HomeMy WebLinkAbout17080193.19301
27.
25
22:
201
SLOPE 1T.
LENGTH 151
12
1O
75
50
25
CONTRIBUTING OI DRAINAGE AREA
. TWO ACRES MAXIMUM..
RPRAP CHECK DAM
• DAM HETOR - Two FEET MAXMLIkt CENTER OF TIME DAM TO BE AT LEAST MINE NCHES LOWER
THAN THE POINTS OF CONTACT BETWEEN THE UPPERMOST POINTS OF THE WRAP DAM AND
CHANNEL BANKS
SIDE SLOPE - RATIO OF 21 OR FLATTER.
•
SPACING - TOE OF THE UPSTREAM DAM AT SME EIFVAIION AS OVERFLOW WEIR OF THE
DOWNSTREAM DAM.
OVERFLOW AREAS
• STABILIZED TO REDUCE SCCUR/EROSION ALONG SIDES AND BELOW THE DAM
FILTER MECUM
• PLACED ON UP-SLOPE SIDE OF DAN.
HEX17 - TO BASE OF OVFRFLCW WEN NOTCH.
MATERIALS
• GEOTEXTLE FABRIC (8 OUNCE OR HEAVIER: NON -WOVEN).
INOANA DEPARTMENT OF TRANSPORTATION REVELMENT RIPRAP FOR DAL
• IND07 CA NO. 5 AGGREGATE FOR USE AS FILTER MEDIUM (AGGREGATE MUST BE WELL -GRADED}
NOTE, INGOT CA NG 8 AGGREGATE IS ACTABLE F KM S 6 NOT AVALABLE
THE USE OF No. 8 AGGREGATE MAY RE91T N MORE FREQUENT 010ElOPPWID of
THE STRUCTURE AND WILL IMOEAN THE FREQUENCY OF STRUCIM MAINTENANCE.
S
1. LAY OUT THE LOCATION OF THE CHECK DAIL
2 EXCAVATE A CUTOFF TRENCH INTO THE CHANNEL BOTTOM AND DITCH BANKS EXIDDNG R A
MINIMUM OF 18 INCHES BEYOND THE TOP OF THE DITCH BANK.
I INSTALL AND ANCHOR
FILTER FABRIC N THE
CANNEL AND
CUTOFF
TIE/ICI.
4. RACE RPRAP N THE CUTOFF TREIMON AND CHANNEL TO THE LIES AND DIMENSIONS SHOWN N
THE CONSTRUCTION PLANS THE CENTER OF EACH DAM MUST BE AT LEAST WE NOES LOWER
THAN THE UPPERMOST POINTS OF CONTACT BETWEEN THE RPRAP DAM AND CHANNEL BANKS
5, EXTEND THE RPRAR AT LEAST 18 INCE BEYOND THE E NN
TOP OF TCHANNEL BANKS TO KEEP
OVERFLOW FROM ERODING AREAS ADJACENT TO THE CHANNEL BATIKS BEFORE IT RE-ENTERS THE
CHANNEL
6. PLACE FILTER MEDIUM (INGOT CA NO. 5 AGGREGATE) ON THE LR -SLOPE SIDE OF THE DAM.
PLACE FLIER MEDIUM OVER THE ENTIRE FACE OF THE DAM LR TO THE BASE OF THE OVERFLOW
NOR NOTCH.
7. STABILIZE TIE OIANIIEL ABOVE THE 11PPERI1M DAM
0. INSTALL AN EROSION-REZ;:T LNNG N TE GUNNEL BELOW THE LOWERMOST DAM, THE
LINING 94OLLD EXTEND A MINIMUM DISTANCE OF SIX FEET BELOW THE DAM.
2. ADDITIONAL SEDIMENT STORAGE CAN BE PROVIDED BY EXCAVATING A SMALL SEDIMENT TRAP ON
THE UPSTREAM SIDE OF THE CHECK DAN.
�� WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY WHEN CALENDAR
DA15
F SCNFICART EROSION OCCURS BETWEEN DAMS INSTALL AN EROSION -RESISTANT LINER IN THAT
PORTON OF THE CHANNEL
FLIER MECUM
REMOVE ACCUMULATED3Y.->
MAINTAIN CHANNEL CAPACITY. ALLOW DRAINAGE THROUGH THE DAM, AND PPREVENT FLOW A -----
FROM DISPLACING SEDIMENT
AM JaPRAP AND AGGREGATE AS NEEDED TO WAJNTAIN DESIGN HEIGHT AND CROSS SECTION 01 -,k -------------
THE D
WHEN DAMS ARE NO LONGER NEEDED. REMOVE THE RPRAP AND AGGREGATE AM STABILIZE THE Alk
CHANNEL USING AN ER09CN-REStSTANT LINING IF NECESSARY. (WRAP AND AGGREGATE FROM A CREST
THE DAM MAY BE REMOVED OR UTILIZED TO STASPUZE THE CHANNEL) 0 TOE OFOD'�MQAM ECK
DAMS IN PSIENNAL i"]
ROCK CHECK DAM NOT USE CHICK
HOT TO SCALE (REV01/17)
A 3 B
t1i a tX'-
X X X
X
x x x
1 STAPLE PER SO. YD. 9J STARES PER SG YD.
KssaA STAPLE REODUMDEAT04S
B C
C
B C
A
A B B
SLOPE GRADIENT
C _ -
J ETTTCTVEnLIFE
• THE FUNCTIONAL UFE OF AN EROSION CONTROL BLANKET IS DEPENDENT ON THE
MATERIALS USED.
ANCHORING
• STAPLES• PNS OR STAKES USED TO PREVENT MOVEMENT OR DISPLACEMENT OF BLANKET,
X X (FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR SPECIFIC APPLICATIONS)
MATERIALS
• ORGANIC (STRAW, EXCELSIOR. WOVEN PAPER. COCONUT FIBER, ETC.) OR SYNTHETIC MULCH
INCORPORATED NTH A POLYPROPYLENE, NATURAL FIBER OR SIMILAR NETTING MATERIAL
(THE NETTING MAY BE BIODEGRADABLE, PHOTODEGRADABLE OR PERMANENT)
_SPIECIFICATICkS
7RAINAGE AREA
• LJMITCO TO ONE-QUARTER ACRE PER IGO WEAR FEET OF FENCE-
FURTHER
ENCEFURTHER RESTRICTED BY SLOPE STEEPNESS (SEE TABLE 1).
EFFECT UFE
• SIX MONTHS (MA)IMUM).
LOCATION
• INSTALLED PARALLEL TO THE SLOPE CONTOUR.
• MINIMUM OF 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A BROAD. SHALLOW
SEDIMENT POOL
• ACCESSIBLE FOR MAINTENANCE (REMOVAL OF SEDIMENT AND SILT FENCE REPAIR).
SPACING
TABLE 1. SLOPE STEEPNESS RESTRICTIONS
PERCENT SLOPE MAXIMUM DISTANCE
< 2% < 5O1 100 FEET
2x =,5X 50:1 TO 20;1 75 FEET
5x -NOP 20:1 To 10:1 so FEET
lox - 20x' 1O1 TO 5:1 7g FEET
> 201 > 5:1 1 15 FEET
-CONSDER OTHER ALTERNATIVES
NOTE MULTIPLE ROWS OF SILT FENCE ARE NOT RECOMMENDED ON THE SAME SLOPE-
TRENCH
LOPETRENCH
• DEPTH: EIGHT INCHES MINIMUM.
•
WIDTH,. FOUR INCHES MNMUM.
• AFTER INSTALLING THE FENCE BACKFILL NTH SOL MATERIA, AND COMPACT
(TO BURY AND ANCHOR THE LOWER PORTON OF THE FENCE FABRIC).
