Pavements built b ata a construction, that is pavements ed granular material in accordance with Section 211 Of Contractor will be compensated for excavation, replacement used to carry traffic before the full pavement structure is IDHSS. and disposal of unsuitable soil materials for soil other in place, will have each stage used by traffic inspected by than noted on Plans based on the Contract unit price for the Street Inspector for distressed areas before the next RECTION 01040 - SAFETY 10, The Contractor shall coordinate and confirm with Owner that Common Excavation applied to the volume of the undercut stage is started. Distressed areas will be repaired to t e all permits and approvals have been obtained front the re- excavation area removed by direction of En laser. 1. Contractor shall Lake all. necessary precautions for the P g satisfaction of the Street Inspector before an additions safety of persons and the protection of the work and adjoin- spective private, City, County and State agencies prior to 3. Fill Material shall consist of earth obtained from cut stage is constructed. Ing property. Contractor shall comply with all applicable starting cOnstruCtlon, areas, borrow pits or other off-site sources. Earth shall 12• Concrete Plain concrete pavements shall be constructed in provisions of federal, state and local safety laws and be free from lar a rocks ve stable matter and other delete- nous substances. Fill obtained from off-site sour.:es shall accordance with section 501 of IDHSS, latest revision. building codes. 11. The Contractor Shall be required to furnish the Engineer g g Concrete shall be ready -mixed concrete and shall be a mix of with a set of prints, marked In red pencil, showing actual be approved by the Owner. The fill material shall be laced ro ortioned fine and coarse aggregates with Portland cement 2. Contractor shall erect and properly maintain at all times, Sewer location and Invert, to include lateral location, in layers not to exceed six (6) inches following compaction. andp water. Minimum cement content shall be 6 bags per as required by conditions and the progress of the work, all depth and length. Such 'as -bulli' record prints must be Contractor shall be responsible for aerating wet material cubic yard of concrete and maximum water content shall be necessary safeguards for the protection of the employees of received by the Engineer before the final Contract payment and adding water to excessively dry material so that the 5.5 U.S. allons er sack of cement, including moisture in Contractor, his subcontractors, Owner and its lessee, Own- Can be authorized. The sanitary sewer laterals and Stubs final moisture content of fill material will be within the the a re gate. Slum for normal weight concrete shall be a en's other contractors, members of the public and for the k and ad'oinin ro arty. termination shall be indicated on the surface with a green range from Optimum Moisture Content cf -2.0 to +1.0 percent maximgm of 4 inches and a minimum of 2 inches. The slump of protection of the war 7 9 P P Painted Metal fence post set Immediately above said terMlna- as determined by the standard Proctor maximum dry dens:Ly machine placed concrete shall be no less than 1-1/4 Inc es test method AASHTO T-99 All fill beneath awed areas nor more than 3 inches. Standard test ASTM C-143 shall be 3. All workmanship shall comply with the Occupational Safety tion point, floor slabs and future buildings shall be compacted to at used to measure slump. Compressive strength of concrete at and Health Administration Standards, (OSHA) 12. All sanitary sewer lines Upon completion will be required to (AASHTO T,99)f, tSeesSoildRepo trb�tor maximum dry density ai aentrainment4of058S1toA8$ byevolumeop rtASTMaCl 260e pass a low pressure air test , unless dated Otherwise directed by the Engineer. Said test shall be for soil conditions and Retempering of delivered concrete will not be allowed. SECTION 02730 - SANITARY SEWERS - Carmel Jurisdiction conducted according to NCPI Standard Method and shall be fill recommendations. ,� Concrete shall be composed of: witnessed by an Engineer. Infiltration under test shall not 4. Perform earthwork radia and finishin o erations to estab- A. Portland Cement: Conforming to ASTM C-150, Type IA or 1. SCOP@ of Work liah re uired elevations and dimensions as designar_ed on the YP exceed 200 gallons per inch of Inside diameter of sewer pipe q P Type 'IIA. The work under this section Includes all sanitary sewers, per Mlle of sewer In 24 hours and Inclusive of all aFP plans. nances within the section been tested such as manholes, B. Aggregates: conforming to ASTM C-33. testing, permits, governmental 5. Place topsoil to minimum depths indicated on the planting Manholes, casting, clennouts, house connections, eCt. C. Water: Shall be clear and free from injurious amounts fees, surveying layout, and plans in each respective area. Place topsoil in layers not Inspections and approvals, y g y of oils, acids, alkalies, organic materials or other related items, Including excavation, backfill, granular 13. Deflectlon tests shall be performed on all flexible# pipe to exceed six (6) inches following light compaction and fill, and dewatering necessary to complete the work shown on develo smooth planting surfaces. Subgrade shall be scan- deleterious substances. after the final b0.ckftll has been to place at least 30 days. fled to 3" to 6" in depth before topsoil is spread. Remove the Plans. No pipe Shall exceed 0. vertical deflection of 5%. (*The all vegetation, sAones, roots and rubbish from topsoil and 13. Welded Steel Wire Fabric: Where required for concrete the following are considered nonflexible pipes, concrete pipe, rake to even surface. Carefully spread topsoil to meet reinforcement shall conform to ASTM A185. 