HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/ CO #9/-1,052.48/136th Street and Gray Road RAB – Project #16-ENG-54City of Carmel Project 16 -ENG -54 136t" Street and Gray Road RAB CHANGE ORDER #9 Add additional Nursery Sodding, additional grading and preparation for sod, wildflowers for creek embankment and field quantity adjustments. Contract Price prior to this Change Order --------------------------------------------------------------- Contract Price will be increased by this Change Order - - - ----------------------------------------- $3,330,833.26 <$1,052.48> New Contract Price including this Change Order $3,329,780.78 --------------------------------------------------------------------- Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $3,205,200.00 $3,205,200.00 N/A C01 $87,364.65 $3,292,564.65 2.73% CO2 $14,870.68 $3,307,435.33 3.19% CO3 <$1,235.00> $3,306,200.33 3.06% C04 $3,865.00 $3,310,065.83 3.17% C05 $7,710.42 $3,317,776.25 3.39% C06 $10,346.71 $3,328,122.96 3.69% C07 $6,810.30 $3,334,933.26 3.89% C08 <$4,100.00> $3,330,833.26 3.77% C09 <$1,052.48> $3,329,780.78 3.74% CITY OF CARMEL TO: Rieth Riley Construction Co. CONTRACT CHANGE ORDER NO.: 9 1751 W. Minnesota St. DATE: September 28, 2017 Indianapolis, IN 46221 PROJECT NAME: 126`h St and Gray Road Roundabout 136" St and Gray Road Roundabout Gray Rd Culvert Replacement, Culvert 165 CITY P.O. NO.: 100148 and 100149 CITY P.O. DATE: March 1, 2017 �YRO�� I. You are directed to make the following changes in this Contract: For Project 16 -ENG -54, 136`" and Gray Rd Roundabout PO #100148. See attached for Descriptions ITEM UNIT QUANTITY PRICE AMOUNT #049, Right of Way Marker EACH <18.0> $165.00 <$2,970.00> #050, Monument, B EACH <16.0> $700.00 <$11,200.00> #056 Top Soil CYS <450.0> $45.00 <$20,250.00> #059 Sodding, Nursery SYS 4,441.0 $3.00 $13,323.00 #096 Conduit, PVC, 4" LFT 83.0 $12.25 $1,016.75 #100 Wire, No 4, Copper LFT 233.0 $10.00 $2,330.00 #128E Re Grade Seed Areas for Sod LSUM 1.0 $11,001.96 $11,001.96 #129E Wild Flower Plugs W/Blanket LSUM 1.0 $3,842.00 $3,842.00 #130E Barrel Extensions for STR #228 & #230 LSUM 1.0 $1,853.81 $1,853.81 +l ! (-1 DAYS 0 0 0 0 0 0 0 0 E II. The following referenced documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.: N/A The changes result in the following adjustment of Contract Price and Contract Time: Contract Sum prior to this Change Order $3,330,833.26 Contract Sum will be iReFeased/decreased by this Change Order <$1,052.48> New Contract Sum including this Change Order $3,329,780.78 Contract Time Prior to this Change Order 5/20/2017 Substantial Completion Date Days 6/20/2017 Final Completion Date Days Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 5/20/2017 Substantial Completion Date Days 6/20/2017 Final Completion Date Days This Change Order is for full and final settlement of all direct, indirect, impact costs and time extension incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended: DLZ Indiana, LLC, Engineer 157 E. Maryland St. Indianapolis, IN 46204 1v I'lu, �-� i .�33• �tv Date &-S&f�_ The Above Changes Are Accepted: Rieth-Riley Construction Company, Inc 1751 W. Minnesota St. Indianapolis, IN 46221 Date 0&111157 Approved: + P Mayor Member JeraKy Kashman, PE, City Engineer ATTEST: ris4S.ey, Clerk Treasurer Date: P -�-O sap z�- 16 -ENG -54, 136th And Grey Road, Change Order #9 Description of Changes Item #049, Right of Way Markers - This item was deleted by the City of Carmel. Item #050, Monument, B — This item was deleted by the City of Carmel. Item #058, Topsoil — This deletion represents an unused quantity due to use of existing topsoil saved during construction. Item #059, Sodding, Nursery — This project was originally planned to be seeded. Due to the project being ready for seed in the summer months, The City directed that the project be sodded instead of seeded to insure proper growth and coverage and lessen adjacent property owner's displeasure. Item #096, Conduit PVC, 4" — This item overran due to field conditions. Item #100, Wire, No 4, Copper - This item overran due to field conditions. Item #128E, Re Grade Seed Areas for Sod — As the project was planned for seed, grading work was nearly complete for seed. When direction came to change for sod, it included all areas within the right of way, temporary right of way and easements increasing the area to be prepared. The areas already prepared had to be re worked and notched to accommodate the thickness of the sod. And due to the increase in area, additional time and labor was needed to complete the grade preparation. Item #129E, Wildflower Plugs w/Blanket — At the outflow structure at the creek on the south end of the project, the embankment was in very rough condition and eroding badly. At The City's direction, the