NOTE: AN ALIEIF/ATIVE TO TRENCHING 6 TO USE MECHANICAL EQUIPMENT
TO PLOW N THE AT F04CE
MATERIALS AND SILT FENCE SPECIFICATIONS
• FABRIC - WOVEN OR NCN-MOVEN GEOTEXTLE FABRIC, MEETING SPECIFIED MINIMUMS
OUTLINED IN TABLE 2 -
TABLE
TABLE 2 GEOTEXTILE FABRIC SPECIFICATIONS FOR SILT FENCE (MINIMUM)
PHYSICAL PROPERTY WOVEN NON -WOVEN
GEOTEXTLE FABRIC GEOTEXIIIE FABRIC
FILTERING EFFICIENCY 55x 85%
TEXTILE STRENGTH AT 20%
ELONGATION
STANDARD STRENGTH 30 LBS PER UNEAL NCH 50 LBS PER LINEAL INCH
EXTRA STRENGTH 50 LBS PER LINEAL INCH 70 LBS PER LINEAL INCH
SLURRY FLOW RATE 0.J GAL IN. ARE F00T 4.5 GAL MIC ARE F00T
WATER FLOW RATE 13 CAL. N. ARE FOOT 220 GAL N. ARE FOOT
UY RESISTANCE 7Ox 851
POST SPACING 7 FEET 5 FEET
NOTE SILT FENCES CAN BE PURCHASED COMMERCIALLY.
• HEIGHT - A MINIMUM OF 18 INCES ABOVE GROUND LEVEL (30 INCHES MAXIMUM).
•
REINFORCEMENT - FABRIC SECURELY FASTENED TO POSTS 'NTH WOOD LATHE
SUPPORT POSTS - 2.2 INCH HARDWOOD POSTS STEEL FENCE POSTS MAY BE
SUBSTITUTED FOR HARDWOOD POSTS (STEEL POSTS SHOULD HAVE PROJECTIONS FOR
FASTENING FABRIC).
• SPACING - EIGHT FEET MAOMUM IS FENCE IS SUPPORTED BY MINE MESH FENCING
SIX FEET MAXIMUM FOR EXTRA -STRENGTH FABRIC WITHOUT WRE BACIGNG
�uY
iOUT THE LOCATION OF THE FENCE SO THAT IS IS PARALLEL TO THE CONTOUR OF
THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A
SEDIMENT STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE
PONT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END
TERMINATES AT A HIGHER ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST
PONT.
2 EXCAVATE AN EIGHT -NCH DEEP BY FOUR -INCH WIDE TRENCH ALONG THE ENTIRE
LENGTH OF THE FENCE UNE INSTALLATION BY PLOWING IS ALSO ACCEPTABLE
3. INSTALL THE $T FENCE WITH THE FILTER FABRIC LOCATED ON THE UP-SLOPE SDE
OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN-SLOPE SDE OF
TLE TRENCH.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY
STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOL A
MINIMUM OF 12 INCHES OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH. (IF
IT IS NECESSARY TO JOIN THE ENDS OF TWO FENCES USE THE JOINT MEM00 940VK
5. LAY ME FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND
EXTEND IT TOWARD THE UP-SLOPE SIDE O" THE TRENCH.
8. BACKFILL THE TRENCH NTH SOIL MATERIAL AND COMPACT IT IN PLACE
NOTE F THE SILT FENCE IS BERING CON TIRMTED ON-SITE ATTACH THE FILTER
FABRIC 70 THE SUPPORT POSTS (REFER TO TABLES 1 AND 2 FOR SPACING AND
HZOEI(Ri SPECIFICATIONS) AID ATTACH WOODEN LATE TO SECURE THE
FABRIC TO THE POSTS ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW
GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWING STEPS 1
THROUGH 6 ABOVE
MhRLNSP�ECTEMTHIN 24 HOURS OF A RAN EVENT AND AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS.
