HomeMy WebLinkAboutC300 GRADING AND DRAINAGE PLAND D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D D D D D D D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D D
D
D
D
D
D D D
D
D
D
D
D D
D
D
D
D
D
D D
D
D
D
D
D
D
D
D
D
D
D
D
D
E
(
A
)
E
(
A
)
E
(
A
)
E
(
A
)
E
(
A
)
G G G G G G G G
G
G
G
C
C C C C C C C C C C
G
G
C
W W W W W W W W W W W W W
136TH STREET
S
T
M
S
T
M
S
T
M
7
2
6
9
8
21
22222222
23
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
STM
STM STM
STM STM
D
D
STM STM
POND INFORMATION
EXISTING:||PROPOSED:
2yr = 869.31 ||2yr = 867.78
10-yr = 869.82 ||10-yr = 868.47
100-yr = 870.31 ||100-yr = 869.79
SPILLWAY = NONE ||SPILLWAY = 869.80
POND INFORMATION
PROPOSED:
2yr = 867.23
10-yr = 867.72
100-yr = 868.52
SPILLWAY = 869.20
1
1
1 2
2
3
4
5
6
7
8
812
9
10
11 11
13
11
EXISTING SWALE @ 1.5%
INVERT 865.35
INVERT 865.45
INVERT 865.40
INVERT 865.40 CONCRETE WEIR
TOP ELEV: 866.75
14
14
14
14
15
15
15
16 INVERT 865.50
18
875.4
868.5
19
18
20
STORM SEWER STRUCTURE DATA TABLE
STRUCTURE NUMBER
100 (EXIST.)
101
102
103
STRUCTURE TYPE
MANHOLE
MANHOLE
OUTLET CONTROL
???
TOP OF CASTING
867.11
868.35
870.00
865.80
CASTING TYPE
NEENAH R-4342
NEENAH R-4342
NEENAH R-3405
???
INVERT
INV IN = 864.18(SW)
INV IN = 864.40(N)
INV IN = 864.40(S)
INV OUT = 864.40(NE)
INV OUT = 864.73(S)
INV OUT = 864.55(N)
STORM SEWER PIPE DATA TABLE
DOWNSTREAM
STRUCTURE
101
102
103
UPSTREAM
STRUCTURE
100 (EXIST.)
101
101
SIZE
24"
15"
12"
MATERIAL
RCP
RCP
RCP
LENGTH
50'
65'
32'
SLOPE
0.44%
0.50%
0.46%
STORM SEWER STRUCTURE DATA TABLE
STRUCTURE NUMBER
200
201
202
203
STRUCTURE TYPE
???
MANHOLE
INLET TYPE E
INLET TYPE E
TOP OF CASTING
866.63
871.88
874.61
874.45
CASTING TYPE
???
NEENAH R-1642
NEENAH R-1642
NEENAH R-3405
INVERT
INV IN = 865.11(S)
INV IN = 865.45(S)
INV OUT = 865.35(N)
INV IN = 868.97(S)
INV OUT = 868.87(N)
INV OUT = 870.37(N)
STORM SEWER PIPE DATA TABLE
DOWNSTREAM
STRUCTURE
201
202
203
UPSTREAM
STRUCTURE
200
201
202
SIZE
15"
15"
12"
MATERIAL
RCP
RCP
RCP
LENGTH
25'
191'
140'
SLOPE
0.95%
1.79%
1.00%
END SECTION END SECTION
END SECTION END SECTION
104 CUSTOM BOX SEE DETAIL SEE DETAIL SEE DETAIL
AQUA SWIRL AQUA SWIRL SEE DETAIL SEE DETAIL SEE DETAIL
GENERAL GRADING NOTES
1.CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION PREVENTION PLAN AND DETAILS FOR CONSTRUCTION SCHEDULING AND EROSION
CONTROL MEASURES TO BE INSTALLED PRIOR TO EARTHMOVING ACTIVITIES.
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND
CONSTRUCTION METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT.
PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
3.TOPSOIL SHALL BE STRIPPED FROM ALL AREAS TO RECEIVE PAVING AND FROM WITHIN THE LIMITS OF PROPOSED BUILDINGS AND STRUCTURES.
TOPSOIL SHALL BE STRIPPED TO THE DEPTH AS NOTED IN THE GEOTECHNICAL REPORT.
4.AFTER STRIPPING TOPSOIL, PROOFROLL AREAS TO BE FILLED WITH A MEDIUM WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF
UNSUITABLE MATERIAL. RECOMMENDATIONS FOR DRYING, AMENDING AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED PAVED
AND/OR BUILDING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION BY THE OWNER'S GEOTECHNICAL TESTING REPRESENTATIVE.
5.TOPSOIL SHALL BE PLACED IN MOUNDING AREAS, NONSTRUCTURAL FILL AND/OR PLANTING AREAS TO A MINIMUM DEPTH OF 6". EXCESS TOPSOIL SHALL
BE REMOVED FROM THE SITE.
6.WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO GEOTECHNICAL REPORT AND/OR CONSULT WITH OWNER'S GEOTECHNICAL TESTING
REPRESENTATIVE FOR RECOMMENDATIONS.
7.FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM
ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX
INCHES FOLLOWING COMPACTION, PROPER MOISTURE CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY. ALL
FILL BENEATH PAVED AREAS, FLOOR SLABS AND FUTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY PER ASTM
D-1557. FIELD COMPACTING TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND THE REQUIRED COMPACTION ON EACH LIFT SHALL BE IN
ACCORDANCE WITH INDOT SECTION 211.
8.MAXIMUM LAWN SLOPE IS 3:1.
9.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY
THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE
SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.
10.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS.
THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH
APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
11.ALL SPOT ELEVATIONS ARE TO FINISHED GRADE.
12.COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS.
13.ALL GRADES AT BOUNDARY SHALL MEET EXISTING. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A
SMOOTH FIT AND CONTINUOUS GRADE. BUTT JOINTS SHALL BE PROVIDED AT TRANSITIONAL AREAS BETWEEN PROPOSED AND EXISTING PAVEMENT.
14.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
15.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY.
16.THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO THE START OF CONSTRUCTION. IF AN EXCESS OR SHORTAGE OF EARTH IS
ENCOUNTERED, THE CONTRACTOR SHALL CONFIRM WITH THE OWNER AND ENGINEER THE REQUIREMENTS FOR STOCKPILING, REMOVAL OR IMPORTING
OF EARTH.
17.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS AFTER INSTALLATION. CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING
CONDITIONS. ANY AREAS THAT HOLD WATER MORE THAN 1/8" DEEP SHALL BE CUT OUT AND CORRECTED TO POSITIVE DRAINAGE AT NO COST TO THE
OWNER/ DEVELOPER OR ENGINEER.
18.ADA ACCESSIBLE PARKING SPACES, RAMPS, AND ROUTES SHALL BE IN ACCORDANCE WITH THE LATEST ADA STANDARDS FOR ACCESSIBLE DESIGN.
19.VERTICAL CURVES, WITH A MINIMUM LENGTH OF 50', SHALL BE USED WHERE POSSIBLE BETWEEN VERTICAL CHANGES IN DIRECTION (SLOPE) TO ALLOW
FOR POSITIVE DRAINAGE AND SMOOTH TRANSITIONS.
20.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN
SANITARY SEWER FACILITIES, WATER MAIN, AND STORM SEWERS IS 18" OR LESS.
21.ALL DISTURBED AREA SHALL BE STABILIZED IN ACCORDANCE TO THE STORM WATER POLLUTION PREVENTION PLAN AND LANDSCAPE PLAN.
22.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR
ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RESOLVE WITH
THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED SHALL BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.
23.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED / REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT.
THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE
EXISTING CONDITION OF THE RIGHT-OF-WAY.