embankment was cleaned up, re graded and re sloped and prepared for wild flower plantings. The plugs will have growth beginning in Spring of 2018 and the blanket of extra wildflower seed will germinate this fall and give added growth the following year. Item #130E, Barrel Extensions for STR #228 and #230 — While re grading and notching for sod, it was determined that the tops of these structures would be low and cause a depression in the right of way that would create a future mowing issue. Additional barrel extensions were placed at these 2 structures to solve that problem. PROJECT NO 16 -ENG -16,16 -ENG -54,16 -SW -1 07 CONTRACTOR. Rieth Riley Construction Co. INSPECTION CONSULTANT: DLZ Indiana BID AMOUNT. $3.205.200.00 BID DATE. 02/01/17 CONTRACT FORESEEN TOTAL TOTAL RUNNING DESCRIPTION OF DATE NEW % OF CHANGE % OF CHANGE CHANGE ORDER OR FORESEEN UNFORESEEN TOTAL OF CHANGE ORDER BOARD CONTRACT ORDER ORDER NUMBER UNFORESEEN AMOUNT AMOUNT CHANGE ORDERS APPROVED AMOUNT FORESEEN UNFORESEEN Owner directed changes at 001 FORESEEN $87,364.65 $87,364.65 Get_N_Go, Project 16 -SW- 05/17/17 $3,292,564.65 2.73% 107 PO# 100149 Replace 10" watermain 2 UNFORESEEN $14,870.68 $102,235.33 relocation items with 12" $3,307,435.33 0.46% tems, Project 16 -ENG -54, PO# 100148 Replace 3" steel galvanized 3 FORESEEN <$1,235.00> $101,000.33 pipe for electrical with 2" $3,306,200.33 2.60% steel galvanized pipe. 4 UNFORESEEN $3,865.50 $104,865.83 Compensation for Undercut $3,310,065.83 0.57% Areas 5 UNFORESEEN $7,710.42 $112,576.25 Carmel Water Utility Field $3,317,776.25 0.79% Conditions and Additions 6 UNFORESEEN $10,346.71 $122,922.96 Emergency Field Repair of $3,328,122.96 109% 8" Sanity Sewer Change Subgrade Treatment 7 UNFORESEEN $6,810.30 $129,733.26 from Lime to Cement., Project $3,334,933.26 1.29% 16 -ENG -54 Replace Team Inserta 8 UNFORESEEN 44,100.00> $125,633.26 Valves with EZ Valves $3,330,833.26 1.17% Project 16 -ENG -16 Additional Nursery Sodding, 9 FORESEEN <$1,U52.48> $124,680.78 additional sod preparation, $3,329,780.78 2.57% Wildflower planting and final quantity adjustments $85,077.17 $39,503.61 $124,580.78 $3,329,78018 257% 1.17% 0 iginal Bid Anounl $3,205,200.00 Total Change Order(s) Amount $124,580.78 Total Foreseen Change Orders $85,077.17 Total Unforeseen Change Orders $39,503.61 Total % Change Orders vs. Bid Amt. 3.74 ID AI.C4S,.R✓E 00 A --G,-5 TOTAL this Sheet= 765.7423 N Location Area Shape Radius Length Width Height (as needed) Area (SFT) Area (SYS) \k. N Leg Splitter Island Trapezoid 5 20 29 362.5 40.27778 V4 �yyy W Leg Splitter Island, West of Path (x2) Trapezoid 60 56 10 1160 128.8889 W Leg Splitter Island, East of Path (x2) Trapezoid 18 25 18 774 86 S Leg Splitter Island Trapezoid 10 31 47 963.5 107.0556 Center Island Circle 34 3631.681 403.5201 TOTAL this Sheet= 765.7423 , 7-0, , #oS9, S O V D / ' N� 2 s�Ry - F�.� l ,� /� l�l,�as4 ae,,,�•vrs Location Area Shape Length Width Height (as needed) Area (SFT) Area (SYS) W Leg, N Side - Outside Rectangle 15 85 - 1275 141.6667 W Leg, N Side - Outside Rectangle 17 112 - 1904 211.5556 W Leg, N Side - Outside Trapezoid 17 22 10 195 21.66667 W to N Leg, NW Side - Outside Rectangle 11 81 - 891 99 ILK W to N Leg, NW Side - Outside Trapezoid 11 3 31 217 24.11111 N Leg, W Side - Outside Trapezoid 3 7 123 615 68.33333 N Leg, W Side - Outside Trapezoid 8 20 46 644 71.55556 N Leg, W Side - Outside Rectangle 24 36 - 864 96 N Leg, W Side - Outside Rectangle 20 24 - 480 53.33333 N Leg, W Side - Outside Rectangle 12 24 - 288 32 N Leg, E Side - Outside Rectangle 7 37 - 259 28.77778 N Leg, E Side - Outside (Woods Drive) Rectangle 10 49 - 490 54.44444 N Leg, E Side - Outside Rectangle 7 36 - 252 28 N Leg, E Side - Outside Rectangle 8 73 - 584 64.88889 W Side - Outside Hills Trapezoid 60 24 8 336 37.33333 W Side - Outside Hills Rectangle 102 60 - 6120 680 W Side - Outside between Drives Rectangle 18 102 - 1836 204 W Side - Outside between Drives Rectangle 21 3 - 63 7 W Side - Outside Hills Rectangle 39 160 - 6240 693.3333 S Leg, E Side - Outside Triangle 60 - 15 t 450 50 S Leg, E Side - Outside Trapezoid 7 26 157 2590.5 287.8333 S Leg, E Side - Outside Rectangle 15 11 - 165 18.33333 S Leg, E Side - Outside Rectangle 8 3 - 24 2.666667 S to W Leg - Outisde of Path Trapezoid 25 17 106 2226 247.3333 S to W Leg - Outisde of Path Trapezoid 17 45 105 3255 361.6667 S to W Leg - Outisde of Path Trapezoid 45 23 118 4012 445.7778 S to W Leg - Outisde of Path Trapezoid 9 19 105 1470 163.3333 S to W Leg - Outisde of Path Rectangle 12 5 - 60 6.666667 S to W Leg - Outisde of Path Rectangle 7 2 - 14 1.555556 S to W Leg - Outisde of Path Rectangle 2 12 - 24 2.666667 S to W Leg - Inside of Path Rectangle 29 9 - 261 29 S to W Leg - Inside of Path Trapezoid 9 5 42 294 32.66667 ,-z ,�,ti, d s 9, o a �,ti G� A/1,..e SP - a tk S to W Leg - Inside of Path Rectangle 5 105 - 525 58.33333 V S to W Leg - Inside of Path Rectangle 5 150 - 750 83.33333 S to W Leg - Inside of Path Triangle 5 - 130 325 36.11111 TOTAL this Sheet= 4430.556 �V< 'A1-Z0,0Lr TwWVEnAALL T 0 T A L J170.L70'cJy� IW 1.0145 001A W Af & — 7ST' o 5.15 G ven,2c,nr 41"1A 36 o Sys IETH� September 15, 2017 Jt rC gf fig Z90, Afe1VQA>Z <ft0 1dRAE115 I IeSD S PGE IL E Y CONSTRUCTION CO., INC. 100% Quality - 100% Employee Owned • Over 100 Years Mike Smith SENT VIA ELECTRONIC MAIL ONLY: DLZ Construction Observer Manager mismith@dlz.com 157 E. Maryland Street Indianapolis, IN 46204 RE: Gray Road at 136th Street RAB: City of Carmel Project No. 16 -ENG -54 Rieth-Riley Project No. 3200696 Dear Mr. Smith, Below is a summary of the Time and Material effort to regrade for sod areas that were already graded for seed as well as sod notching the remainder of the project. As you are aware, the project documents called for the project to be primarily seed and was changed to all sod mid -project. 8/7/2017 Rework Splitter islands already graded for seed $2,357.21 8/8/2017 Finished dirt with skid steer, excavator and by hand in the small areas infront of the woods property $1,191.91 8/9/2017 Rework for sod notch by BMP structures. $896.83 8/15/2017 Sod notch on all of south west area behind the path $2,011.92 8/16/2017 Finished for sod from north dog leg to west ramp on north side $2,372.75 8/18/2017 Extra sod prep on back side of side walk on west leg $1,338.63 8/19/2017 Finished sod notching dog leg sections of north and south ramps $832.71 ,u (f of2off Total $11,001.96 The total contract value adjustment amount requested for this work is $11,001.96. Please call with any questions. Thanks Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Gary Davis F»o+► P..�� rc Aon,, ff7 /2 A,, kq '7or+ P.O. Box 276 • 1751 W. Minnesota St. - Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com rRG,_ q oe-ZA RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 8/7/17 Work Performed: CONTRACT: 3200696 PROJECT: 136th./Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Rework splitter islands to add sad notch due to last minute change.Rework dirt at Wray and Woods properties for sod as well LABOR 109.05 (b)(1) HOURS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.62 $0.00 FOREMAN - Dewey Rambo 5.50 5.50 $34.05 $187.28 LABORER - David Morrow 5.50 5.50 $23.22 $127.71 LABORER -Tim Nunnley 5.50 5.50 $23.22 $127.71 OPERATOR (103) Steve Bell 5.00 5.00 $34.05 $170.25 OPERATOR (103) Clint Smith 5.50 5.50 $34.05 $187.28 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 CA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 4.00 4.00 $43.10 $172.40 TEAMSTER 0.00 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $972.62 (2) FICA 7.50 % x LINE (2) $72.95 (3) EMPLOYEE HOURS $45.71 (5) RATE EXTENSION CARPENTER 0.00 X $18.20 = $0.00 CARPENTER FOREMAN 0.00 x $18.20 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN - Dewey Rambo 5.50 X $17.76 = $97.68 LABORER - David Morrow 5.50 x $13.96 = $76.78 LABORER -Tim Nunnley 5.50 x $17.76 = $97.68 OPERATOR (103) Steve Bell 5.00 X $17.76 = $88.80 OPERATOR (103) Clint Smith 5.50 X $17.76 = $97.68 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 QA TECH 0.00 X $13.96 = $0.00 SUPERINTENDENT/PROJECT MAN 4.00 x $10.953.80 TEAMSTER 0.00 x $14.91 = $0.00 TOTAL FRINGES $502.42 (4) WORKERS COMPENSATION 4.70 % X LINE (2) $45.71 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $37.45 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $3.89 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $1,635.04 (10) 20 % x LINE (10) $327.01 It 1) GRAND TOTAL LABOR LINES (10) + (11) $1,962.04 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purcnased or Manufactured Description Quantity Unit Unit Price Extenstion 48x16" Bartel Sections 2.00 EA $ 4" Riser Rings 2.00 EA $ $ $ $ $ $ $ $ s $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20)+ (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 11564 3/4 Ton truck $11.79 4.00 $47.16 11110 314 Cat Excavator $70.13 4.00 $280.51 TOTAL LINES (23) + (24) + (25) $327.67 $0.00 12 % x LINE (26) $39.32 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $366.99 (28) (34) 11.1 '1% OF BOND RATE BASED UPON LINE (34) $25.62 (35) 10 % x LINE (35) $2.56 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $2,357.21 (37) Trucking - Stnaght Time $0.00 $0.001 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $327.67 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $327.67 (26) 12 % x LINE (26) $39.32 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $366.99 (28) SUBCONTRACTORS 109.05 (b)(5) TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 %x LINE (30) $3,000.00 OR LESS $0.00 (31) 7 % x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) 8 (33) $2,329.03 (34) 11.1 '1% OF BOND RATE BASED UPON LINE (34) $25.62 (35) 10 % x LINE (35) $2.56 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $2,357.21 (37) Page 2 of 2 p4crE la dr- 24. RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 8/8/17 Work Performed: CONTRACT: 3200696 PROJECT: 136th/Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Finishind dirt with skid steer, excavator and by hand in the small areas in front of the Woods properton for sod. LABOR 109.05 (b)(1) HOi IRC EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.62 $0.00 FOREMAN - Dewey Rambo 2.00 2.00 $34.05 $68.10 LABORER - David Morrow 2.00 2.00 $23.22 $46.44 LABORER - Tim Nunnley 2.00 2.00 $23.22 $46.44 OPERATOR (103) Steven Bell 2.00 2.00 $34.05 $68.10 OPERATOR (103) Clint Smith 2.00 2.00 $34.05 $68.10 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 QA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 4.00 4.00 $43.10 $172.40 TEAMSTER 0.00 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $469.58 (2) FICA 7.550 % x LINE (2) $35.22 (3) EMPLOYEE HOURS X LINE (2) RATE EXTENSION CARPENTER 0.00 X $18.20 - $0.00 CARPENTER FOREMAN 0.00 X $18.20 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 - $0.00 FOREMAN - Dewey Rambo 2.00 x $17.76 = $35.52 LABORER - David Morrow 2.00 x $13.96 = $27.92 LABORER - Tim Nunnley 2.00 x $17.76 - $35.52 OPERATOR (103) Steven Bell 2.00 x $17.76 = $35.52 OPERATOR (103) Clint Smith 2.00 x $17.76 = $35.52 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 QA TECH 0.00 X $13.96 = $0.00 SUPERINTENDENT/PROJECT MAN 4.00 X $10.95 = $43.80 TEAMSTER 0.00 X $14.91 = $0.00 TOTAL FRINGES $213.80 (4) WORKERS COMPENSATION 4.70 % X LINE (2) $22.07 (5) BODILY INJURY !PROPERTY DAMAGE INSURANCE O.QO % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85'- % X LINE (2) $18.08 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $1.88 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $760.63 (10) 20 % x LINE (10) $152.13 (11) GRAND TOTAL LABOR LINES (10) + (11) $912.75 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) P 6g a aF 2X llurcnaseaor Manufactured Description Quantity Unit Unit Price Extenstion HOURS EXTENSION 11564 314 Ton truck S $ S $ $ $ S S S $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 11564 314 Ton truck $13.50 2.00 $27.00 11118 Cat 938 Loader $69.49 $0.00 R2171324 239 Cat Skid Steer 534.57 2.00 $69.13 11110 Cat 314 Excavator $70.20 2.00 $140.40 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $264.91 (28) Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $236.53 (23) TOTALTRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $236.53 (26) 12 % x LINE (26) $28.38 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $264.91 (28) SUBCONTRACTORS 109.05 (b)(8) TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 % x LINE (30) $3,000.00 OR LESS $0.00 (31) 7 %x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $1,177.66 (34) 1.1 % BOND RATE BASED UPON LINE (34) $12.95 (35) 10 x LINE (35) $1.30 (36) P O TOTAL EXTRA WORK LINES: (34) + (35) + (38) $1,191.91 (37) r i1 Page 2 of 2 f pGE /5 OF Z� RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 8/9/17 Work Performed: CONTRACT: 3200696 PROJECT: 136th/Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Rework for sod notch by BMP strucutres going north to first drive. This is extra because job was not bid for sod in this area. LABOR 109.05 (b)(1) Hni ]PIZ EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.62 $0.00 FOREMAN - Dewey Rambo 2.00 2.00 $34.05 $68.10 LABORER - David Morrow 2.00 2.00 $23.22 $46.44 LABORER - Tim Nunnley 2.00 2.00 $23.22 $46.44 OPERATOR (103) Steven Bell 2.00 2.00 $34.05 $68.10 OPERATOR (103) Clint Smith 2.00 2.00 $34.05 $68.10 OPERATOR OILER 103) 0.00 0.00 $30.51 $0.00 OA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENTIPROJECT MANAGER 0.00 0.00 $43.10 $0.00 TEAMSTER 0.00 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $297.18 (2) FICA 7.50 % x LINE (2) $22.29 (3) EMPLOYEE HOURS $13.97 (5) RATE EXTENSION CARPENTER 0.00 X $18.20 = $0.00 CARPENTER FOREMAN 0.00 X $18.20 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 -• $0.00 FOREMAN - Dewey Rambo 2.00 x $17.76 = $35.52 LABORER - David Morrow 2.00 x $13.96 = $27.92 LABORER - Tim Nunnley 2.00 x $17.76 =• $35.52 OPERATOR (103) Steven Bell 2.00 x $17.76 = $35.52 OPERATOR (103) Clint Smith 2.00 x $17.76 = $35.52 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 OA TECH 0.00 X 1 $13.961 $0.00 SUPERINTENDENT/PROJECT MAN 0.00 x $10.951 $0.00 TEAMSTER 0.00 x $14.9111 $0.00 TOTAL FRINGES $170.00 (4) WORKERS COMPENSATION 4.70 % X LINE (2) $13.97 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT X3.85' % X LINE (2) $11.44 (7) FEDERAL UNEMPLOYMENT 0.401 % X LINE (2) $1.19 