• F FENCE FABRIC TEARS STARTS TO DECOMPOSE. OR IN ANY WAY BECOMES
INEFFECTIVE. REPLACE THE AFFECTED PORTION IMMEDIATELY. ALL REPAIRS 94CULD
MEET SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE
• REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR
WHEN IT REACHES ON -HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT. WHEN
CONTRIBUTING DRAINAGE AREA HAS BEEN STABRUZED, REMOVE THE FENCE AND
SEDIMENT DEPOSITS GRADE THE SITE TO BLEND MTI THE SURROUNDING AREA AND
STABILIZE
(FWITH
FABRIC ' y H POST SECUREDRED WITH UTNE 1 I
COMPAFILL WOOD
FPOSTILE SILT
1.
F"--1-FENCE
SILT FENCE CONSTRUCTION
NOT TO SCALE (REV. 01/17)
SIFFICING SPECIFICATIONS
SEEDBED PREPARATION
. GRADE AND APPLY SOL AMENDMENTS
SEEDING FREQUENCY
. SEED ROUGH GRADED AREAS DAILY WHILE SOL IS STILL LOOSE AND MOIST.
DENSITY OF VEGETATIVE COVER
• EIGHTY PERCENT OR GREATER OVER THE SOL SURFACE
MATERIA S
• SOL AMENDMENTS - SELECT MATERIALS AND RATES AS DETERMINED BY A SOL TEST
(CONTACT YOUR COUNTY SOL AND WATER CONSERVATION DISTRICT OR COOPERATIVE
EXTENSION OFFICE FOR ASSISTANCE AND SOL INFORMATION, INCLUDING AVAILABLE SOL
TESTING SERVICES) OR 400 TO 800 POUNDS OF 12-12-12 ANALYSIS FERTILIZER OR
EQUIVALENT. CONSIDER THE USE OF REDUCED PHOSPHOROUS APPLICATION WHERE SOIL
TESTS INDICATE ADEQUATE PHOSPHOROUS LEVELS IN THE SOL PROFILE
SEED - SELECT APPROPRUR
IATE PLANT SPECIES SEED OR SEED MIXTURES ON THE BASIS
OF QUICK GERMINATION• GROWTH, AND TME OF YEAR TO BE SEEDED BL
(SEE TAE 1).
• MULCH -STRAW. MAY, MOOD FIBER, ME
(TO PROTECT SEEDBED, RETAIN MOISTURE.
