317225 10/11/2017 CITY OF CARMEL, INDIANA VENDOR: 00353193
A ONE CIVIC SQUARE ACE TECHNOLOGIES LLC CHECK AMOUNT: $""'""4,126.84'
=q CARMEL, INDIANA 46032 73010TH ST CHECK NUMBER: 317225
STE 10303POLIS IN 46256 CHECK DATE: 10/11/17
INDDEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
601 5023990 5118 800.00 OTHER EXPENSES
601 5023990 5175 3,326.84 OTHER EXPENSES
ani
chi
.a
m
U-
0
D D cS
LU N cr
3 z
O �a
Q Q
0 0c0 0000
O N N
00 M rI
O i 4A- ift-
LL Q
Z
�
r
00 00
ME 0r-I
d O O o
M M
v kD 3 Q rn
d 0 0 uLU 4
L
a�
CD � =) *t:L (� 00 Ln V >
O .-i
O L J V Ln Ln c
ZO a
M = O, d
Z
tM W W Z O n C
o C U 0 o � N E
O Q I� a U v
z.
Invoice ACE Technologies,LLC
7301 E.90th Street
Suite 103
Indianapolis,IN 46256
July 17, 2017
Carmel Water Job No: J17
Ken Rhodes Invoice No: 1')005175
City of Carmel
3450 W 131st St
Carmel, IN 46074-8267
Job J17055 General Engineering Services 2017
Professional Services from June 1.2017 to July 14.2017
Professional Personnel
Hours Rate Amount
Senior Process Control
Alvarado, Israel 1.50 115.00 172.50
Process Control 2
Beyer,John 1.00 100.00 100.00
Process Control 1
Johnson,Cody 19.00 100.00 1,900.00
Killion,Vincent 4.00 100.00 400.00
Totals 25.50 2,572.50
Total Labor 2,572.50
Consultants
Material/Parts/Tools/instruments
5/19/2017 SRCC ($184.61)StarTech 754.34
SV565UTPU USB VGA KVM
Total Consultants 754.34 754,34
Total this Invoice $3,326.84
PLEASE REMIT PAYMENT TO: 7301 E.90th St.,Ste 103 Indianapolis,IN 46256
i
Job J17055 General Engineering Services 2017 Invoice 0005175
Billing Backup Friday,July 21,2017
ACE Technologies, LLC Invoice 0005175 Dated 7/17/2017 1:01:42 PM
Job J17055 General Engineering Services 2017
Professional Personnel
Hours Rate Amount
Senior Process Control
IJA Alvarado, Israel 6/21/2017 1.50 115.00 172.50
Plant#1 and Plant#3 data population missing.
Process Control 2
JCB Beyer,John 6/1/2017 1.00 100.00 100.00
Helped Plant 4 figure out why Filter#2 was in an erraed state after FT4202A failed
and put the filter offline.Got PLC logic to get the Rlter module out of stopping state
and back online for plant 4 to run
Process Control 1
CGJ Johnson,Cody 6/7/2017 2.00 100.00 200.00
Fixed issues with Plant 1 to Plant 3/5 communication and Began looking at WT3
Laptop Issues
CGJ Johnson,Cody 6/8/2017 3.00 100.00 300.00
Helped n resolve netowrk issues with W773 Laptop
CGJ Johnson,Cody 6/9/2017 3.00 100.00 300.00
Finished and test WT3 laptop communction
CGJ Johnson,Cody 6/12/2017 7.00 100.00 700.00
Created code that would allow for indavidual filter flow maximums at Plant 5
CGJ Johnson,Cody 6/13/2017 4.00 100.00 400.00
Tested Filter flow maximums at Plant 5
VWK Killion,Vincent 5/30/2017 4.00 100.00 400.00
KVM extenders not workdng again.Went there to replace it.Also replaced faulty KVM
extender ethernet cable to Win911 Computer to fix graphical problems.