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $516.07 (10) 20 % x LINE (10) $103.21 (11) GRAND TOTAL LABOR LINES (10) + (11) $619.28 (12) Page 1 of 2 Y^&t /z� or, MATERIAL 109.05 (b)(3) Flurcmased or Manufactured Description Quantity Unit Unit Price Extenstion HOURS EXTENSION S a $ a $ a s $ $ $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+(19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 11564 3r4 Ton truck $13.50 2.00 $27.00 11118 Cat 938 Loader $71.06 2.00 $142.11 R2171324 239 Cat Sad steer $34.57 2.00 $69.13 11110 Cat 314 Excavator $70.20 $0.00 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $266.83 (28) Trucking - Striaght Time $0,00 0.0 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 $U UU1 TOTAL EQUIPMENT $238.24 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $238.24 (26) 12 % x LINE (26) $28.59 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $266.83 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 % x LINE (30) $3,000.00 OR LESS $0.00 (31) 7 %x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $886.11 (34) ..,.'c' %OF BOND RATE BASED UPON LINE (34) $9.75 (35) 10 % x LINE (35) $0.97 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $896.83 (37) L) h Page 2 of 2 P/b4,- /s Gr 2(> RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 8/15/17 Work Performed: CONTRACT: 3200696 PROJECT: 136th/Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Sod notch on all of south west area behind the path. This is extra because the job was bid for seed/straw in these areas. LABOR 109.05 (b)(1) EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.62 $0.00 FOREMAN - Dewey Rambo 3.00 3.00 $34.05 $102.15 LABORER - David Morrow 3.00 3.00 $23.22 $69.66 LABORER - Tim Nunnley 4.00 4.00 $23.22 $92.88 OPERATOR (103) Steven Bell 4.50 4.50 $34.05 $153.23 OPERATOR (103) Clint Smith 4.00 4.00 $34.05 $136.20 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 QA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 4.00 4.00 $43.10 $172.40 TEAMSTER 0.00 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $726.52 (2) FICA 7.50 % x LINE (2) $54.49 (3) EMPLOYEE HOURS $34.15 (5) RATE EXTENSION CARPENTER 0.00 X $18.20 - $0.00 CARPENTER FOREMAN 0.00 X $18.20 - $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN - Dewey Rambo 3.00 x $17.76 = $53.28 LABORER - David Morrow 3.00 x $13.96 = $41.88 LABORER - Tim Nunnley 4.00 x $17.76 = $71.04 OPERATOR (103) Steven Bell 4.50 X $17.76 - $79.92 OPERATOR (103) Clint Smith 4.00 X $17.76 = $71.04 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 QA TECH 0.00 x $13.96 - $0.00 SUPERINTENDENT/PROJECT MA 4.00 x $10.95 - $43.80 TEAMSTER 0.00 1 X $14.91 = $0.00 TOTAL FRINGES $360.96 (4) WORKERS COMPENSATION 4.70 % X LINE (2) $34.15 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $27.97 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $2.91 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $1,206.99 (1o) 20 % x LINE (10) $241.40 (11) GRAND TOTAL LABOR LINES (10) + (11) $1,448.38 (12) Page 1 of 2 fA 6A It, of 26 MATERIAL 109.05 (b)(3) urc ase or Manufactured Descnption Quantity Unit Unit Price Extenstion HOURS EXTENSION 11564 3/4 Ton truck S $ S S $ $ $ $ $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)-(19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109,05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 11564 3/4 Ton truck $11.79 3.00 $35.37 11118 Cat 938 Loader $71.06 4.50 $319.77 R2171324 239 Cat Skid Steer $31.64 4.00 $126.54 11110 Cat 314 Excavator $70.20 $0.00 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $539.48 (28) Trucking - Striaght Time $0.00 $0.00 Tnrcking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $481.68 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $481.68 (26) 12 %x LINE (26) $57.80 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $539.48 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 % x LINE (30) $3,000.00 OR LESS $0.00 (31) 7 % x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) 8 (33) $1,987.87 (34) ' f % OF BOND RATE BASED UPON LINE (34) $21.87 (35) 10 % x LINE (35) $2.19 (36) � TOTAL EXTRA WORK LINES: (34) + (35) + (38) $2,011.92 (37) 1_0 PAGE Page 2 of 2 efCGL / 7 o F .24 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 8/16/17 Work Performed: CONTRACT: 3200696 PROJECT: 136th/Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Finished for sod from north dog leg to west ramp on north side. Job was bid for seed/straw prep in these areas. LABOR 109.05 (b)(1) Hnl IRC EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.62 $0.00 FOREMAN - Dewey Rambo 4.50 4.50 $34.05 $153.23 LABORER - David Morrow 4.50 4.50 $23.22 $104.49 LABORER - Tim Nunnley 5.00 5.00 $23.22 $116.10 OPERATOR (103) Steven Bell 5.00 5.00 $34.05 $170.25 OPERATOR (103) Clint Smith 