AND ENOCURAGE PLANT GROWTH)_ ANCHORED TO PREVENT REMOVAL BY WIND OR
WATER OR COVERED WTH MANUFACTURED EROSION CONTROL BLANKETS
X
TABLE 1. SLOPE STEEPNESS RESTRICTIONS
NOTE SOW EROSION CONTROL BLANKET NETTINGS MAY POSE A THREAT TO S® SPECIES' RATE PER ACRE PLANTING DEPTH OPTIMUM DATES -
CERTAIN SPECS OF WILDLIFE F THEY BECOME ENTANGLED N THE NETTING WHEAT OR RYE 150 LBS 1 TO 1-172 INCHES SEPT. 15 -OCT. 30
X X MATRIX SPRING OATS 100 LBS 1 NCH MARCH 1 -APRIL 15
• SO TO 12 -NCH STAPLES. PINS OR STAKES ANNUAL RYE(XRASS 40 LBS 1/4 NCH AA1-MAY 1
AM UG. I -SEPT. i
VISTA ATON GERMAN MILLET 40 LIM 1 TO 2 INCHES MAY 1 -,ONE 1
I. ELECT THE TYPE AND WEIGHT OF EROSION CONTROL BLANKET TO FIT THE SITE
X CONDITIONS (EG. SLOPE CHANNEL, FLOW VELOCITY) PER THE MANUFACTURER'S S110AR(RASS LBS i TO 2 INCHES MAY 1 -JULY 30
RECOMMENDATIONS. BUCKWHEAT 60 LBS 1 TO 2 INCHES APRIL 15-JJNE 1
2. PREPARE THE SFIDBED. App $OIL AMENDMENTS, AND PERMANENTLY SEED THE AREA CORN 0 300 LBS 110 2 INCHES MAY 11 -AUG 10
IMMEDIATELY FOLLOWINGSEEDBED PREPARATION. SORCHUY 35 LOS 1 TO 2 INCHES MAY 1 -JULY 1S
1 LAY EROSION CONTROL BLANKETS
ON THE SEEDED AREA 50 THAT THEY ARE IN pERENNAL SPECIES NAY BE USED AS A TEMPORARY COVER, ESPECIALLY IF THE AREA TO
CONTINUOUS CONTACT WITH THE SOL WlH EACH LOP -SLOPE ON UP -STREAM BLANKET SEEDED WW1 REMAIN IDLE FOR MORE THAN ONE YEAR
2 STARES PER SO YD.
ADO'TL STAPLES AS
REO'D. DIE TO
DEPTH O FLOW
® X
X
OVERAPPING THE DOWN-SLOPE OR DOWN STREAM BLANKET BY AT LEAST EIGHT INCHES
B SEEDING DONE OUTSIDE THE OPTIMUM SEEDING DATES INCREASES THE CHANCES OF
OR FOLLOW MANUFACTURER'S RECOMMENDATIONS
SEEDING FAILURE DATES MAY BE EXTENDED OR SHORTENED BASED ON THE LOCATION OF
4. TUCK THE UPPERMOST EDGE OF THE UPPER BLANKETS INTO A CHECK SLOT (SIT TRENCH),
N E STATE
THE PROCT WARTH
.E
BACKFILL WITH SOL AND TAMP DOWN. IN CERTAIN APPLICATIONS, THE MANUFACTURER MAY
NOTES.
REOURE ADDITIONAL CHECK SLOTS AT SPECIFIC LOCATIONS DOWN SLOPE FROM THE
MULCH ALONE IS AN ACCEPTABLE TEMPORARY COVER AND MAY BE USED IN UEU OF
UPPERMOST EDOF THE UPPER BLANKETS
GE
S ARCHON THE BLANKETS IN PUCE BY DRIVING STAPLES PINS OR STAKES THROUGH THE
TEMPORARY 5®MNG PROVIDED THAT IT IS APPROPRIATELY ANCHORED.
BLANKET AND INTO THE UNDERLYING SOL FOLLOW AN ANC ORING PATTERN APPROPRIATE
A HIGH POTENTIAL FOR FERTAN
UZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BKS,
FGR THE SITE CONDITIONS AND AS RECOMMENDED BY THE MANUFACTURER.
CUTS AND N CHANNELS AND AREAS OF CONCENTRATED FLOW.
whallaMiN•• IINEWITHIN 24 HOURS OF EACH RAEN
N EVENT AND AT LEAST ONCE EVERY SEVEN
®LAEBrAIM
M2VBED PREPARATION
S'
CALENDAR DAYS
1. TEST SOL TO DETERMINE pH AND NUTRIENT LEVELS
CHECK FOR EROSION OR DISPLACEMENT OF THE BLANKET.
2. APPLY SOL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST. F TESTING IS NOT
• IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING THE
DONE APPLY 400 TO 800 POUNDS PER ACRE OF 12-12-12 ANALYSIS FERTILIZER, OR
ERODED AREA, ADD SOL AND TAMP, R® THE AREA, REPLACE AND STAPLE THE
EQUIVALENT.
BLANKET.
3. WORK THE SOL AMENDMENTS INTO THE UPPER TWO TO FOUR INCUS OF THE SOL WITH
NOTES
A DISK OR RAKE OPERATED ACROSS THE SLOPE.