2, This Is an outline specification. In case of conflict, ductile iron pipe, Cast Iron pipe, asbestos cement pipe.) walks, curbs, paving, adjacent properties and be free of low standard specifications of the City of Carmel spots. Contractor shall be responsible for insuring that 14. Premoulded Joint Filler: Shall be of non -extruding type meeting ASTM D-544, except that premoulded joint filler used �hnll govern for all Installation and materials, 14. All testing and InSpeCtlonS wilt be the responsibility Of surface water drainage swales shown on the plans are uni- in concrete walk construction ma be either non -extruding or the Contractor and shall be observed by n Prof essionnl formly finished gtaded to the designated minimum slopes and y 3. Sanitary sewer pipe shall be 'Armco Truss -Pipe' conformin elevations. p g Engineer for certification. to ASTM D-2680 or PVC In accordance with ASTM D-3034 (SDR 15. The ends of laterals are to be plugged tight with plastic 6. settling ant Pondins: Where settling and ponding is 35) and and ASTM 2321, Minimum Cel( Classification for PVC and t urable or ot,servable at excavated areas during the general PVC truss pipe shall be 12454-B or 12454-C. disc or cap capable of wtthstnnding n low pressure air est Project warranty period, remove surface (pavement , lawn or without leakage. other finish), add backfill material, compact, acid replace 4. For all sanitary sewer ,joints, the Contractor shall use surface trehtment. Restore appearance, quality, and condi- type type points. No glue ,Joints shat( be allowedl In- 16. Class C bedding as described In ASTM C-12-74 (ANSIA 106.2) tion of satiate or finish to match adjacent work, and elimi- stalled and Manufactured In accordance with ASTM C-425. or ASC MOP No. 37 shall be used, except where speclFled nate evidence of restoration. otherwise. All precast manholes shall be bedded on a granu- lar foundation <6 inches minimum), 7. Removal from Owner's Property: Remove waste materials, 5. All sanitary manholes shall be 'precast concrete' manholes including surplus excavated material, unacceptable excavated In accordance with ASTM C-478 and Section 720 of IDHSS. 17, Water and sewer lines crossings and separations shall be In mttoffalzOterash and debris, topsoil, and legally dispose of ct site unless otherwise directed. The location of dump and length of haul shall be the Contractor's respon- The bedding beneath sewer manholes shall be n minimum of accordance with Ten State Standards and local, codes. P 6 Inches of #8 stone beneath the manhole base, eibility. RECTION 02720 _ STORM SEWERS 1. Scope of Work The work under this section includes all storm sewers, storm sewer inlets, and related items including excavating and backfilling, necessary to complete the work shown on the Plans. 2. Standard Specifications of Town/City/County of �/1Rr1�t- and Indiana Department of Highways Stan- dard Specifications (IDHSS), latest edition, shall apply for all work and materials. Pipe shall be installed in accord- ance with Section 715 of IDHSS. All trench excavations deeper than five (5) feet are covered by OSHA Standard 29CIR 1926 Subpart P. 3. A. All storm sewer pipe shall be reinforced concrete pipe conforming to ASTM Designation C-76 Class III, unless otherwise noted, in accordance with Section 906 of IDHSS. Joints shall conform to ASTM C-433, latest revision, B. Alternate pipe material may be (aluminum coated) steel, Type II material conforming to the current AASHTO M36 for pipe 18 inches and smaller with a helical corruga- tion1/2" and AASHTO M196 for pipe 21 inches and larger with a helical HyFlo corrugation of 3/4" x 3/4" x 7-1/2". All CMP pipe shall meet the following minimum gages unless specified otherwise: 12 inch through 36 inch shall be 16 gage 42 inch through 48 inch shall be 14 gage 54 inch through 84 inch shall be 12 gage All sewers shall be installed so as not to exceed the maximum allowable pipe strength per ASTM and manufac- turer's requirements. If additional pipe strength is required for the probable earth live load condition, the Contractor shall use a higher strength or bedding method to satisfy the conditions. C. Where shown on plan, use high density Polyethylene (HDPE) Corrugated pipe with smooth interior (N 0.012). Pipe and fittings which meet or exceed the requirements of Type III, Category 4 or 5, Grade P33 or P34, Class C bedding per ASTM D1248. Joints shall be split corrugated couplings at least 7 corrugations wide and exceeding the soil tightness requirements of AASHTO standard specifications for Highway Bridges, Section 23 (2.23.3). Backfill and installation shall comply with manufacturer's recommendations. 