Loading...
HomeMy WebLinkAbout17080193.18'ProThect'). rad scheduled far construction b known an i 'Hans PIace Gc (h(hereinafterr.F-w to as the je pptt.rrT-�^r'noN The Property is located an the southeast comr of 108th Street and McPharer Street In Cartrol, Mdian , at c latitude of 3958'28' N -d o longitude o1 8898'28' W. Name: HAND Ins. Adder.. 347 S Both Street, NoblesMle, IN 48080 Rpreeentatr_ J-nifr Miller, NCP Tit's, Executive Director Telephone: (317) 674-8108 IQEER N AND Inc Address, 347 S. 8th Street Noblesville. w 46080 Representative: J.How WN., AfCP Till«Executive Dkwtor Telephone: (317) 674-8108 NonrE of wroJT All Partin defined an amen a operators must submit a Notke of Intent (Nil) at leant 48 noun prior to mnm-cam-t of on -dna dmstatwn «tlMti.a Submittal of lata Nd's l. net prchAuit•S horero, authorization un dr the canstctnlan q -sol prmR 1. only far dl.chagw thet occur aRr prmR aovr°gs .panted. Urprmitted discharges oY be subjmt to foraenent «tions Dy th. EPA. Fa the purposes of this Permit, an operates 1. deTed es -y Party meeting either of the following requkemrhte a) The Party has Operational control over construction Plans and spwf8catlms. Including the ability to make modifications to those plans and specifications. D) Th. party has day-to-day r opatima: d control of those tivi es at a project that cue mecwsry to -sure compliance with a Kamwater pollution promentlon plan for the site a other prmH oonatt;o A2 11_ 17' PI AT Refr to the Sits Plan. This PmJa t consists of six (6) residential buildings and associated parking lot and utility Mfrvtructurs, The alta also contains Proposed Km arotr detention facilities and Knn seve storm infra rt uctum, M NOMTY MAP Refr to Title Sheet At I F ern OE9O6PilON OF 7HF rCT a7E Refer to sheet C100, Existing Topography for the L.gal Description. The sit+ will not be subdlvlded; therefore them an no IndthAdud lob an the property. TM proposed site Improwm-b Oro shown an the Included plans A7 HYDROLOGIC Ul CODE (Mir) 05120201090050 Rule 5 IDEM Permit ;. required. A9 SPECIFIC POINT WHERE cornu me♦ F♦14' n'- STORMWATER DRAINAGE FROM THE SITE WILL BE CONVEYED BY A PROPOSED STORM SEWER AND VEGETATED SWALES TO TWO PROPOSED RAIN GARDEN FACILITIES LOCATED ON THE EAST SIDE AND SOUTHWEST CORNER OF THE PROPERTY. THE NORTHERN RAIN GARDEN WILL DISCHARGE TO THE SOUTH RAIN GARDEN, THE SOUTH RAIN GARDEN WILL THEN DISCHARGE TO THE EXISTING DRAINAGE INFRASTRUCTURE AT A RESTRICTED RATE THAT WAS PRONDED BY THE HAMILTON COUNTY SURVEYOR'S OFFICE NO WETLANDS LAKES OR WATERCOURSES HAVE BEEN IDENTIFIED ON THE SITE THAT MAY BE NPACTED BY STORMWATER DISCHARGES AS A RESULT OF THE PROPOSED CONSTRUCTION ACTIMTES Ajj IDENTIFICATION OF All I7ECEDIN. WATERS White River Is the ultimate receiving rater fa the project wind. Thee are no locations -site Mere surface water may be discharged Intopeau a. red rat A13 IOD -YEAR (YYyp nue n rW1WAK Avk n rw.,e... ea The lot is located In an unshaded Zone 'X' (orae detamrined to be outside the 0.2 percent -mud ch -an floodplain) an indicated On the Hamilton County, indkmc, Flood Insurance Rate Map JW57CC209G dated November 19, 2014. Pre-c-abuctlon 10-yeo dfachorgr 271 Of. Post-con•tctlon 10 -pr discharge: 0.23 Of, POO-constructlan 100 -year discharge. 0.327 chs AIS ADJACENT_IAM, 1M Nath: R-1 East: R-3 South: R-3 smash R-3 Approximate boundaries of disturbed areas we as identified an the Erosion Control plan. A17 IOdiTrrTlal OF E]f67NG GET1n (113,FR Apprakinate areas of existing vegetative cover re an shown an the existing topography Nest. The Natural Reeourow Conservation Service (NRCS) Web Sol Survey of Hampton County, Indiana, Indicates Braolatan .Ity day loam. Crosby sit loam, and Mkanl Mt loan am located on the sits The --sit• soil all be treated an recamm-ded by the gsoLUnkd engineer If the cmkRtbns n aunaki for the proposed construction. R -mem" beginarts may include. but we