Loading...
HomeMy WebLinkAboutC101 SWPPP PHASE 2D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D E ( A ) E ( A ) E ( A ) E ( A ) E ( A ) G G G G G G G G G G G C C C C C C C C C C C G G C W W W W W W W W W W W W W 136TH STREET S T M S T M S T M 7 2 6 9 8 21 22222222 23 S T M S T M S T M S T M S T M STM STM STM STM STM D D STM STM POND INFORMATION EXISTING:||PROPOSED: 2yr = 869.31 ||2yr = 867.78 10-yr = 869.82 ||10-yr = 868.47 100-yr = 870.31 ||100-yr = 869.79 SPILLWAY = NONE ||SPILLWAY = 869.80 POND INFORMATION PROPOSED: 2yr = 867.23 10-yr = 867.72 100-yr = 868.52 SPILLWAY = 869.20 IP *IP IP CD CD IP IP IP IP IP 1 2 1 1 1 1 1 1 1 3 3 4 4 5 5 IP 1 5 C101 SW P P P P H A S E 2 w1 5 0 4 8 3 - C 1 0 2 s w p p p 2 RE V I S I O N S A N D I S S U E S Pa r t o f t h e S E / 4 o f S e c t i o n 2 3 , T o w n s h i p 1 8 N o r t h , R a n g e 3 E a s t , C l a y T o w n s h i p , H a m i l t o n C o u n t y , I n d i a n a W15.0483 PR E P A R E D F O R : 12 4 2 W E S T 1 3 6 T H S T R E E T , C A R M E L , I N 4 6 0 3 2 PROJECT NO. SHEET NO. CH E C K E D B Y : DR A W N B Y : RL W DE S I G N E D B Y : DW G N A M E : PR O J E C T N O . : W1 5 . 0 4 8 3 DA T E BY 05 . 1 9 . 2 0 1 6 SS R DA T E : RL W EN G I N E E R S 31 7 | 8 4 6 - 6 6 1 1 80 0 | 4 5 2 - 6 4 0 8 31 7 | 8 4 3 - 0 5 4 6 fa x W E I H E La n d S u r v e y i n g | C i v i l E n g i n e e r i n g La n d s c a p e A r c h i t e c t u r e AL L A N H . W E I H E , P . E . , L . S . - F O U N D E R 10 5 0 5 N . C o l l e g e A v e n u e In d i a n a p o l i s , I n d i a n a 4 6 2 8 0 we i h e . n e t Know what's below. before you dig.Call R TR A D E R ' S P O I N T C H U R C H O F C A R M E L SU B M I T T E D F O R I N I T I A L R E V I E W 12 . 1 8 . 2 0 1 5 ML T W S N E THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE #18057C207G, DATED NOVEMBER 19, 2014 FLOOD STATEMENT STEVEN SCOTT RUCKER P.E. 11300279 SU B M I T T E D F O R T A C R E V I S I O N S 03 . 1 4 . 2 0 1 6 ML T NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT NOTE SU B M I T T E D F O R D R A I N A G E A P P R O V A L 04 . 2 0 . 2 0 1 6 ML T RE V I S E D F O R D R A I N A G E A P P R O V A L 05 . 1 2 . 2 0 1 6 ML T FI N A L C O N S T R U C T I O N P L A N S 05 . 1 9 . 2 0 1 6 ML T CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC DISTURBED ACREAGE = 2.85± AC. SWPPP PHASE 2 LEGEND - INLET PROTECTION - FOR INLETS ON 136TH STREET, USE FLEXSTORM PRODUCT (COMPLETELY BELOW GRATE PROTECTION IS REQUIRED). - PERMANENT/TEMPORARY SEEDING USE PLANTING CHART - EROSION CONTROL BLANKET - USE S150BN BIO-NET AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL - LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS) - RIPRAP, REFER TO GRADING PLAN SHEET C300 FOR SIZING - SITE DISCHARGE POINT - ROCK CHECK DAM - MULCH AREA. SEE LANDSCAPE PLAN FOR ACTUAL LOCATION. IP * D LINE TYPES UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN RIGHT OF WAY LINE CHAIN LINK FENCE BOARD FENCE WROUGHT IRON FENCE GUARD RAIL HAND RAIL SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W E(A)E(A) E E E C C C C(A)C(A) OHU OHU FM FM SF SF AERIAL FIBER OPTIC CABLEFO(A)FO(A) SECTION LINE FARM FENCE UNDERGROUND FIBER OPTICFOFO INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER STORM SEWER EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. 4.THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. 5.THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11.PORTABLE TOILETS MUST BE ANCHORED. BMP NOTES INLET PROTECTION (9) MECHANICAL WATER QUALITY UNIT (1) LEVEL SPREADERS WITH UNDERDRAINS (2) FLOWLINE WITH SSD FOR POND CONVEYANCE (1) DRY POND 1 2 BENCHMARK INFORMATION LAND DESCRIPTION BEGINNING AT A POINT ON THE SOUTH LINE OF THE SOUTHEAST QUARTER OF SECTION 23, TOWNSHIP 18 NORTH, RANGE 3 EAST, SAID POINT OF BEGINNING BEING NORTH 88 DEGREES 55 MINUTES 42 SECONDS EAST (ASSUMED BEARING) 1000.85 FEET FROM THE SOUTHWEST CORNER OF SAID SOUTHEAST QUARTER; THENCE NORTH 00 DEGREES 00 MINUTES 28 SECONDS EAST 791.89 FEET;** THENCE NORTH 88 DEGREES 55 MINUTES 42 SECONDS EAST 330.11 FEET TO THE EAST LINE OF THE SOUTHWEST QUARTER OF SAID SOUTHEAST QUARTER; THENCE SOUTH 00 DEGREES 00 MINUTES 28 SECONDS WEST 791.89 FEET TO THE SOUTHEAST CORNER OF THE SOUTHWEST QUARTER OF SAID SOUTHEAST QUARTER; THENCE SOUTH 88 DEGREES 55 MINUTES 42 SECONDS WEST 330.11 FEET TO THE POINT OF BEGINNING. **THE UNDERLINED COURSE WAS OMITTED FROM THE CURRENT DEED. THE OMITTED COURSE IS TRANSCRIBED FROM THE PRIOR DEED OF RECORD, JUSTIN A. ROBERTS TO BOARD OF TRUSTEES OF CENTRAL CHRISTIAN CHURCH, RECORDED JUNE 19, 1978, IN DEED RECORD 305, PAGE 26 IN THE OFFICE OF THE RECORDER OF HAMILTON COUNTY, INDIANA. B.M. - A BRASS DISK, STAMPED HCRB 546, SET IN THE TOP OF A CONCRETE HEADWALL ON THE SOUTHWEST CORNER OF A BOX CULVERT FOR SPRINGMILL ROAD CROSSING OVER WILLIAMS CREEK, APPROXIMATELY 150 FEET NORTH OF 131ST STREET. STATE PLANE COORDINATES: N1723218.01 E188466.11 NAD 83 (CORS96). ELEV. 871.38 NAVD 88 T.B.M. 1 - A CUT " " LOCATED ON THE SOUTHEAST CORNER OF THE CONCRETE PAD FOR A TELEPHONE JUNCTION BOX, LOCATE 39 FEET NORTH OF THE CENTERLINE OF 136TH STREET AND 11 FEET EAST OF THE EAST LINE OF THE SURVEYED PROPERTY. ELEV. 878.05 NAVD 88 3 CD PERFORATED SUBSURFACE DRAIN 4 5