24.ALL EXISTING SUMP PUMP DISCHARGE SHALL BE MODIFIED TO DAYLIGHT FROM THE BANK OF THE PROPOSED POND, BE IT LENGTHENED OR
SHORTENED.
25.ONSITE STORM SEWER SHALL BE PRIVATE.
26.DOWNSPOUTS ENCOUNTERED DURING CONSTRUCTION SHALL BE CONNECTED TO PROPOSED DRAINAGE SYSTEM AND ROUTED TO POND. POSITIVE
DRAINAGE SHALL BE MAINTAINED AT ALL POINTS IN ROOF DRAINAGE SYSTEM.
GRADING PLAN NOTES
2' STONE STRIP WITH SSD.
6" PERFORATED PVC UNDERDRAIN. REFER TO THIS PLAN FOR INVERTS.
6" SOLID PVC DRAIN. REFER TO THIS PLAN FOR INVERTS.
STRUCTURE 104: SEE SPECIAL DETAIL ON SHEET C301. CONTRACTOR TO VERIFY
INVERT PRIOR TO CONSTRUCTION.
STRUCTURE 100: REPLACE EXISTING MANHOLE. CONTRACTOR SHALL FIELD VERIFY SIZE
AND REPLACE WITH SAME SIZE OR LARGER PRECAST CONCRETE MANHOLE. REATTACH
EXISTING 24" RCP (E) AT EXISTING INVERT.
STRUCTURE 101: SEE SPECIAL DETAIL ON SHEET C301. ATTACH EXISTING 10" PIPE
FROM WEST. HOLD WEST INVERT OF 10" PIPE WHEN REATTACHING PIPE (INVERT =
864.40'). NOTIFY ENGINEER IF INVERT IS SIGNIFICANTLY DIFFERENT.
24" RCP SHALL CONNECT STRUCTURE 101 TO STRUCTURE 100. REFER TO THIS PLAN
FOR SLOPE AND INVERTS.
3' STONE LEVEL SPREADER.
12" RCP WITH 6" PIPE GROUTED IN PLACE FOR. REFER TO DETAIL ON C302
EXCAVATE EXISTING 4" PIPE TO PROPOSED CONTOURS. ENSURE PIPE DAYLIGHTS AND
DRAINS POSITIVELY FROM PROPOSED BANK.
INSTALL CLEANOUT FOR UNDERDRAINS. SEE THIS PLAN FOR INVERTS
INSTALL RIP RAP PROTECTION FOR POND SECTION. SEE DETAIL ON C302
4" PERFORATED PVC UNDERDRAIN
CONNECT EXISTING ROOF DRAINS TO 6" HDPE PIPES. RUN AT MINIMUM SLOPE OF 1.0%.
8" HDPE ROOF DRAINS AT MINIMUM SLOPE OF 1.0%.
MECHANICAL WATER QUALITY UNIT. REFER TO DETAIL ON SHEET C302
DIVERSION STRUCTURE
EMERGENCY SPILLWAY. REFER TO DETAIL ON SHEET C301 AND C302
PROPOSED EAST DETENTION BASIN WITH 2% SLOPED BOTTOM
STRUCTURE 102: SEE SPECIAL DETAIL ON SHEET C302. CONTRACTOR TO VERIFY
INVERT PRIOR TO CONSTRUCTION.
EXISTING AREAS
PERVIOUS = 2.87 AC.
IMPERVIOUS = 2.79 AC.
PROPOSED AREAS
PERVIOUS = 2.41 AC.
IMPERVIOUS = 3.25 AC.
C300
w1
5
0
4
8
3
-
C
3
0
0
g
r
a
d
1
2
RIGHT OF WAY LINE
FENCE
BOUNDARY LINE
GRADING PLAN LEGEND
LINE TYPES
FLOW LINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER MAIN
STORM SEWER MAIN
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
AERIAL COMMUNICATIONS
G G G
W W
E(A)E(A)
E E E
C C C
C(A)C(A)
UNDERGROUND FIBER OPTICFOFO
SANITARY SEWER LATERALSANSAN
ROOF DRAINSTMSTM
SUB SURFACE DRAIN
CARMEL REQUIREMENTS
1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER
MANAGEMENT PERMIT.