mat limned to, removd of un.R.O. sol and ba*gnng with engineered matrld. h rtclldlon of o geof°bric within Or under the pawm-t Wam, a treatment of the wbgrade wfth Inn. Locati-sof atannwctr systems, Rete Sewer Plane to the Utalty Plan or Storm an and Profiles Size of storm serer Refer to the Utility Plan or Storm Sew Ron and Prones petals of storm Inlets -d 1-I Refer to Site Dstape Ago PIANS Fat ANY OFF_c -,vu r`nM1tnES cSrY1ATE➢ ern n:� - r`* Offsite amst-ti- -sl corselet of tying the outfall pipe to the existing 8 -Inch Kwon cert pipe b.led within 105thStrout Right -Cf -Way directly wouth of the der -PI property It rill dane, eo Pof ,mtell Pma doghcuee manhole to tie Into the existing sanitary serer line located rJ the 105th Street ROWIg Excess ecus shall be Immediately stockpiled surrounded with not fence and . d/ constaccordance ation site in with dl applicable leen If top. Rtockplw we ceded d and/ , removed from the it this Droll they Pro shown on the Eranlan Contra Plan. A22 EXISTING SITE APHY Refer to the Existing Topography Plan a 0 0 Refr to the Grading Pilon A24_ CONTACT NFO OF INdNd A N a DF SPP IL FIFNTAnlX Name: HAND Inc Address: 347 S 8th Street, NOWeavlo, IN 46080 R-prementativc Jmnifer Miller, AICP Title: Executive Director Telephone (317) 874-8108 B1 DEXWJjON OF POTENnAI Pd I ITUIT ran g -p AScn'Y _ The following potential pollutant Rource, may be associated with construction octhAtlse On site: 1. Material storage orad. (man peclfladlly described below) 2. Cmetructlm waste matrid 3. Fuel -= areae and fueling Katims 4. Exposed sols 5. Looking .hides and equlmI 5. Sanitary waste frau temporary toilet faditise 7. Litter 8. WiSopdblown du 8. Strading off sits from construction equlpm-t The following construction materials may be staged s eared on site at the k. wricue points during devsiopm-t of 1. Structural fill 2. Pavement Bann Stone 3. HDPE, PVC, RCP Or Ductile Iron pip. 4. Precast doncrKe HDPE m PVC drainage and sanitary structures 5. Rock rip-rop B2 earl DESYswf4G eff>onaWATER OLuLTY L'E♦tl ^^ L til AGA1A�33 2 SMeade pre-construetion meeting with Hamilton County Surv.ym's Office. 2. Instill conatru<tian mtrmca. 3. Utilize the gravel construction entrance far Installation of the perimeter not f -ca. Add Kone if needed. Post the Nd at the entrain Add protection meceur. to existing inlet. 4. Install'ailing awe, fusing station, material storage drea and concrete tuck wool S Strip the tap sol and grads 6. Caplets the at and fills on the site. Final groom and and the prod elopes. natall check dams P. stabilize the dcps alth or n control blankets. 7. Prior to building canstct(on In IN atone surto.° tar paved aroma. 8. Building pods left dormant far mon than 15 day-, must be lemporarly seeded. 9. Start building oonstrvctlan. IrutO11 staging ren tor puildMg mateiale, 10. Instill slam esw and other Witks. Provide Inlet protection immediately upon completion of the inlet mtl Install riprp ouUat Protection prim to Installing outlet& Final grade and stabilize dopes when /nista aro Nnctl-Mg. 11. Seed the Dertmetr of the alta. 12 Carhplste utlfty Inetdletlan, warty, paving e and building amtctor. 13. install landecping plant motorial and stobIiza all dlsturbed reds 14. Remove all roelm and aediment control practices -him or- have . uniform gram cover, sIi_STAIlIE cONCTpn I(7TIpN FT+tR♦ ars l m n '^ AD m. nee CanKrua- tranc. r!I be In place prior to any site constructiona demditior. Ent rant. are shown Ir' Erosion Pilon, refer to the Ereslon Contra Detail. fordetails. 