HomeMy WebLinkAboutC103 SWPPP DETAILSSEDIMENTATION/SILT FENCE
MAXIMUM LOAD SLOPE AND DISTANCE FOR
WHICH A SILT FENCE IS APPLICABLE
INSTALLATION
PREFABRICATED SILT FENCE
1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT
STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER
ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT.
2. EXCAVATE AN EIGHT-INCH DEEP BY FOUR-INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO ACCEPTABLE.
3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP-SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN-SLOPE SIDE OF THE TRENCH.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL. MINIMUM OF 12 INCHES
OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH.
5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP-SLOPE SIDE OF THE TRENCH.
6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE.
NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON-SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO SECURE THE FABRIC TO THE POSTS.
ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWING STEPS 1 THROUGH 6 ABOVE.
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
_ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. NOTE: ALL REPAIRS SHOULD MEET
SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE.
_ REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE-HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT. WHEN
CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA, AND STABILIZE.
REFERENCE IN CHAPTER 7 PAGES 215-221 IN THE INDIANA STORM WATER QUALITY MANUAL
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED AT
LEAST ONE FULL TURN TO SECURE
SILT FENCE END IN PLACE
SILT FENCE
SILT FENCE
POST
TO JOIN TO
ENDS OF TWO
FENCES.
EMBEDDED SILT FENCE MATERIAL MIN. 8"
INTO GROUND W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN ACCORDANCE
WITH ASTM D 6462 8.2.2 IS ALSO
ACCEPTABLE.
GEOTEXTILE FABRIC LAID ON
DOWN SLOPE SIDE AND
BOTTOM OF TRENCH
8"X4" TRENCH TO BE BACKFILLED
AND COMPACTED
WOVEN FILTER FABRIC SILT
FENCE MATERIAL COVER
POST 2"X2" WOOD OR 1.33
LBS/FOOT STEEL 6' MAX.
SPACING
EMBEDDED SILT FENCE MATERIAL MIN. 8"
INTO GROUND W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN ACCORDANCE WITH
ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE.
GEOTEXTILE FABRIC LAID
ON DOWN SLOPE SIDE AND
BOTTOM OF TRENCH
POST 2"X2" WOOD OR 1.33 LBS/FOOT
STEEL 8' MAX. SPACING
WIRE FENCE 14 GUAGE (MIN)-6" MESH
REQ'D. IN SWALES OR AREAS OF
CONCENTRATED FLOW
NONWOVEN FILTER FABRIC -
SECURE TO POSTS WITH 2" LATH
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED
AT LEAST TWO FULL TURNS TO
PROVIDE A SECURE CONNECTION
WOOD OR METAL
STAKES TO SECURE
THE STRAW BALES
(TWO PER BALE)
10 MIL. PLASTIC LINING
STRAW BALE (TYP)
SECTION LINE
STRAW BALE (TYP)
BINDING WIRE
WOOD OR METAL
STAKES (TYP) - 2 PER
BALENATIVE MATERIAL (OPTIONAL)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
(NO SCALE)TYPE "ABOVE GRADE
W/ STRAW BALES"
4"
WOOD OR METAL
STAKES TO SECURE
THE STRAW BALES
(TWO PER BALE)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
METAL PINS OR STAPLES
TO SECURE THE
POLYETHYLENE LINING TO
THE STRAW BALES
METAL PINS OR STAPLES
TO SECURE THE
POLYETHYLENE LINING
TO THE STRAW BALES
CONCRETE
WASHOUT
WOOD POST 3"x3"x8'
BLACK LETTER 6" HEIGHT
3/8" TREATED
PLYWOOD 48"x24"
PAINTED WHITE
0.5" LAG SCREWS
INSTALLATION
1.UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION
PLAN TO INSTALL THE SYSTEM.
2.DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE
CONTAINMENT SYSTEM.
3.A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS AND
OTHER DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE
LINING.
4.INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING SHOULD
EXTEND OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED SYSTEMS SHOULD
BE INSTALLED OVER THE POOLING AREA WITH ENOUGH MATERIAL TO EXTEND THE
LINING OVER THE BERM OR CONTAINMENT SYSTEM. THE LINING SHOULD BE SECURED
WITH PINS, STAPLES, OR OTHER FASTENERS.
5.PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO
CONSTRUCTION EQUIPMENT AND OTHER TRAFFIC.