4.50 4.50 $34.05 $153.23 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 OA TECH 0.00 1 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 4.00 4.00 $43.10 $172.40 TEAMSTER 0.00 1 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $869.69 (2) FICA 7.50 % x LINE (2) $65.23 (3) EMPLOYEE HOURS % X LINE (2) RATE EXTENSION CARPENTER 0.00 X $18.20 c $0.00 CARPENTER FOREMAN 0.00 X $18.20 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN - Dewey Rambo 4.50 X $17.76 = $79.92 LABORER - David Morrow 4.50 x $13.96 = $62.82 LABORER - Tim Nunnley 5.00 X $17.76 = $88.80 OPERATOR (103) Steven Bell 5.00 X $17.76 = $88.80 OPERATOR (103) Clint Smith 4.50 X $17.76 = $79.92 OPERATOR OILER (103) 0.00 X $17.06 - $0.00 OA TECH 0.00 1 x 1 $13.9611 $0.00 SUPERINTENDENT/PROJECT MA 4.00 1 x 1 $10.9511 $43.80 TEAMSTER 0.00 1 x 1 $14.9111 $0.00 TOTAL FRINGES $444.06 (4) WORKERS COMPENSATION 4.70 % X LINE (2) $40.88 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT ASPS:- % X LINE (2) $33.48 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $3.48 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 20 % x LINE (10) GRAND TOTAL LABOR LINES (10) + (11) Page 1 of 2 $0.00 (9) $1,456.81 (1o) $291.36 (11) $1,748.18 (12) MATERIAL 109.05 (b)(3) PurCMas or Manufactured Description Quantity Unit Unit Price Extenstion HOURS EXTENSION $ $ $ $ $ $ $ $ $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+ (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 11564 3/4 Ton truck $11.79 4.50 $53.06 11118 Cat 938 Loader $71.06 3.00 $213.18 R2171324 239 Cat Skid Steer $31.64 5.00 $158.20 11110 Cat 314 Excavator $71.93 1.50 $107.90 Tricking - Strlaght Time $0.00 $0.00 Tacking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $532.33 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $532.33 (26) 12 % x LINE (26) $63.88 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $596.21 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 % x LINE (30) $3,000.00 OR LESS $0.00 (31) 7 % x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $2,344.39 (34) % OF BOND RATE BASED UPON LINE (34) $25.79 (35) 10 % x LINE (35) $2.58 (36) TOTAL EXTRA WORK LINES: (34)+ (35)+ (36) $2,372.75 (37) 10A e. p Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 8/18/17 Work Performed: CONTRACT: 3200696 PROJECT: 136th/Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Extra sod prep on back side of side walk on west leg. LABOR 109.05 (b)(1) HN IRR AGE /9o�2b EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25,62 $0,00 FOREMAN - Dewey Rambo 3.00 3.00 $34.05 $102.15 LABORER - David Morrow 3.00 3.00 $23.22 $69.66 LABORER - Tim Nunnley 3.00 3.00 $23.22 $69.66 OPERATOR (103) Steven Bell 3.00 3.00 $34.05 $102.15 OPERATOR (103) Clint Smith 3.00 3.00 $34.05 $102.15 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 QA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 0.00 $43.10 $0.00 TEAMSTER 0.00 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $445.77 (2) FICA 7.50 % x LINE (2) $33.43 (3) EMPLOYEE HOURS $20.95 (5) RATE EXTENSION CARPENTER 0.00 X $18.20 = $0.00 CARPENTER FOREMAN 0.00 X $18.20 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 X $13.96 = $0.00 FOREMAN - Dewey Rambo 3.00 x $17.76 - $53.28 LABORER - David Morrow 3.00 x $13.96 = $41.88 LABORER - Tim Nunnley 3.00 X $17.76 = $53.28 OPERATOR (103) Steven Bell 3.00 X $17.76 = $53.28 OPERATOR (103) Clint Smith 3.00 x $17.76 = $53.28 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 QA TECH 0.00 x $13.96 = $0.00 SUPERINTENDENT/PROJECT MAN 0.00 x $10.95 - $0.00 TEAMSTER 0.00 x $14.91 = $0.00 TOTAL FRINGES $255.00 (4) WORKERS COMPENSATION 4.70 % X LINE (2) $20.95 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $17.16 (7) FEDERAL UNEMPLOYMENT 0.40 % x LINE (2) $1.78 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $774.10 (10) 20 % x LINE (10) $154.82 (11) GRAND TOTAL LABOR LINES (10) + (11) $928.92 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion HOURS EXTENSION 11564 3/4 Ton truck $13.15 S S S S S S b S MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment 9 CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 11564 3/4 Ton truck $13.15 3.00 $39.45 11118 Cat 938 Loader $71.06 1.50 $106.59 R2171324 239 Cat Skid Steer $32.53 3.00 $97.59 11110 Cat 314 Excavator $71.93 1.50 $107.90 Trucking - Striaght Time $0.00 .00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $351.53 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $351.53 (26) 12 % x LINE (26) $42.18 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $393.71 (28) SUBCONTRACTORS 109.Q5 (b)(6) TOTAL SUBCONTRACT WEEK ENDING 10 % x LINE (30) $3,000.00 OR LESS 7 % x LINE (30) OVER $3,000.00 GRAND TOTAL FOR SUBCONTRACTORS. LINES (30) + (31) + (32) TOTAL OF WORK COMPLETED FOR THE WEEK $0.00 (29) $0.00 (31) $0.00 (32) $0.00 (33) TOTAL LINES (12), (17), (22., (28) & (33) $1,322.63 (34) 1.1 % BOND RATE BASED UPON LINE (34) $14.55 (35) 10 % x LINE (35) $1.45 (3e) TOTAL EXTRA WORK LINES: (34) + (35) + (38) $1,338t (37) Page 2 of 2 ra 6p- 21 of 2,6 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 8/19/17 Work Performed: CONTRACT: 3200696 PROJECT: 136th/Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Finished sod notching dog leg sections of north and south ramps was bid for seed/straw in these areas. LABOR 109.05 (b)(1) Nni iRc EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.62 $0.00 FOREMAN - Dewey Rambo 2.50 2.50 $34.05 $85.13 LABORER - David Morrow 1.50 1.50 $23.22 $34.83 LABORER - Tim Nunnley 1.50 1.50 $23.22 $34.83 OPERATOR (103) Steven Bell 0.00 0.00 $34.05 $0.00 OPERATOR (103) Clint Smith 1.50 1.50 $34.05 $51.08 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 QA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 4.00 4.00 $43.10 $172.40 TEAMSTER 0.00 1 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $378.26 (2) FICA 7.50 % x LINE (2) $28.37 (3) EMPLOYEE HOURS % X LINE (2) RATE EXTENSION CARPENTER 0.00 X $18.20 - $0.00 CARPENTER FOREMAN 0.00 X $18.20 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN - Dewey Rambo 2.50 x $17.76 = $44.40 LABORER - David Morrow 1.50 x $13.96 = $20.94 LABORER - Tim Nunnley 1.50 x $17.76 = $26.64 OPERATOR (103) Steven Bell 0.00 X $17.76 = $0.00 OPERATOR 103) Clint Smith 1.50 X $17.76 = $26.64 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 QA TECH 0.00 x $13.96 = $0.00 SUPERINTENDENT/PROJECT MAN 4.00 x $10.95 - $43.80 TEAMSTER 0.00 x $14.911 $0.00 TOTAL FRINGES $162.42 (4) WORKERS COMPENSATION 4.70 % X LINE (2) $17.78 (5) BODILY INJURY I PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $14.56 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $1.51 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $602.90 (1o) 20 % x LINE (10) $120.58 (11) GRAND TOTAL LABOR LINES (10) + (11) $723.48 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) a� vurcnasea or Manufactured Description Quantity Unit Unit Price Extenstion HOURS EXTENSION 11564 3/4 Ton truck S $ $ $ $ $ $ $ S s MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 11564 3/4 Ton truck $13.50 2.50 $33.75 11118 Cat 938 Loader $69.49 $0.00 R2171324 239 Cat Skid Steer $36.59 1.50 $54.89 11110 Cal 314 Excavator $70.20 $0.00 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $99.27 (28) Trucking - Striaght Time $0.00 0 Trucking - Over Time $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $88.64 (23) TOTALTRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $88.64 (26) 12 % x LINE (26) $10.64 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $99.27 (28) SUBCONTRACTORS 109.05 (b)(8) TOTAL SUBCONTRACT WEEK ENDING 10 % x LINE (30) $3,000.00 OR LESS 7 % x LINE (30) OVER $3,000.00 GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) TOTAL OF WORK COMPLETED FOR THE WEEK $0.00 (29) $0.00 (31) $0.00 (32) $0.00 (33) TOTAL LINES (12), (17), (22;, (28) & (33) $822.76 (34) 4I ; % OF BOND RATE BASED UPON LINE (34) $9.05 (35) 10 % x LINE (35) $0.91 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $832.71 (37) Page 2 of 2 I-- 23 0e= 2,L 1ETH!XLLEY CCO. INC. 61 100% Quality • 100% Employee Owned • Over 100 Years September 7, 2017 Mike Smith DLZ Construction Observer Manager 157 E. Maryland Street Indianapolis, IN 46204 SENT VIA ELECTRONIC MAIL ONLY: mismith@dlz.com RE: Gray Road at 136th Street RAB: City of Carmel Project No. 16 -ENG -54 Rieth-Riley Project No. 3200696 Dear Mr. Smith, Per your request, Rieth-Riley Construction Co., Inc. is proposing two options for Wild Flowers for the project. A breakdown of this pricing is attached on the following page. Item Description Quantity Unit Unit Price I Extension EWA -2 Option #2 - Wild Flower Plugs @ 16" OC with Blanket 1.00 LS $3,842.88 $3,842.88 Please call with any questions. Thanks Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Gary Davis r P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com l n6E W1715audebush Grading, Inc 5 Harger Court. obles«71e, LN 46060 Phone: 317-770-9970 • Fax: 317-770-6636 Proposal Submitted To: Job Name Gray Road RABs and Culvert C.O. 1 Rieth-Riley Location Carmel Phone Date 9/6/17 =ax Revisions Includes 1 Addendum Attention Lee Yarling Estimated By: GreggLecher 317-710-8777 Line Item Description Quantity Unit Unit Price Total Option #1 - Seed only 1001 Wildflower seed mix with blanket (S 150) 1 Lump $1,217.63 $ 1,217.63 Option #2 - Plugs with Seed 1002 Wildflower plugs (@ 16" OC) with seed and 1 Lump $3,493.53 $ 3,493.53 blanket (S150) Special conamons 1 Seed and sod prices exclude finish grading, sod notching, debris removal, and soil preparation. 