54 Shnnt Mow areae will be Protected by seed and mulch or hydroeeeding. Eroslon control blankets will be instilled doped areas .hero the slope sxcwde 6:7 (horizontal to vertical), SIH F -crag cull Da utilized to prownt swims far aran leaving the site. Refer to the Erosion Cmtrcl pan far I«ationa and the Eroel- Canted Details to details. Proposed whime will be stabilized with III control Dlmketa, roil rack donuts rill be Installed to dor runoff to Inlsta Stror Doles and not faint. WHO not De allowed . cant -+rated the EMow protection mmsures. Rein to Erosion Control Plan ter locations and the Eranf- Control Details for deals, � STnu• SEil1FR IM FT pROTECMN 1F♦tl [r The controctr Nall Install appropriate inlet protection measures at each Inlet Refer to the Erosion Control I for l000ti h. and the Erosion C-tml Details far details Straw bales will not be .bred oro inlet protection measuree, az 8WOFF CONTRIA Silt fence cull be Installed around the parimetr whereof the site where runoff may leave the site to prevent wiment f- being conveyed offelte. Bfl sTORuwAmT teen ET PRo ria. cpEaFl c Stamrater outlets will be protected by riprp prone to pant moor rim. omRafe, to the Erosion Control plan far locations and the E -son Control petals for detp0s � n>:♦rr ttABILZA7ION menu err nave ♦ n RacaUorm nand the Erosions C-tmi Details ilized +tor d tone. grade destabilization. RKr to the Erosion Control par for 1110 1 CATION Diu H9 4inONS A C01.'^'^' RNs, to the Erosion Control %m far location. of each 't -mater quality mmeum and the E -1 - Control Dstoo. Surface stabpfzgtion b r-quired on my baro or thinly vegetated area that Is scheduled r Ilk.y to remain inadlw b a permed of 15 days a 'Or Refer to the Twh`Pw:y Seeding petal ithln Email- Cmtrd Details fr paalfln - pre an-dm-ts, seed ml.tures and mulching. B12 PFI2N1uENT tlwcACF A_LIZATIOh CPF a. -man lam area to a minimum depth of 6 Inches. MI- sol an -dm -b and fertilizers with taledl at rates p.dfied. Organic Rill amendments ouch cue peat canpcat a manure Noll be applied at Y doth wetly over Roil and Moorpsoted Into the til 8' of topsoil. Provide fertlke rith percentage of nWog- replied to provias no Ida i than 1 pound of octad nitrogen pr 1,000 Tz% rL of lo- °ren roil not lase than 4 Phosphoric odd and 2 percent potowlum. At least 50 Percent of nitroq- to be organic farm. Delay mixing percent uki gtol fertilizer H planting will not follow placing of panting sou within a ren sap. B. Fertilizer far lawns, provide a fast relpse fleelize, wfth ° ompositlon of 1 Ib per 1,000 oq. R. of actual C 'trop-, 4 Percent Phosphorous, and 2 percent potosalum by eight Slow_mIRa fertilizer fa theme and decub. grade frtilzr _.jet kH 50 Percent ester-Insdhmlm nWoq-, Phopha'aum d Ddarlum odea } a 7PPWI by weight f 5 percent 0. Dade lawn and grow eves to rnpth, wean wrfoca with !Doss, Ifamly Mia texture Limit fine grading to reps that can be Planted within inmedlot. future Remove troch, dabHs, straw large Nan 1 Inch diameter, -d other objects that may Intrhre with Planting a maintenance op , , a. Soar s.mdi using a preadir or E OMIHDub awed even not seed when .fid eel«sty exceeds 5 mils per hour. y over entire ores by sowing equal quantity In 2 directions at right angles to each other. F Rdke aesd lightly Into til 1/6 fich of pre, rill lightly, and mater with a }Ins any. C. Install ranim control blankets as Indicated - the plan. H. Prated seeded reds against erosion by spreading dean, nned-free straw mulch aRr completion of seeding adem-6 e, Spread uniformly to form O conthu-. blanket not las than 1-1/2 Inches loosR mpsurem-b over seeded yeas I. Water nsw1Y Planted lawn rwos and keep moist until new Bann ie established Immedlately repair any lawn u. Rem Io tins Pemnyan-t�Seaetd; Dir"i" .iithkh dUe Erosion dCrontr�ol Dotal°greet, far timing r wedhg, graom seed speciflc°tivand d mulching pecificatlons o permanent NON° +°IM material, Including building materials. IN Permitted to ba dlechrged to surface ratan r burled an alta Al said wants materials. Including d4p°eotWe materials Ineid-td to the conetctIDn Oettvity must be PollPON- ad In cantalrem r dosed dumpsters. The collection P-tolners must be m "`c P.rkaiealy and the Wl.cted material hwlad to a landfill Permitted by the State