Loading...
HomeMy WebLinkAboutC100 SWPPP PHASE 1D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D E ( A ) E ( A ) E ( A ) E ( A ) E ( A ) G G G G G G G G G G G C C C C C C C C C C C G G C W W W W W W W W W W W W W 136TH STREET 7 2 6 9 8 21 22222222 23 D D 1 3 2 SD S D SD 4 4 5 6 78 8 8 8 8 8 7 9 9 10 11 11 11 11 11 12 8 8 5 8 15 4 14 5 5 5 13 8 8 5 IP IP CD SF SF SF SF 4 IP 16 7 7 S F S F S F S F SF SF SF SF SF SF SF SF SF SF 4 4 SD 4 S F 4 POND INFORMATION EXISTING: 2yr = 869.31 10-yr = 869.82 100-yr = 870.31 SPILLWAY = NONE 8 5 (NO GRADING BETWEEN EDGE OF PAVEMENT AND PROPERTY LINE) (NO GRADING BETWEEN EDGE OF PAVEMENT AND PROPERTY LINE) GENERAL NOTES 1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH THE OWNER DURING BIDDING AND DURING CONSTRUCTION ACTIVITIES ALL ITEMS TO BE REMOVED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY FOR THE INSTALLATION OF THE NEW WORK. 2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF WORK, AND TO VERIFY WHICH UTILITIES WILL BE REMOVED BY UTILITY COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY THE UTILITY COMPANY SHALL BE REMOVED BY THE CONTRACTOR. 3.UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE RELOCATED AND/OR CAPPED AND ABANDONED BEFORE CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. 4.ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE PROPERTY OF THE DEMOLITION CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF THE SITE. 5.SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN OFF THE SITE. 6.ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT ARE REMAINING. NO UTILITY SERVICE SHALL BE INTERRUPTED DURING THE CONSTRUCTION PROCESS. 7.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 8.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE NOT SHOWN ON THE PLAN AS BEING REMOVED MAY BE DONE SO, AS LONG AS THE TREE(S) ARE RELOCATED TO AN APPROVED ALTERNATIVE LOCATION ON SITE. 9.IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION PLAN, PLEASE CONTACT THE ENGINEER BEFORE CONTINUING WORK. SITE PREPARATION / SWPPP PHASE 1 NOTES INSTALL PERMIT POSTING AREA. 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. CONSTRUCTION ENTRANCE. USE EXISTING PAVEMENT INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C103 INSTALL SILT FENCE / SILT DIKE. REFER TO DETAILS ON SHEET C103 INSTALL TREE PROTECTION. REFER TO DETAIL ON SHEET C103 REMOVE EXISTING CONCRETE WALK(S) TO NEAREST JOINT (IF APPLICABLE) SAWCUT AND REMOVE EXISTING PAVEMENT FULL DEPTH FOR REMOVAL REMOVE EXISTING TREE(S), SHRUB(S), AND VEGETATION STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING AREA, AND PORT-O-LET AS NEEDED. REMOVE DRAINAGE FEATURES. REFER TO C300 FOR PROPOSED DRAINAGE CONFIGURATION. REMOVE EXISTING DRAINAGE FEATURE REMOVE EXISTING SIGN REMOVE AND REPLACE EXISTING FENCE REMOVE AND REPLACE EXISTING LANDSCAPING ON NEIGHBOR PROPERTY WITH EQUAL OR BETTER MATERIALS. COORDINATE WITH PROPERTY OWNER. DISCONNECT; ABANDON/REMOVE AND RELOCATE ELECTRIC SERVICE LINE(S) AND APPURTENANCES AS SHOWN. TRIM AND CAP 4" DRAIN UNDER PROPOSED DISTURBANCE AREA EXISTING AREAS TOTAL SITE =5.66 AC. DISTURBED =2.85 AC. PERVIOUS =2.79 AC. IMPERVIOUS =2.87 AC. REMOVED ASPHALT PAVEMENT HATCH LEGEND C100 SW P P P P H A S E 1 w1 5 0 4 8 3 - C 1 0 1 s w p p p 1 SWPPP PHASE 1 LEGEND - INLET PROTECTION - FOR