6.PLACE A NON-COLLAPSING, NON-WATER HOLDING COVER OVER THE WASHOUT
FACILITY PRIOR TO A PREDICTED RAINFALL EVENT TO PREVENT ACCUMULATION OF
WATER AND POSSIBLE OVERFLOW OF THE SYSTEM (OPTIONAL).
7.INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS.
8.POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED LOCATIONS.
9.WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS (SEE TEMPORARY
CONSTRUCTION INGRESS/EGRESS PAD ON PAGE 17) OR ALTERNATIVE APPROACH PAD
FOR CONCRETE WASHOUT SYSTEMS.
10.USE A 10 MIL. POLYETHYLENE LINED DUMPSTER AS AN ALTERNATE.
HIGH
VISABILTIY
PLASTIC
MESH FENCE
INSTALLATION: REMOVE THE GRATE FROM CATCH BASIN. IF USING OPTIONAL OIL
ABSORBENTS; PLACE ABSORBENT PILLOW IN UNIT. STAND THE GRATE ON END. MOVE THE
TOP LIFTING STRAPS OUT OF THE WAY AND PLACE THE GRATE INTO THE DANDY BAG®II SO
THAT THE GRATE IS BELOW THE TOP STRAPS AND ABOVE THE LOWER STRAPS. HOLDING
THE LIFTING DEVICES, INSERT THE GRATE INTO THE INLET.
MAINTENANCE: REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM VICINITY OF UNIT
AFTER EACH STORM EVENT. AFTER EACH STORM EVENT AND AT REGULAR INTERVALS,
LOOK INTO THE DANDY BAG®II. IF THE CONTAINMENT AREA IS MORE THAN 1/3 FULL OF
SEDIMENT, THE UNIT MUST BE EMPTIED. TO EMPTY UNIT, LIFT THE UNIT OUT OF THE INLET
USING THE LIFTING STRAPS AND REMOVE THE GRATE. IF USING OPTIONAL OIL
ABSORBENTS; REPLACE ABSORBENT WHEN NEAR SATURATION.
DROP INLET CURB PROTECTION
DUMPING STRAP ALLOWS FOR
EASY REMOVAL OF CONTENTS
STANDARD FABRIC IS AN
ORANGE WOVEN
MONOFILAMENT
DANDY BAG®II
LIFT STRAPS
GRATE
INSTALLATION AND MAINTENANCE GUIDELINES
DANDY BAG
C103
SW
P
P
P
D
E
T
A
I
L
S
w1
5
0
4
8
3
-
C
1
0
4
s
w
p
p
p
d
e
t
3'
3'
PLAN
1.ACTUAL LAYOUT DETERMINED IN
FIELD.
2.THE CONCRETE WASHOUT SIGN
SHALL BE INSTALLED WITHIN
30FT. OF THE TEMP. CONCRETE
WASHOUT FACILITY.
SECTION
CONCRETE WASHOUT
8"8"
8"X4" TRENCH TO BE
BACKFILLED AND COMPACTED
POSTS: STEEL T OR U TYPE, OR 2"X2" HARD WOOD POST
FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING
FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION.
LOAD SLOPE
LESS THAN 2%
2 TO 5%
5 TO 10%
10 TO 20%
MORE THAN 20%
MAX. DISTANCE ABOVE FENCE
100 FT.
75 FT.
50 FT.
25 FT.
15 FT.
(NO SCALE)
TREE PRESERVATION DETAIL
BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT TREES DURING CONSTRUCTION.
EX. GRADE
FENCE POST
HIGH VISABILTIY
PLASTIC MESH
FENCE
WATER DRIP-LINE
EX. TREE
(DRIP-LINE)
PROP. FENCE POST
WITHOUT WIRE SUPPORT WITH WIRE SUPPORT
(NO SCALE)DETAIL PROVIDED BY DANDY BAG
(NO SCALE)
FLOW
FINISH GRADE
UNDISTURBED
GROUND
FLOW
FINISH GRADE
UNDISTURBED
GROUND
NOTES:
1.THE SWPPP INFORMATION SIGN MUST BE
LOCATED NEAR THE CONSTRUCTION EXIT
OF THE SITE, SUCH THAT IT IS ACCESSIBLE
AND VIEWABLE BY THE GENERAL PUBLIC,
BUT NOT OBSTRUCTING VIEWS AS TO
CAUSE A SAFETY HAZARD.
2.ALL POSTED DOCUMENTS MUST BE
MAINTAINED IN A CLEARLY READABLE
CONDITION AT ALL TIMES THROUGHOUT
CONSTRUCTION AND UNTIL THE
NOTICE-OF-TERMINATION (NOT) IS FILED
FOR THE PERMIT.