GUNNEL LININGS UTILIZE STAPLE PATTERN 'C' NTH ADDITIONAL STAPLES ON SIDE SLOPS
DETAILS ARE STE SPECIFIC, SO MANUFACTURER'S
AT PROJECTED WATER UNE
SEEDING
1. SELECT A SEED SPECIES OR AN APPROPRIATE SCID MIXTURE AND APPLICATION RALE
STAPLE PATTERNS APPLY TO Al NORTH AMERICAN GREEN EROSION CONTROL BLANKETS
FROM TABLE 1.
2 APPLY S® UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING
STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL
PLANT OR COVER SED TO THE DEPTH SHOWN IN TABLE 1.
AT SLOPE LENGTHS GREATER THAN 3DO FEET OR WHERE DRAINAGE OVER LARGE AREAS IS
NOTES
DIRECTED ONTO THE BLANKETS, STAPLE PATTERN 'C' SHOULD BE UTILIZED.
1. F DRWNC OR BROADCASTING THE SEED, ENSURE GOOD SEED -TD -SOIL
CONTACT BY FIRMING THE SEEDBED NTH A ROLER OR CULTIPACKER AFTER
COMPLETING SEED OPERATIONS
2 -DAILY SEEDING WHEN THE SOIL IS MOIST IS USUALLY MOST EFTECTVE.
X IF SEEDING IS DONE NTH A HYDROSEFDER, FERTILIZER AND MULCH CAN BE
APPLIED WITH THE SEED N A SLURRY MIXTURE.
3. APPLY MULCH AND ANCHOR IT N INCE
• INSPECT CT WTHN 24 HOURS OF EACH RAN EVENT AND AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS.
CHECK FOR EROSION OR MOVEMENT OF MULCH AND REPAIR IMMEDIATELY.
• MONITOR FOR EROSION DAMAGE AND ADEQUATE COVER (80 PERCENT DENSITY); RES®,
FERTIUM AND APPLY MULCH WHERE NECESSARY.
IF NITROGEN DEFICIENCY IS APPARENT, TOP -DRESS FAL SEEDED WHEAT OR RYE
SEEDING WITH 50 POUNDS PER ACRE OF NITROGEN IN FEBRUARY OR MARCH.
NOTE: SILT FENCE IS NOT RECOMMENDED FOR USE AS
A DIVERSION AND SHOULD NOT BE USED ACROSS A
STREAM, CHARNEL OTCH, SWALE OR ANYWHERE
THAT CONCENTRATED FLOW IS ANTICIPATED.
MII l]HI CPF� CJ �FlCAMNS
MATEIALS
TABLE 1. SLOPE STEEPNESS RESTRICTIONS
MATERIAL- IRATE PER ACREI MENTS
SH
OULD BE DRY. FREE OF UNDESIRABLE SEEDS
STRAW OR MAY 2 TONS SPREAD BY HANG OR MACHINE
MUST BE CRIMPED OR ANCHORED (SEE TABLE 2).
WOOD FIBER APPLY WITH A HYDRAULIC MULCH
OR CELLULOSE 1 TON MACHINE AND USE WITH TACKING AGENT.
-MULCHING IS NOT RECOMMENDED N CONCENTRATED FLOWS CONSIDER ER09ON
CONTROL BLANKETS OR OTHER STABILIZATION METHODS
COVER GE
HE MULCH S HOLAD HAVE A UNIFORM DENSITY OF AT LEAST 75 PERCENT OVER
THE SOL SURFACE
ANCHORING
TABLE 2. MULCH ANCHORING METHODS
ANCHORING METHOD'
HOW TO APPLY
MULCH ANCHORING TOOL OR
CRIMP OR PUNCH THE STRAW OR HAY TWO TO
FARM OSI( (DULL SERRATED,
FOUR INCHES INTO THE SOL OPERATE MACHINERY
AND BLADES SET STRAIGHT)
ON THE CONTOUR OF THE SLOPE
CLEATING W1H DOZER TRACKS
OPERATE DOZER W AND DOWN SLOPE TO PREVENT
FORMATION OF RILLS BY DOZER CLEATS,
APPLY ACCORDING TO MANUFACTURER'S
WOO) HYDROMULCH FIBERS
RECOMMENDATIONS
SYNTHETIC TACKIFIERS,
APPLY ACCORDING TO MANUFACTURER'S
BINDERS OR SOIL STABILIZERS
RECOMMENDATIONS
INSTALL NETTING IMMEIXATELY AFTER APPLYING MULCH.