and/- appropriate local municipality to accept th. rote for disposal. A fretum r supervisor should be designated M writing to avers_, enrce foand InetMct conmtruetlon waken an proper slid raster procedure. Dp:ara Yin t Wph-ever powlDle, minimize the use of hazardous materials and generation of hazardous data. Ah hazardous, wants materials will be disposed M the monner specified by federal, state, r local requlatlons a by the mufactunr. Use containment berms M fueling and maintenance areas and where pat -lid for pole is high. A fretum r wpeMsor Nauld be d_ignated in waiting to oversee, enfran and In;l ct construction wakes - Drops, hazrdcus este pr«edurnn. Than location of any hazardous waste storage yeas Nould be indicated In he t-a.t.r polutian prevmtlon plan by the operator folldring on-site location of the fodlty, SILL Carted/OH-cm VNid T dl During construction, motor trucks hmld be used. a M needed, by each contra past ARr construction, the site Nould be stabilized to reduce dust. r a subcontractor to reduce Construction trafRc should enter and widt the site °t ° Constction Entrance vdM a ark pod dr equlwlmt stave+. tI ..dpwpaRe of the rock pod ' to minimize the amount If moll and mud that IN traded onto ex sung frequency wHkimt taiment whninlnlzoen e ofbie imtlm site, pR-site occumulati-. or sediment must he removed at a pacts Samitrv/Seoat^c Cantractoro d subwntroctors must comply with all Kate and IoW s -/try ee.er, portable tons+ a seplb system requl°tlons. Sanitary fociotles shill be y dry provided at the site b each don tractor a wbcontroctor In the event that sediment weopw the canstruction sit, off-site adcwm QUO a of sediment rrxust be removed at a frequ-cy .indent to mhmza adverse Impacts. M example of this may be the throughout c-etction P tiviii- The sanitary facilities should be utilized by oil cavtctlon Dersannel and be serviced regdlony. All exp-nns a.aciated with R-Itay facilities situation whoa sediment has .washed into Ne street and could be caned Mto the ateerrs by the nest rainfall and/or pass a wfety hazard to lean of providing are the responsibility of the conte«ton and subs-trocton. The loeatim of any sanitary facilities should be indicated an the eta public streets. Modricotions/RaNdons to SWPPP. mmotw polutl- prevention plan by the Operator following an -site location of mid facilities, Bawd on h to thin SWPPP dtrdl De implemented .linin sewn on �� wY necessary modification, Wends day. p Wtithe A o mn, Is pe b Water Sacra Water used to establish and maintain grow. to control dual does not ntrol. on necessary sensory N a control •asurs Operational of Red ms within Polluon.tant provide adequate Ddlutant control. NI rovialons shill Da recorded an a Record of RsvMona rlthIn eRvern W -ilea days or the inspection. and for other conatructlm orighom from a public water supply Or private will purposes must approved by the Stats or local health deportment TEL Fouioment FueIn d It Is the rsaponeblllty Of the aprotor to maintain of/actin pollutant D dlsM°s,9• co^trds. Phjmic, site St- Amom Equipment fueling, maintenance, and coming should only be completed In protected areas (L... bows, area , Looking equipment and moint rance fluids will be collected and not thawed to dlscho c dRlons a controetor suDcantraetor y panned ac e/ practices could make It naans.ay to Install more controls than were original) xamps, localized concentrations of surfoan nmoff r unuuldly steep areas could require additional sit Darter r other statural controls. Assessing the need for installing roto mil where tin+) may be cashed away during a rain event y and additional control. all be a continuing contract-/wb_b,..tor reponability until final stabilization kl achieved. Contractors and subcontractors Implementing this Son, Equipment worm down (except fa wheal sawas) should take place within an area surrmndea b a bem. The useOfdetergent Y use ori dKegen0 