3.CONTRACTOR SHALL POST OTHER STORM
WATER AND/OR EROSION AND SEDIMENT
CONTROL RELATED PERMITS ON THE SIGN
AS REQUIRED BY THE GOVERNING AGENCY.
4.SIGN SHALL BE LOCATED OUTSIDE OF
PUBLIC RIGHT-OF-WAY AND EASEMENTS
UNLESS APPROVED BY THE GOVERNING
AGENCY.
5.CONTRACTOR IS RESPONSIBLE FOR
ENSURING STABILITY OF THE SWPPP
INFORMATION SIGN.
SWPPP INFORMATION SIGN
COPY
OF
NOI
COPY OF
IDEM
NOTICE OF
SUFFICIENCY
SWPPP INFORMATION
DETAILED DESCRIPTION OF THE LOCATION OF THE
SWPPP DOCUMENTATION (BINDER AND SITE MAPS)
ON THE SITE.
SIGN TO BE CONSTRUCTED OF A
RIGID MATERIAL, SUCH AS PLYWOOD
OR OUTDOOR SIGN BOARD. SIGN
MUST BE CONSTRUCTED IN A
MANNER TO PROTECT DOCUMENTS
FROM DAMAGE DUE TO WEATHER
(WIND, SUN, MOISTURE, ETC.).
"SWPPP INFORMATION" MUST BE
DISPLAYED PROMINENTLY
ACROSS THE TOP OF THE SIGN,
AS SHOWN IN THE DETAIL.
3"
M
I
N
.
3"
M
I
N
.
COPY
OF
DRAINAGE
APPROVAL
LETTER
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
(NO SCALE)
NOTE: AVOIDING DAMAGE DURING CONSTRUCTION
THE SUREST WAY TO PROTECT TREES THAT ARE TO BE SAVED IS TO:
1.WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLAGGING AND/OR SIGNS ALL
CONSTRUCTION ROADS, PARKING PLACES FOR WORKERS, AND AREAS FOR STORAGE OF
BUILDING MATERIALS, GRAVEL AND SOIL.
2.WORK WITH THE UTILITY CONTRACTORS TO STAKE OUT THE EXACT LOCATION OF
TRENCHES.
3.ERECT PHYSICAL BARRIERS AROUND ALL "SAVED" TREES OR, BETTER YET, AROUND
GROUPS OF TREES, NEAR THE CONSTRUCTION ACTIVITY.
4.EXTEND BARRIERS AS FAR AS POSSIBLE BEYOND DRIPLINE.
APRON ON THIS
SIDE OF THE DIKE
SHALL BE FOLDED
UNDER THE DIKE
SECTION 20" AND
GLUED DOWN
CONSTRUCTION
AREA
ASPHALT PAVEMENT
EXISTING CONCRETE OR
SECTION A-A
DIKE PLAN VIEW
APRON
ADHESIVE
FLOW
ADHESIVE
20"20"
AD
H
E
S
I
V
E
AD
H
E
S
I
V
E
ADHESIVE
ADHESIVE
NOTES
1. INSTALLED SILT DIKE UNIT SHALL HAVE CONTINUOUS AND
FIRM CONTACT WITH PAVEMENT.
2. ADHESIVES SHALL BE LIQUID NAIL OR APPROVED EQUAL
FOR CONCRETE PAVEMENT APPLICATIONS AND EMULSIFIED
ASPHALT FOR ASPHALT APPLICATIONS.
ADHESIVE SHALL BE PLACED WHERE THE UNITS OVERLAP AND
A 20" STRIP ALONG BOTH EDGES.
FLOW
OVERLAP PER
MANUFACTURER'S
RECOMMENDATIONS
SILT DIKE
(ON EXISTING PAVEMENT)
(NO SCALE)
ALTERNATE
CONTRACTOR MAY USE A 10 MIL. POLYETHYLENE LINED DUMPSTER FOR CONCRETE WASHOUT.
SHEET 1 OF 1
DRAWN
CHECKED
QA
MFG
APPROVED
DWG NOSIZE
SCALE
REV
REPLACEABLE SEDIMENT BAGS
WITH GEOTEXTILE FILTER FABRIC
LIFT HANDLES
STAINLESS
STEEL
CLAMPING
BAND
REAR CURB GUARD FLAP
WITH MAGNETIC TIE-DOWNS
ALL PRODUCTS MANUFACTURED
BY INLET & PIPE PROTECTION, INC
DISTRIBUTED BY ADS
WWW.INLETFILTERS.COM
(866) 287-8655 PH
(630) 355-3477 FX
INFO@INLETFILTERS.COM
INSTALLATION:
1.