03/17/2017
ANCHOR NETTING WITH STARES EDGES OF NETTING
NETTING (SYNTHETIC OR
STRIPS SHOULD OVERLAP WITH EACH UP-SLOPE STRIP
BIODEGRADABLE MATERIAL)
OVEILAPPNG FOUR TO SIX INCHES OVER THE ADJACENT
DOWN-SLOPE STRIP. BEST SUITED TO SLOPE
CATIONS IN MOST INSTANCES. INSTALLATION
DETAILS ARE STE SPECIFIC, SO MANUFACTURER'S
RECOMMENDATIONS 94OLU BE FOLLOWED.
-ALL FORMS OF MULCH MUST BE ANCHORED TO PREVENT DISPLACEMENT BY WIND
AND/OR WATER
MIRnI Ate„ EUGAU
1. APPLY MULCH AT THE RECOMMENDED RATE SHOWN N TABLE 1.
2. SPREAD T14E MULCH MAIEIAL UFOR/LY BY HAND'
HAYFORK, MULCH BLOWER, OR
HYDRAULIC MULCH MACRE. AFTER SPREADING, NO MORE THAN 25 PERCENT OF THE
GROUND SHOULD BE VISIBLE
3. ANCHOR STRAW OR HAY MULCH IMMEDIATELY AVER APPLICATION. THE MULCH CAN BE
ANCHORED USING ONE OF THE METHODS LISTED BELOW
D. CRIMP NTH A MULCH ANCHORING TOOL, A WEIGHTED FARM DISK WITH DULL
SERRATED BRADS SET STRAIGHT. OR TRACK CLEATS OF A BULLDOZER.
b. APPLY HYDRAULIC MUCH WITH SNORT CELLULOSE FIBERS•
c APPLY A LIQUID TADIFIER, OR
d. COVER WITH NETTING SECURED BY STAPLES.
• INSPECTS WITHIN 24 HOURS OF EACH RAN EVENT AND AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS
• CHECK FOR EROSION OR MOVEMENT OF MULCH; REPAIR DAMAGED MEAS RESEED,
APPLY NEW MULCH AND ANCHOR THE MULCH IN RACE
• CONTINUE INSPECTIONS UNTIL VEGETATION 6 FIRMLY ESTABLISHED.
F EROSION IS SEVER ON RECURRING, USE EROSION CONTROL BLANKETS OR OTHER
MORE SUBSTANTIAL STABILIZATION METHODS TO PROTECT THE AREA
TEMPORARY SEEDING WITH MULCH
HOT TO SCALE (REIT. 01/17)
EWER PPE
F BAN(
EUK
TOP OF DAM Jf
�"'( EMERGENCY
OVERFLOW
WEIR
BOTTOM OF DAM
SECTOR B -B
FSI SLOE STOLE
(1' MIN. THICKNESS) Y MN. THICKNESS)
�� i WL
•z'/ -1
INSPE
i
a '
� P1 STOLE
SECTION A -A
TEN 24 HOURS OF A RMI EVENT AND AT LEAST (NCE EVERY
SEVEN CALENDAR DAYS.
WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABLLZED. REMOVE
AND PROPERLY DISPOSE OF ANY UNSTABLE SEDIMENT AND CONSTRUCTION
MATERIAL, AND RE-STANUZE
ROCK DONUT DETAIL
NOT TO SCALE (REV. 01/17)
HAND, INC.