Totals 25.50 2,572.50
Total Labor 2,672.50
Consultants
Material/Parts/Tools/instruments
EX 0001969 5/19/2017 SRCC/($184.61)StarTech SV565UTPU 754.34
USB VGA KVM
Total Consultants 764.34 764.34
Total this Job $3,326.84
Total this Report $3,326.84
Page 2
Acetech Invoice
Dated: July 17 , 2017
Comments: (Approved for Payment )
Date: 8—2 - 2017
Invoice#5175
General Engineering
Israel Alvarado -- 1) Plant#1 - Correct, Manually Fill in Missing Web Page Trend Data
John Beyer -- 2) Plant#4- Modify PLC program to correct PLC Logic error
Cody Johnson -- 3) Plant#1 - Resolve communication issues with Plants# 1, 3 & 4
Cody Johnson -- 4) Plant#1 - Resolve On-call Laptop , log in Issues with City I.T.
Cody Johnson -- 5) Plant#1 - Modify Plant Flow reaction programming method to . . .
Reduce starts on Elevated Well Motors
Cody Johnson -- 6) Plant#5 - Modify Programming Methods to provide flexibility . . .
with different Filter flows instead of even flow split
Vincent Killion-- 7) Plant#1 - Resolve Scada control room monitor issues.. Replaced .
the KVM extender and Ethernet cable to Winn 911 computer
Invoice#5175 Dated 7 - 17-2017 is Correct
$3,326.84
Ken Rhodes
Drinking Water Treatment Manager
Scada Controls Engineer
Acetech Invoice
Dated: July 21 , 2017
Comments: (Approved for Payment
Date: 8 - 3 - 2017
Invoice#5118
General Engineering
Cody Johnson -- 1) Plant#1 - Evaluate Wells Activation Issues
Cody Johnson -- 2) Plant#1 - Modify PLC Program to Prevent shut down of All Wells
at same time. Added Timer to shut down Wells one at a time
Vincent Killion -- 3) Plant#5 - Re Establish Scada Graphics Connection
Invoice#5118 Dated 7 - 21 -2017 is Correct
$800.
Ken Rhodes
Drinking Water Treatment Manager
Scada Controls Engineer
�� t4 _X
111v01c@ ACE Technologies, LLC
7301 E.90th Street
Suite 103
Indianapolis,IN 46256
May 16,2017
Carmel Water Job No: J16020
Ken Rhodes Invoice No: 0005118
City of Carmel
3450 W 131 st St
Carmel, IN 46074-8267
Job J16020 General Engineering Services 2016
Professional Services from May 1.2017 to Mav 31.2017
Professional Personnel
Hours Rate Amount
PCE 1
Johnson,Cody 7.00 100.00 700.00
Killion,Vincent 1.00 100.00 100.00
Totals 8.00 800.00
Total Labor 800.00
Total this Invoice $800.00
Outstanding Invoices
Number Date Balance
0005068 4/10/2017 1,845.00
0005073 4/18/2017 1,380.00
Total 3,225.00
PLEASE REMIT PAYMENT TO:7301 E.90th St.,Ste 103 Indianapolis,IN 46256
Job J16020 General Engineering Services 2016 Invoice 0005118
Billing Backup Friday,July 21,2017
ACE Technologies, LLC Invoice 0005118 Dated 5/16/2017 12:57:13 PM
Job J16020 General Engineering Services 2016
Professional Personnel
Hours Rate Amount
PCE 1
CGJ Johnson,Cody 4/24/2017 4.00 100.00 400.00
Deteremined cause of well activation problem at Plant 1
CGJ Johnson,Cody 4/27/2017 3.00 100.00 300.00
Added delay in well shut off to allow them to stager shutdowns at Plant 1
VWK Killion,Vincent 4/26/2017 1.00 100.00 100.00
Plant 5 graphics went down.Got them running again.
Totals 8.00 800.00
Total Labor 800.00
Total this Job ;800.00
Total this Report $800.00
Page 2