Is prohibited. must remain dart to the need to periodically refine and update this SWOOP In order to accomplish the intended pods. Notka TermIn bwadws Mabel ct Chemicals, points, advents, frtil¢ers, and other toxic - hazardous materials should be stored In their original containers (If -igind contain is not reswlabla. of tfah C°mPlimas of the site with the General Construction Permit reholns the reaponsblity of d operators that hhow submitted an NO until such time an they how submitted a Notice of Termination (NOT). The pe TIttees tho¢atim to discharge store the products In clearly labeled, t y era erpreaf cmettMra). Except during application, the containers should be kept in Weirs in beamed under the General Construction Permit terminates t (might f the day the NOT s signed. Or areae within owned t -ager facilftiw. Runoff c -taming arch materials shill be Wlmted, renawd tram the dlpamed elle, and of In ac.rdw with the federal, state, and local mgul tions Al Parmittess must submit an NOT within thirty (30) day. after me Or more of the following conditions - how been met As may be required by federal, state a IoW regulations, the Contractor dwuld have a Hazardous Moulds Management Plan ond/or Hazardous Materials Spill and Prevention Program in place. A foremen r W,,wAsor should be designated h writing to oversee, enforce, Instruct 1. Final stabilization has been achieved on all portions of the site for which the prmRtnn was repanelble. and construction rakers an Proper hazardous materials storage and hand" procedures. The location of cry hazardous material Kora Q° rpeo be Indicated an the stamratr Pollution 2. Mother operate/permittee hos assumed control °ver all acus of the site that have not been finally stabilized. Prov-Uon plan by the oprotor following the preps, 9 on-site location f the et -age Matrid Handing d SOON Prevention 3. In residential construction operations, temporary stabiltratl- has oxen completed ond the rwldence, has bear trap Neared t° the homacenr. Discharge of hazardous substances or oil Into stolmpter is subject to reporting requirements, in the .vent of It pAI of a hazardous substance, the operates l. required to notify the Notional Reponse 813 EROSION AND ks7vyENT CON IOL SPECIFICAI]ONS FOR INDPADUAl p Center shill wbrelt O mitten d..oripum o/ at the pAI. In edal rel the athe data the .-424-13802) to property and the ilea. (including the type and amount of material released, the data of the release, the or Since the -tire sit. le under a singl. dwnrship, thus os not any Individual building let.. If the rrsieaee, -d the tpe to be tai- to prevent future J to the Iocd governing authority. The SWPPP uK be revised within 14 W -dor day. agar the L7 OESrsllpnlYl PO1111TANT5 A D n/FN eNsc 7m wiTM ns release to rellect the roles°, stating the information drove d -g with modifications to minimize the possibility of future ocdumnew. Each Protractor and wbcontroctm is ropondbe for complying with these reporting requlren-ts, The proposed kind useea residential dein pollutants and error. of each Cm h 1Yaefh pollutant nartwlly expected from this type of land use os listed bdon .t All mate +tire waste material Noll be conipstely contained and di state. and federal mqulatione. A pit or container Is -qulmd ah- 6-1.9 c� ._t.c qudrtes. with all loc°I, Pollutant Sauran: pe 1 Pollutant 0A, PassengerW .