(HAMILTON COUNTY
AREA
NEIGHBORHOOD
DEVELOPMENT)
347 South 8th Street, Suite A
Noblesville, Indiana 46060
00
AMERICAN
STRUCTUREPOINT
7260 Shadeland Snbon I Indianapolis, Ind,ana 46256
TEL
317.547.5560 1 FAX 317-54].0270
HOME PLACE
HOUSING
EAST 105TH STREET 8K
MCPHERSON STREET
CARMEL, INDIANA 46248
CERTIFIED BY
A
ISSUANCE INDEX
DATE:
03/17/2017
SID`
ou a
O1 AT O1WYE1 N
r MINIMUM MOST CA
IN, ■ AYW®ME
PlH1C RWNa
PROJECT PHASE:
wD IDCAWVO a STF]Y sans
daLXWua REVISION SCHEDULE
u�iNCTMriL CUE (-R+K»Cann mMNA (a NIr1HL"lCAN ff Ts FaRWawiwRsr�,Fsy�1pL NO. DESCRIPTION DATE
Maof34 ETOHt (6) POWs IWMMIM
i TAC COMMENTS E5777261
WA CUE (1) ro TWO AMo OE -MPF (Y-1/2) MOI OAEl6R WFD AGOFAAIE (fOpR G Iq Il
mq° =11)ul, FiIAiYMOrWI°Ec WEE '-' aMnc w s ro Rua eo�sOOf " ro
WaR1tRE FAIWO UWIAYMOR (t .ASA �ARAW UY13t ro PNEYpr NTEIWmN M
AOWLW\1E MD WE O�FAMK �, MA7EJML NON NIV.10E OEATNK EAJOW; sTENGM MDR
�p�{yFMrtlNIMWM WO COallO6 O1 901L5
WIN sEA90NA NIGH 'AAIfR TANF LOTAWNSI
1. IWIAS'.f ALL WgTAMR NO pRQ OAFCRONiE WIWAIL FROM THE FpAMTON AMEA
2 aIDE FLUDATKH AMO CIMMN PoR POWTP.E OpN1MM2 IF 1H SITE OF THE aM(Sp]iM1L11O1 wTtwNa
p1W IpZHX- - OF I�9� MIp6 ®�M FII OAWON AEA C FEET
rRDNN TN Ix WAKE N DMEIIT WaMaT ALLY rNI M
STALL A OILYIXT TIE RYO (!E 011ffi-FCIIOI HW ABOVES
] INPPE F'.LIIfER 1H i I@ND ro WWT I1vd nlac WOAD AGE
A f ET IYMXiVM AAE AKTKIPAFD, R/.rS QOTF%RE FAWC ON TH OI/RFD iOAOAIKWI N
Wg4E srlarrv.
a iIALE AOOFLAW (WOf G M10. ZJ ro TH W1114D FIR OW ,N AND WIDE WOMB M 71E WIMSIRULTON
N.1N4 IFAMM NNE WIIEA2 WMOOM MD DIANA¢
FREIE fO�E fXVEWT ALL STaM TIAWR KIAOFT AFO ORAII.Q F1K01 TN TOPPMARY
yM�lAil MTLWI/EOE� PAD TOA -TTRAP M6. SIN.
• F�fIT MIALY.
I®IIJE PAD M N®m fDi g1IIN/✓E ANO RMAIOT OJITPa.
VOLY RIIA mWiEAKr ta�
- AND A41m CUR nAWEn arra nUMlc MOIDa Project Number 2016.00348
FlI1MN0 AD OLT a U!D F M M11R FROM 1H rnNstWlctllsl GIVE GN a gNE1ED Nro
A M➢IDRIRIP OR BASIL
EROSION CONTROL
NOT N � (REV MM7) DETAILS
C520