4. Subdrainage system shall be installed as shown on Plans and be of pipes designated in Section 906 of IDHSS as follows: Pipes to be installed for subsurface drainage only may be one of the following: A. Perforated corrugated drainage pipe in accordance with AASHTO M252 or AASHTO M294. PVC shall have minimum cell classification conforming to requirement of 12454-C ASTM D-1784. B. Concrete drain the in accordance with AASHTO M178. C. Vitrified clay the in accordance with AASHTO M179. Where pipe is to be used for a collector of other subsurface laterals and/or sump pumps and installed with provisions for cleaning, it may be one of t}te following: A. ABS or PVC composite in accordance with ASTM D-2680. B. PVC in accordance with ASTM D-3034 SDR -35. C. Pvc corrugated with smooth interior in accordance with ASTM F949. 5. Backfill around all structures and cuts under paved areas and within five (5) feet of pavement edges with granular material in accordance with Section 211 of IDHSS. b. See standard detail sheet for construction dimensions of storm structures. Manholes, inlets and catch basins shall be in accordance with Section 720 of IDIISS. Precast con- crete and steel for manholes and inlets shall be in accord- ance with ASTM C-478, latest revision. Steps shall be ductile iron or aluminum integrally cast into each catch basin sidewalls. 7. The Contractor shall provide a minimum of one (1) foot of earth cover over all storm sewers. If pipe is to have construction traffic over it, Contractor shall provide a minimum temporary earth cover of four (4) feet, until con- struction period is complete. After completion of opera- tions requiring construction traffic over pipe, Contractor shall remove the temporary earth cover and grade the earth to elevations shown on the Plans. Rip -rap particles shall be a minimum of 6" and a maximum of 17" in size and shall be placed a minimum of 18" in depth. Dimensions for rip -rap on this plan are for estimating purposes only. Actual best placement of rip -rap shall be determined by field conditions and shall be in accordance with Section 616 of IDHSS. 9. All drainage pipe and ditch outfalls to receiving streams shall be constructed in accordance with drawings, subject however, to any modification required by Engineer at the time of installation is completed and to any adjustments needed for field conditions not adequately anticipated by the design drawings. 10. Castings shall be as shown on detail sheet for manufacturer, type and number. All castings shall be Neenah or East Jordan approved equal. Castings shall be gray iron meeting ASTM A-48, latest revision. 11. Install gaskets in accordance with manufacturer's recommen- dations for use of lubricants, cements and other special installation requirements. 12. Place plugs in ends of incomplete piping at end of work day or whenever work stops, and at stubs for. future development. 13. Carry depth of trenches for piping to establish indicated flow lines and invert elevations. Notch under pipe bells where applicable to provide solid bearing for entire body of pipe. 14. Trenching: Lay all pipe in open trenches, except when the local authority gives wriften permission for tunneling. Open the trench sufficiently ahead of pipe -laying to reveal any obstructions. The width of the trench shall be the outside pipe diameter plus nine (9) inches each side for 12 inches above the pipe or 0.3 x O.D., whichever is greater. Sheet and brace trench as necessary to protect workmen and adjacent structures. All trenching is to comply with Occu- pational Safety and Health Administration standards. Con- tractor shall employ a Registered Professional Engineer to design trench safety systems for all trenches over twenty (20) feet in depth. Keep trenches free from water while construction is in progress. Under no circumstances lay pipe or appurtenances in standing water. Conduct the charge from trench dewatering to drains or natural drainage channels. 15. All pipes on steep slopes (over 208) shall have concrete anchors at maximum 40 feet intervals as shown on detail. 16. Backfilling: For a depth �f at least 12 inches above the top of the pipe, backfill with earth or granular material free from large stones, roc)r fragments, roots or sod. Tamp this backfill thoroughly, taking care not to disturb the pipe. For the remaining trench depth, backfill with earth or granular material which May contain stones or rocks not larger than four (4) inches. Backfill under walks, parking areas, driveways and streets shall be granular material only and shall be thoroughly compacted by approved methods to the density specified. Trenches parallel to and within five (5) feet of paved roadways shall be constructed the same. All granular backfill shall be compacted to 958 Standard Proctor maximum dry density. . > a C_ IA I; F a LA (_ UI J I 11J ry Zi D a Ly U V) w n J N U-) rn C: En �" U d CO N (11 Q Z .Adow- lY C) Z U I�� F_ of ',-I C") Q � Q = Z U 4 u7)N y 0 `