%dill �� y hydra had, hydrocarbon associated T gasdInd dower geann, tihs.z•, aNd-icin dame tide and lubricants, SDA/ Reponnn % n n. fluid. wiutkn. brake Auld broke dust, bier, glass. Wal roil plastic rubber. . glow, fragm-t0. qrH. rood drkfrnq materials. Mina - Small pins that typlcdy Involve oil, gasoline. Paint, hydraulic fluid etc., con be controlled by the first -bander at the discovery of th. all. Pollutant Scums: Building Contain -POI to prevent matwtal nom entering stom a ground aatr. Do not flush with rote a Type of Pdlutmt Cronin Rdutlons a sdv-t0. leeks from HVAC oggregate a rubber negro-ts from roofing system, equipment, grit from root drama ' Use Map- oa rbepnroperlyrtal to dean -up pill material and my subsequently contanhated mil end Pollutant Source: Trash dumpetr Sena -Significant Spills - Approximately t- gallons or law of with Type of Pollutant Clearing •dutlon. a sdwnts, Iltter (papa, Plastic, g -rd refuse disociated wfth distribution operations), uneaten food products, bacteria. Pollutant no cwtaminatlon ( surface ratan. Minor apNle con be q -wall t ground a Prsdnnd Thin y cantrdled by the Pest rwp-dr with help frail other site r.panee may raqutro other peroli-e to atop to Pollutant Scuasst Parkin lot 9 make ours the pAI Ie quickly and wfdy eddr.s•ad. At me discov.ry of the all; • Contain pAI to prevent maternal from entering Kam Or ground water. Do not flush with water r bury. Type of Pollutant: M y pollutant awocoted with 'vehlclr sources, grit from asphalt sowing surface bituminous =P=als from periotic maintenance (seolhg, resurfacing and patching). pavem-t da-l.lnq • Use ab•abent material to don -up pill,, and dispose of property. Spl e an Imp_A_. surto.. matrlds. DIM+ frMgmarts from parking stall stripes, concrete fragments, rind-blwn Iltter ham off -she sources, elavoted ter temperatures hen contact with inp°rvlow. surfaces, should be dlep°aed of asp as pdami to Provent migration deeper Into the soil and g undwat- dpas st omtaninatad NR - absorbents properly. Pollutant S-- Lawn -d land. pm ave• • Canted 911 if the pAI could be a safety Issue, • Contact su.H pervl.as and designated e Inpectae immediately. Type of Pollutant: Fertr ilizs, mil, organic material (leal mulch, goes clippings) • Contaminated "We are to be removed to an approved landfill. Maj- a Hazardous Spite - Mas than t- gallons there is the potential for death, Injury a Alms. to humcns a animals. a has the pot-tWl Is sulaan a groundeater "ct` i Th rein gardens and Aqua -Swirl sill remain In place as pemar, fmturw aRr cOnKructbn l. completed. purpose f the theme measures M to restrict pollutl-. • Control a eantaIn the ail rithafa riddnq badly harm. Tempororly Plug atom drains If bl D°w a to stormwate, dschages .d DroNdie a - removal funct�' prevent migdtton of the pAI Into tin .tamwatr system • Ion tedk7tdy canted the local Fire Dprtm-t at 917 to export any hazadcus matrl.l pAI. • tact wDrYlsas and designated sit° Mpec=on man kitdy. GL OESaiPnON 6 PROP2cFn PIXT ren, .W.- - n .RES at Gov.mIn' wNarttNs r.panebls lar atom t- /adttiw should W eontocted • dl. The contracts is responsible tar having thsem cantect cumbers aveAWe at the jab efts A written report N -to be submitted to the a -r as Veaatated cease Vegetated °e°les are designed to reroute polutanta and eediment loads M Kam rata Stem • mso- an possbla s pon as Possible but within 2 hours of discovery, contact the IoW Og-dy repanebl. far pill moq•rn-t The following informT ian should be noted f- future nparta to the og rtmoif water runoN Is directed into the -can which canwya the runoff from the site. Who. moving through the orale, noff velocity Is greatly deeaea.ed allowing biofiltration (uptake of nutrient* by plants). Infiltration (DrWOUah of water through the ewde'e ^ Non., addre. d ph • number of person making the pill report y ^ Th• locatio of the pill Par- -4 substrate). -d sedimentation, (nntUMg Out d later sup-ded partial..;. ^ lin. tine t oe pAI Permanent V ^ Ict-tMcatim f Dine pilled substanp ^ ADproxknat+ �antlty of the wbstanan that has bon- pilled a may be Nrthr pined ^ Ths duration tl a.