2.DECORATIVE SIGNS, SPRINKLER SYSTEMS, TREES, LANDSCAPING MOUNDS, FENCES, LIGHT
POLES OR OTHER SUCH AMENITIES ARE NOT PERMITTED WITHIN THE RIGHT-0F-WAY.
3.M.F.P.G. = MINIMUM FLOOD PROTECTION GRADE M.F.P.G. OF ALL STRUCTURES FRONTING A
POND OR OPEN DITCH SHALL BE NO LESS THAN 2 FEET ABOVE ANY ADJACENT 100-YEAR
LOCAL OR REGIONAL FLOOD ELEVATIONS, WHICHEVER IS GREATER, FOR ALL WINDOWS,
DOORS, PIPE ENTRANCES, WINDOW WELLS, AND ANY OTHER STRUCTURE MEMBER WHERE
FLOOD WATERS CAN ENTER A BUILDING.
4.M.L.A.G. = LOWEST ADJACENT GRADE IS THE ELEVATION OF THE LOWEST GRADE ADJACENT
TO A STRUCTURE WHEN THE SOIL MEETS THE FOUNDATION AROUND THE OUTSIDE OF THE
STRUCTURE. (INCLUDING STRUCTURAL MEMBERS SUCH AS BASEMENT WALKOUT, PATIOS,
DECKS, PORCHES, SUPPORT POST, OR PIERS, AND RIM OF THE WINDOW WELL.
GRADE BREAK LINE
GR
A
D
I
N
G
A
N
D
D
R
A
I
N
A
G
E
P
L
A
N
ELECTRICAL RISER
GUY ANCHOR
ELECTRIC JUNCTION BOX
GENERATOR
STREET LIGHT
ELECTRIC MANHOLE
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
FIRE DEPT HOOKUP
FIRE HYDRANT
WATER MANHOLE
WELL HEAD
WATER METER
WATER VALVE
GAS METER
GAS VALVE
ELECTRIC METER
TRAFFIC SIGNAL POLE
BOLLARD
SIGN
PARKING WHEEL STOP
DOWN SPOUT
HANDICAPPED SPACE
COMMUNICATIONS RISER
STORM CLEANOUT
BEEHIVE INLET
CURB INLET
FLOOR DRAIN
ROUND INLET
SQUARE INLET
STORM MANHOLE
SANITARY SEWER CLEANOUT
SANITARY SEWER MANHOLE
PARKING LOT LIGHT (1 HEAD)
PARKING LOT LIGHT (2 HEAD)
ROW RIGHT OF WAY
BSL BUILDING SETBACK LINE
ESMT EASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
CMP CORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
SSD SUB SURFACE DRAIN PIPE
STM STORM
SAN SANITARY
STR STRUCTURE
CO CLEANOUT
TB TOP OF BANK
UTILITIES ABBREVIATIONS
OTHER
SPOT ELEVATION
CURB & GUTTER ELEVATION
SPOT ELEVATION
RE
V
I
S
I
O
N
S
A
N
D
I
S
S
U
E
S
Pa
r
t
o
f
t
h
e
S
E
/
4
o
f
S
e
c
t
i
o
n
2
3
,
T
o
w
n
s
h
i
p
1
8
N
o
r
t
h
,
R
a
n
g
e
3
E
a
s
t
,
C
l
a
y
T
o
w
n
s
h
i
p
,
H
a
m
i
l
t
o
n
C
o
u
n
t
y
,
I
n
d
i
a
n
a
W15.0483
PR
E
P
A
R
E
D
F
O
R
:
12
4
2
W
E
S
T
1
3
6
T
H
S
T
R
E
E
T
,
C
A
R
M
E
L
,
I
N
4
6
0
3
2
PROJECT NO.
SHEET NO.