2 Permanent Seed is priced to take place prior to the installation of landscaping by others. 3 Topsoil and topsoil placement has been excluded from this proposal. 4 Erosion control reporting, maintenance, and removal has been excluded from proposal. 5 Proposal based on work being performed within a standard Monday through Friday work week. 8 Lawn maintenance including mowing, spraying, and post fertilization has been excluded from this proposal. 7 Soil testing, organic, and inorganic soil amendments have been excluded from this proposal. 8 Silt fence includes 1 mobilization. Additional mobilizations will cost $500 each. 9 Seeding Includes 1 mobilization. Additional mobilizations will cost $500 each. 10 Traffic Control has been excluded from this proposal. 11 Quantities are based on the itemized proposal. Invoicing shall be based on actual installed quantities at the unit price shown. 12 Proposal excludes all bonding. 13 Proposal is bid as a complete package. Pricing is subject to change if line Items are deleted from this proposal. 14 Proposal excludes private utility locates. 15 This proposal excludes sales tax. Acceptance Of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. This proposal may be withdrawn if not accepted within 30 days. Authorized Agent Signature and Printed Name Date RIETH-RILEY CONSTRUCTION Sr7c"1VgAfzD EXTRA WORK AGREEMENT p6t_ .256r- �6 DATE: - 8/7/17 Work Performed: CONTRACT: 3200696 PROJECT: 136th/Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Digging up the 2 manholes at the Wray Property and putting barrel sections on them. Hand digging because conduits for lights is very close and backfilled LABOR 109.05 (b)(1) HN IRR EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.62 $0.00 FOREMAN - Dewey Rambo 2.00 2.00 4.00 $34.05 $170.25 LABORER - David Morrow 2.50 1.50 4.00 $23.22 $110.30 LABORER - Chad L 0.00 0.00 $23.22 $0.00 OPERATOR (103) Steve Bell 3.00 1.00 4.00 $34.05 $153.23 OPERATOR (103) Clint Smith 0.00 0.00 $34.05 $0.00 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 CA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 0.00 $43.10 $0.00 TEAMSTER 0.00 1 0.00 1 $27.91 $0.00 FRINGES TOTAL LABOR $433.77 (2) FICA 7.50 % x LINE (2) $32.53 (3) EMPLOYEE HOURS % X LINE (2) RATE EXTENSION CARPENTER 0.00 X $18.20 = $0.00 CARPENTER FOREMAN 0.00 X $18.20 = $0.00 COMBINATION 0.00 X $14.91 = $0.00 FINISHER 0.00 X $13.96 = $0.00 FOREMAN - Dewey Rambo 4.00 X $17.76 = $71.04 LABORER - David Morrow 4.00 X $13.96 = $55.84 LABORER - Chad L 0.00 X $17.76 = $0.00 OPERATOR (103) Steve Bell 4.00 X $17.76 = $71.04 OPERATOR (103) Clint Smith 0.00 X $17.76 = $0.00 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 OA TECH 0.00 X $13.96 = $0.00 SUPERINTENDENT/PROJECT MLN 0.00 X $10.95 = $0.00 TEAMSTER 0.00 X $14.91 = $0.00 TOTAL FRINGES $197.92 (4) WORKERS COMPENSATION 4.70 % X LINE (2) $20.39 (5) BODILY INJURY I PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 4 % X LINE (2) $16.70 (7) FEDERAL UNEMPLOYMENT 6.40 % X LINE (2) $1.74 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 20 % x LINE (10) GRAND TOTAL LABOR LINES (10) + (11) Page 1 of 2 $0.00 (9) $703.05 (1o) $140.61 (11) $843.65 (12) PCPA-.260,9 2(. MATERIAL 109.05 (b)(3) Purcrias or Manufactured Description Quantity Unit Unit Price Extenstion P Riser Barrels 2.00 EA $ 139.50 $ 279.00 11564 314 Ton truck $13.50 $ $ $ $ $ $ $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18) + (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (2011 + (21) EQUIPMENT 109.05 (b)(4) $279.00 (18) $0.00 (19) $279.00 (20) $33.48 (21) $312.48 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 11564 314 Ton truck $13.50 5.50 $74.25 11110 314 Cat Excavator $70.50 2.50 $176.25 11118 938 Cat Loader $69.49 2.50 $173.73 R2171324 239 Cat Skid Steer $32.53 5.50 $178.92 Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $603.14 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $603.14 (26) 12 % x LINE (26) $72.38 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $675.52 (28) SUBCONTRACTORS 109,05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 % x LINE (30) $3,000.00 OR LESS $0.00 (31) 7 % x LINE (30) OVER $3,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) 8 (33) $1,831.65 (34) %OF BOND RATE BASED UPON LINE (34) $20.15 (35) 10 % x LINE (35) $2.01 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $1,853.81 (37) Page 2 of 2 � � u Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 10/10/17 Re: C.O. #9 Project #16 -ENG -54136th Street and Gray Road RAB Doug, please find attached 1 original of same change orders for project #16 -ENG -54 136th Street & Gray Road RAB. Please review & initial for the next BPW Meeting. Change Order #9 - Original Contract Amount: $3,205,200.00 Decrease: $1,052.48 New Contract Amount: $3,329,780.78 Thank you, Lisa Scott 0 Page 1