- of the -e mil 7° dame will be Placed In laem saw and eeeded win gra., and graded not to axe••d 3:1 dap•& proposed pe tars. and Nn,b. will deg De added. Thaw Blo areas cull act Ps a natural filter pill ^ Noma -d IOcatlon f the damaged rater. ^ Name of pot response orymlzutim trip to help Improv Kam water quality. The vag.tated s rOf dor the eel«itis of atom crater runoff, reduce sediment runoff, and reduces pradama associated with mud -dust hen beer •• Wilmot madeums, were token In the pAI reponse mils ReM Grd-e / Bkw._ Other •• Othinfamatlon shot ay ba significant_ Addtlk> s requirements may be A { tk,.,A � Blor•tentbn ceras (somatlmw called min g -dens) are structural etO m eater control. that tomporarfy sl runoff using -1. and capture and landscaped mrpulotions pas -t pill reponse Professional Nould be consulted to make dl appropriate and required .Wean haw been bk-. Contaminated mdla..1add only be pollutants. Blare+ -Wim ops cue -Sheared fgdltle. h whin nnoH hl Pw_)a sin oro. to rwnove treatment s Nset hen to tin• trpfm-t asp consisting of removed from the site aRr ppprowl is Shen by the appropriate aq-cy a grew buffy strip, banding arm, agenic I layer, mal and vegetation. 814 MON MMNG AND MAINTENANCE GUIDFI NES FOR ♦ IZROP(140 ¢lip♦ - Inenmti- cv,ed /R ortl MammiW BMP (A a -c N1 A BLP structure and be Installed at the downstream and of the atom Rea- system, prior to the storm wear outfit The primoy purpose of the BAP l. to Ali Impacted owe an well . ail erosion roil esdbn-t verminal dint., rill be repeated °Mary such (7 col -der day. and within 24 hour aRr a roMfdl of QS ind remove .dim-!, opo and ficatdNe daDrl. hen the Kormptr prior to dschargInq ham the site. The Mechanical BNP etruduro tllzw hydrod�omk forces to remove Pollutants from the runoff. Throe pollutants captured within the structure a greater. whom sit. haw been final temporarily stabilized or an sits rhea runoff Is unlikely due to winter conditi-a (e.g_ site is covered with i nmedWtely. and cud -aw, ire r froz- ground exists), much Inspection. shoo be conducted at Inst Once every m -tin. and a aritt- report Prepared. npectfons Nall Ds conducted apa-d, by a dssignateo Tia qualifies Person familia with the USEPA HIDES Stam Water General Goad Housekeeping m- won as regular street swephg, instillation of troN recptades. and reduction In frtlizw ovespmy con be Incorporated by the owner and/or -Pont. Prmit, thin SWPPP, and the Pro)act rY[Y'• Impacts- reports Ndl be completed data Parthe So ding the in of scope of the inpedion, name(•) mtl qudificatbnm of tor, the data of the lnpectl-, abserndi mating to the hplen-tatlan of the SWPPP, and any actions tai- m dYd9WS cpc(yE1C nOMc A O r1wcTR11r pE7ALc a F n. cTr>w I& Th. Viewing Hems are etonmrater q -11t will be d ter-sidredelo lseve ed on. as a result or Inddenb of n-aomplianan noted during the Inspection. The Inspectiononto report should stole whetter the site ps In conplknce or identify my Incidents of noncompOonce. ring lncW-tdWNneTh items oil ern- in plats after canstructton b comPleted cue D°st-°°^structlan Kamaatr quality BMP. m an an OPPY If the inspection tion reports an site and permanently fa a period of, tea yay. fdlorMgtraeonr.t old' '*Thpe aon-.Ite r outhrit reports Y be requested Dy inpectims conducted by the local govrnInq y Sa dthhecA�h9 Plan for the location of the Bio-RRtentlan oeos and Aqua -Swirl. Refer to the SH. Details s. C>Mste�etlah Fntr C3 LoctUons .hoe vehicles milt the sit° Nall De Inpected for avid-ce of off-site sadim-t tracking. Each contract -d wbc-treats Noll beroup-able for maintaining the C-struction Entrance and other cantzpa an des -ped In this SWPPP. DESCIBPTId LF YANTENANCE no NI wL - Fd7 pdST-DpN9'rRr ^-_., _ _ _ eTr.,� ry v' R... ` Mdntenonce mquir--t. fa the stormrotr qudity measures which will nm Ion place a'tr c-etructi_ is complete, are described below. RKr to the BMP Operations and Mainterancei Mmu°I f- more detailed -int-once mquireent. neatmuKa l areas used for storage of materials that cue exposed to precipitation. The purpose l. to a- that trials Y-,ttd Sea, re protected d/ pounded that Ialut-ter of discharge from to_,. cup. Off -alta material st" ams used eddy by tha subject project Pro con.idred to