CH
E
C
K
E
D
B
Y
:
DR
A
W
N
B
Y
:
RL
W
DE
S
I
G
N
E
D
B
Y
:
DW
G
N
A
M
E
:
PR
O
J
E
C
T
N
O
.
:
W1
5
.
0
4
8
3
DA
T
E
BY
05
.
1
9
.
2
0
1
6
SS
R
DA
T
E
:
RL
W
EN
G
I
N
E
E
R
S
31
7
|
8
4
6
-
6
6
1
1
80
0
|
4
5
2
-
6
4
0
8
31
7
|
8
4
3
-
0
5
4
6
fa
x
W E I H E
La
n
d
S
u
r
v
e
y
i
n
g
|
C
i
v
i
l
E
n
g
i
n
e
e
r
i
n
g
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
AL
L
A
N
H
.
W
E
I
H
E
,
P
.
E
.
,
L
.
S
.
-
F
O
U
N
D
E
R
10
5
0
5
N
.
C
o
l
l
e
g
e
A
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
I
n
d
i
a
n
a
4
6
2
8
0
we
i
h
e
.
n
e
t
Know what's below.
before you dig.Call
R
TR
A
D
E
R
'
S
P
O
I
N
T
C
H
U
R
C
H
O
F
C
A
R
M
E
L
SU
B
M
I
T
T
E
D
F
O
R
I
N
I
T
I
A
L
R
E
V
I
E
W
12
.
1
8
.
2
0
1
5
ML
T
W
S
N
E
THE SITE DOES NOT LIE IN A SPECIAL FLOOD
HAZARD AREA AS ESTABLISHED BY THE FEDERAL
EMERGENCY MANAGEMENT AGENCY - NATIONAL
FLOOD INSURANCE PROGRAM, WHEN PLOTTED
BY SCALE ON FLOOD INSURANCE RATE
#18057C207G, DATED NOVEMBER 19, 2014
FLOOD STATEMENT
STEVEN SCOTT RUCKER P.E. 11300279
SU
B
M
I
T
T
E
D
F
O
R
T
A
C
R
E
V
I
S
I
O
N
S
03
.
1
4
.
2
0
1
6
ML
T
NO EARTH DISTURBING
ACTIVITY MAY TAKE
PLACE WITHOUT AN
APPROVED STORM
WATER MANAGEMENT
PERMIT
NOTE
SU
B
M
I
T
T
E
D
F
O
R
D
R
A
I
N
A
G
E
A
P
P
R
O
V
A
L
04
.
2
0
.
2
0
1
6
ML
T
RE
V
I
S
E
D
F
O
R
D
R
A
I
N
A
G
E
A
P
P
R
O
V
A
L
05
.
1
2
.
2
0
1
6
ML
T
FI
N
A
L
C
O
N
S
T
R
U
C
T
I
O
N
P
L
A
N
S
05
.
1
9
.
2
0
1
6
ML
T
EMERGENCY OVERFLOW
PONDING LIMITS FOR A
CLOGGED CONDITION
3
4
5
6
7
8
DISCHARGE SUMMARY
PEAK DISCHARGE (CFS)
RETURN PERIOD
10 YR.
100 YR.
N/A 10.69
ALLOWABLE ACTUAL W/OFFSITE
12.84 12.80
NET SITE ACREAGE (MINUS ROW)
OFF-SITE ACREAGE
DETENTION VOLUME REQUIRED
DETENTION VOLUME PROVIDED
5.66 ACRES
33 ACRES
86,500 + 1,070 CUFT
137,200 CUFT
DETENTION VOLUME EXISTING 69,950 CUFT
*REQUIRED VOLUME IS BASED ON VOLUME PER 1993 DRAINAGE REPORT PLUS THE
ADDITIONAL VOLUME REQUIRED BY THE ADDED IMPERVIOUS AREA
9
10
11
12
13
D D LIMITS OF DISTURBANCE
14
15
16.86
PRE DEV.
53.71
16
17
18
FLOW DEPTH
ELEVATION868.5
19
20