INLETS ON 136TH STREET, USE FLEXSTORM PRODUCT (COMPLETELY BELOW GRATE PROTECTION IS REQUIRED). - CONSTRUCTION ENTRANCE - STAGING AREA - POSTING AREA - 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. - INSTALL STRAW WATTLES (GRASS AREA) OR SILT DIKES (PAVEMENT AREA) AS SHOWN. CONTRACTOR TO ADD ADDITIONAL MEASURES AS CONSTRUCTION PHASING AND SITE CONDITIONS DICTATE - CONCRETE WASHOUT - STOCKPILE AREA (TEMPORARY SEEDING REQUIRED) - SILT FENCE - TREE PROTECTION - ROCK CHECK DAM - LIMITS OF DISTURBANCE SD IP SF CD 1 2 3 4 5 6 7 8 9 D EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11.PORTABLE TOILETS MUST BE ANCHORED. 12.REFER TO SITE PLAN, C200, FOR ADDITIONAL NOTES REGARDING TREATMENT OF EXISTING PAVEMENT ONSITE. WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC LINE TYPES UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN RIGHT OF WAY LINE CHAIN LINK FENCE BOARD FENCE WROUGHT IRON FENCE GUARD RAIL HAND RAIL SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W E(A)E(A) E E E C C C C(A)C(A) OHU OHU FM FM SF SF AERIAL FIBER OPTIC CABLEFO(A)FO(A) SECTION LINE FARM FENCE UNDERGROUND FIBER OPTICFOFO INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER STORM SEWER RE V I S I O N S A N D I S S U E S Pa r t o f t h e S E / 4 o f S e c t i o n 2 3 , T o w n s h i p 1 8 N o r t h , R a n g e 3 E a s t , C l a y T o w n s h i p , H a m i l t o n C o u n t y , I n d i a n a W15.0483 PR E P A R E D F O R : 12 4 2 W E S T 1 3 6 T H S T R E E T , C A R M E L , I N 4 6 0 3 2 PROJECT NO. SHEET NO. CH E C K E D B Y : DR A W N B Y : RL W DE S I G N E D B Y : DW G N A M E : PR O J E C T N O . : W1 5 . 0 4 8 3 DA T E BY 05 . 1 9 . 2 0 1 6 SS R DA T E : RL W EN G I N E E R S 31 7 | 8 4 6 - 6 6 1 1 80 0 | 4 5 2 - 6 4 0 8 31 7 | 8 4 3 - 0 5 4 6 fa x W E I H E La n d S u r v e y i n g | C i v i l E n g i n e e r i n g La n d s c a p e A r c h i t e c t u r e AL L A N H . W E I H E , P . E . , L . S . - F O U N D E R 10 5 0 5 N . C o l l e g e A v e n u e In d i a n a p o l i s , I n d i a n a 4 6 2 8 0 we i h e . n e t Know what's below. before you dig.Call R TR A D E R ' S P O I N T C H U R C H O F C A R M E L SU B M I T T E D F O R I N I T I A L R E V I E W 12 . 1 8 . 2 0 1 5 ML T W S N E THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE #18057C207G, DATED NOVEMBER 19, 2014 FLOOD STATEMENT STEVEN SCOTT RUCKER P.E. 11300279 SU B M I T T E D F O R T A C R E V I S I O N S 03 . 1 4 . 2 0 1 6 ML T NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT NOTE SU B M I T T E D F O R D R A I N A G E A P P R O V A L 04 . 2 0 . 2 0 1 6 ML T RE V I S E D F O R D R A I N A G E A P P R O V A L 05 . 1 2 . 2 0 1 6 ML T FI N A L C O N S T R U C T I O N P L A N S 05 . 1 9 . 2 0 1 6 ML T BENCHMARK INFORMATION B.M. - A BRASS DISK, STAMPED HCRB 546, SET IN THE TOP OF A CONCRETE HEADWALL ON THE SOUTHWEST CORNER OF A BOX CULVERT FOR SPRINGMILL ROAD CROSSING OVER WILLIAMS CREEK, APPROXIMATELY 150 FEET NORTH OF 131ST STREET. STATE PLANE COORDINATES: N1723218.01 E188466.11 NAD 83 (CORS96). ELEV. 871.38 NAVD 88 T.B.M. 1 - A CUT " " LOCATED ON THE SOUTHEAST CORNER OF THE CONCRETE PAD FOR A TELEPHONE JUNCTION BOX, LOCATE 39 FEET NORTH OF THE CENTERLINE OF 136TH STREET AND 11 FEET EAST OF THE EAST LINE OF THE SURVEYED PROPERTY. ELEV. 878.05 NAVD 88 10 11 12 13 14 15 16