be of the Vegst°tad ewdnn •epuwe little malnt-area 1/ property designs. Mos on needed Bunn the growing inp.at erankn prooleny tri- during tin. flit part project and must be Inducted in the rosion control plane and the site inspection rporta year, annually therroften and removg. sadinmttra�N d an debris annually or mom frill-tl if needed. Seeded areas will be Inspected too confirm that a healthy stand of vegetation Is maintained. The site has ochl.Med final stabilization as II areae a covered with pavement a have a stand of vegetation Rain codes Roin garden eywtems require regular Inspection and mointmance to -sun the system I. functioning Properly. Replace mulch as needed, treat diemsed vegetatlon with at least 701 of the badground vegetation dwelty. The density of 701 a greater must be maintained to be corddrsd w etolat ad The grata a their epeesentatha NI water, (amps:m, an needed and Mpect for sediment aaumulotbn. MImk�t B11P (A°u and reseed disturbed areas an needed to achieve this goal. -c hl Fro inspection and cleanout I. eritiW fa proper operation. Recommended inspection and maintenance schaduls 'ay with each manufacture. AA contrda should D inpwted at /ww et mce ary eeven (7) calendar days and folloeing my storm event of 0.5 inch sgtr. The following ea.I. Is a list of inpectim - /mointcram, practices that wgl be used far speclfia con 1. GeotestAs/Erosl- Control Mots: Ybsirrq a loos matting must be replaced or era-Onchared. 2 Inlet Protection: If aft'a fence inlet pnotectbn is to be used, sediment shWd be removed when It reaches ppro.1-tely -a-hdf Ns height of N. once, If a sump b used, sediment Nwld W removed when volume o/ the DaeIn is reduced by SOJC 3. Diversion Sealss. CNm debris Or othr obstructions as needed. Damage from .tams or normal aonatructi- cativitW (Iva., tie ruts) shill be repaired Mmedlately. 4. Mu"ng' Inpect fa thin a bare pots eased by natural decompanitlon - reathr-related events. Mulch h high baffle ares shegld be replaced an a regular bade to maintain uniform protection . 5. Sedin-t Trp: Accumulated Yt shall be removed and the D_M shah be n -graded to Its "iI dimensions at much point that the capacity of the Impoundment has been reduced to one-half of Its drighd storage capacity. The removed a°dlrnmt shall be stockpiled s redistributed In cues that are Protected from ro•Im. 6. Sediment Basin: Inrpect froqu-tly to check for damage and to ensure obstructions aro not diminishing the effectiveness of the structures Sediment shall be removed and the basin shoo be re -graded to its Original :I- at ouch point that the capacity of the impoundment has been reduced to 201 of its Original orighd tsaga copacty Tia removed sediment shall be stockpiled a redistributed In reaw that as, hRemovalarmalof 7. t ttected! Fish built-up sediment will Occur when the sediment reaches one-third the height of the fh 8. Stablizea Construction Entrancm Periodic re-Arod'ng and top drawing with additional None, 9. Straw Boles: Replace straw bales that show signs of detria°ttm. 10. vegetation: Protect newly seeded areas fran esceeslve runoff and trdfie will vegetation Is aetmI Establish a watring and f•rtiltring schedule. 11. Goad NouRakeping: Litter, eonaDuatim all and construction chemicals 1p°.ed to etamwetr Nall be prevented nom becoming a pollutant __ tor atorm,mater discharges,through Raemin of outfalls and daily pldwp of Ilttr. 9 9 HAND, INC. (HAMILTON COUNT) AREA NEIGHBORHOOD DEVELOPMENT) 347 South 8th Street, Suite A Noblesville, Indiana 46060 on M O 1'- AMERICAN ®■ STRUCTUREPOINT 7260 shaaMw Stenon 7 Indiwnapdi. Indiana 46251 TEL 317.54755e01 FAX 31 7.U3.0270 www.eaucturspoirKc oro HOME PLACE HOUSING EAST 105TH STREET & MCPHERSON STREET CARMEL, INDIANA 46248 ISSUANCE INDEX DATE: 03117!2017 PROJECT VISCPHASE: REI HEDULE NO. DESCRIPTION DATE 1 TAC COMMENTS 5/10/201 Project Number 2016.00348 STORMWATER POLLUTION PREVENTION PLAN C510