2.
REMOVE GRATE
DROP FLEXSTORM INLET FILTER ONTO
LOAD BEARING LIP OF CASTING OR
CONCRETE STRUCTURE
3.REPLACE GRATE
STANDARD 2"
OVERFLOW
AREA 11 GAUGE STEEL SUSPENSION SYSTEM
IPP
RE
V
I
S
I
O
N
S
A
N
D
I
S
S
U
E
S
Pa
r
t
o
f
t
h
e
S
E
/
4
o
f
S
e
c
t
i
o
n
2
3
,
T
o
w
n
s
h
i
p
1
8
N
o
r
t
h
,
R
a
n
g
e
3
E
a
s
t
,
C
l
a
y
T
o
w
n
s
h
i
p
,
H
a
m
i
l
t
o
n
C
o
u
n
t
y
,
I
n
d
i
a
n
a
W15.0483
PR
E
P
A
R
E
D
F
O
R
:
12
4
2
W
E
S
T
1
3
6
T
H
S
T
R
E
E
T
,
C
A
R
M
E
L
,
I
N
4
6
0
3
2
PROJECT NO.
SHEET NO.
CH
E
C
K
E
D
B
Y
:
DR
A
W
N
B
Y
:
RL
W
DE
S
I
G
N
E
D
B
Y
:
DW
G
N
A
M
E
:
PR
O
J
E
C
T
N
O
.
:
W1
5
.
0
4
8
3
DA
T
E
BY
05
.
1
9
.
2
0
1
6
SS
R
DA
T
E
:
RL
W
EN
G
I
N
E
E
R
S
31
7
|
8
4
6
-
6
6
1
1
80
0
|
4
5
2
-
6
4
0
8
31
7
|
8
4
3
-
0
5
4
6
fa
x
W E I H E
La
n
d
S
u
r
v
e
y
i
n
g
|
C
i
v
i
l
E
n
g
i
n
e
e
r
i
n
g
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
AL
L
A
N
H
.
W
E
I
H
E
,
P
.
E
.
,
L
.
S
.
-
F
O
U
N
D
E
R
10
5
0
5
N
.
C
o
l
l
e
g
e
A
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
I
n
d
i
a
n
a
4
6
2
8
0
we
i
h
e
.
n
e
t
Know what's below.
before you dig.Call
R
TR
A
D
E
R
'
S
P
O
I
N
T
C
H
U
R
C
H
O
F
C
A
R
M
E
L
SU
B
M
I
T
T
E
D
F
O
R
I
N
I
T
I
A
L
R
E
V
I
E
W
12
.
1
8
.
2
0
1
5
ML
T
THE SITE DOES NOT LIE IN A SPECIAL FLOOD
HAZARD AREA AS ESTABLISHED BY THE FEDERAL
EMERGENCY MANAGEMENT AGENCY - NATIONAL
FLOOD INSURANCE PROGRAM, WHEN PLOTTED
BY SCALE ON FLOOD INSURANCE RATE
#18057C207G, DATED NOVEMBER 19, 2014
FLOOD STATEMENT
STEVEN SCOTT RUCKER P.E. 11300279
SU
B
M
I
T
T
E
D
F
O
R
T
A
C
R
E
V
I
S
I
O
N
S
03
.
1
4
.
2
0
1
6
ML
T
NO EARTH DISTURBING
ACTIVITY MAY TAKE
PLACE WITHOUT AN
APPROVED STORM
WATER MANAGEMENT
PERMIT
NOTE
SU
B
M
I
T
T
E
D
F
O
R
D
R
A
I
N
A
G
E
A
P
P
R
O
V
A
L
04
.
2
0
.
2
0
1
6
ML
T
RE
V
I
S
E
D
F
O
R
D
R
A
I
N
A
G
E
A
P
P
R
O
V
A
L
05
.
1
2
.
2
0
1
6
ML
T
FI
N
A
L
C
O
N
S
T
R
U
C
T
I
O
N
P
L
A
N
S
05
.
1
9
.
2
0
1
6
ML
T
ROCK CHECK DAM
GEOTEXTILE
FILTER FABRIC
GEOTEXTILE
FILTER FABRIC
GEOTEXTILE
FILTER FABRIC
GEOTEXTILE
FILTER FABRIC
INDOT #5 AGGREGATE
(UPSTREAM FACE)
INDOT #5 AGGREGATE
12" LAYER
(UPSTREAM FACE)
CLEAN STONE
NOTE
1.REFERENCED IN CHAPTER 7 PAGE 97 IN THE INDIANA STORM WATER QUALITY MANUAL.
GENERAL RULE FOR SPACING:
THE ELEVATION OF THE BOTTOM
OF THE UPSTREAM BERM SHOULD
BE EQUAL TO THE ELEVATION OF
THE TOP OF THE SUCCEEDING
DOWNSTREAM BERM.
CHECK DAMS IN SWALE
TOP OF BANK
FLOW LINE
UPSTREAM VIEW DOWNSTREAM VIEW
ELEVATION A ELEVATION B
INSTALLATION
1.LAY OUT THE LOCATION OF THE CHECK DAM.
2.EXCAVATE A CUTOFF TRENCH INTO THE CHANNEL BOTTOM AND DITCH
BANKS, EXTENDING IT A MINIMUM OF 18 INCHES BEYOND THE TOP OF
THE DITCH BANK.
3.INSTALL AND ANCHOR FILTER FABRIC IN THE CHANNEL AND CUTOFF
TRENCH.
4.PLACE RIPRAP IN THE CUTOFF TRENCH AND CHANNEL TO THE LINES
AND DIMENSIONS SHOWN IN THE CONSTRUCTION PLANS. THE CENTER
OF EACH DAM MUST BE AT LEAST NINE INCHES LOWER THAN THE
UPPERMOST POINTS OF CONTACT BETWEEN THE RIPRAP DAM AND
CHANNEL BANKS (SEE ROCK CHECK DAM WORKSHEET ON PAGE 101).
5.EXTEND THE RIPRAP AT LEAST 18 INCHES BEYOND THE TOP OF THE
CHANNEL BANKS TO KEEP OVERFLOW WATER FROM ERODING AREAS
ADJACENT TO THE CHANNEL BANKS BEFORE IT RE-ENTERS THE
CHANNEL.
6.PLACE FILTER MEDIUM (INDOT CA NO. 5 AGGREGATE) ON THE UP-SLOPE
SIDE OF THE DAM. PLACE FILTER MEDIUM OVER THE ENTIRE FACE OF
THE DAM UP TO THE BASE OF THE OVERFLOW WEIR NOTCH.
7.STABILIZE THE CHANNEL ABOVE THE UPPERMOST DAM.
8.INSTALL AN EROSION-RESISTANT LINING IN THE CHANNEL BELOW THE
LOWERMOST DAM. THE LINING SHOULD EXTEND A MINIMUM DISTANCE
OF SIX FEET BELOW THE DAM.
9.ADDITIONAL SEDIMENT STORAGE CAN BE PROVIDED BY EXCAVATING A
SMALL SEDIMENT TRAP ON THE UPSTREAM SIDE OF THE CHECK DAM.
MAINTENANCE
- INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE
EVERY SEVEN CALENDAR DAYS.
- IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL AN
EROSION-RESISTANT LINER IN THAT PORTION OF THE CHANNEL.
- REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES ONE-HALF THE
HEIGHT OF THE DAM TO MAINTAIN CHANNEL CAPACITY, ALLOW DRAINAGE
THROUGH THE DAM, AND PREVENTLARGE FLOW FROM DISPLACING
SEDIMENT.
- ADD RIPRAP AND AGGREGATE AS NEEDED TO MAINTAIN DESIGN HEIGHT
AND CROSS SECTION OF THE DAMS.
- WHEN DAMS ARE NO LONGER NEEDED, REMOVE THE RIPRAP AND
AGGREGATE AND STABILIZE THE CHANNEL, USING AN
EROSION-RESISTANT LINING IF NECESSARY. (RIPRAP AND AGGREGATE
FROM THE DAM MAY BE REMOVED OR UTILIZED TO STABILIZE THE
CHANNEL.)
FOR SWALES AND DITCHES
(NO SCALE)
FLOW
MAX. 2:1
MAX. 2:1
INDOT #5 AGGREGATE
12" LAYER
(UPSTREAM FACE)
CLEAN STONE
FLOW
MAX. 2:1
MAX. 2:1
2 ACRES OR LESS OF DRAINAGE AREA
WATER FLOW
Z=%
RIPRAP
RIPRAP